Text

. .11- 1.

Duke 1%upt Cornpany

' PO Bar 2006 Charlotte. NC282011006 .

DUKEPOWER November 15,1995 U.S. Nuclear Regulatory Commission -

Attention: Document Control Desk Washington, D.C. 20555 RE: Catawba Nuclear Station Docket No. 50-413 and -414

Dear Sir:

' Please find attached information concerning the performance and operating status of the Catawba Nuclear  !

Station for the month of October,1995. j Very truly yours,  !

R. L. Weber, Man'ager l Nuclear Business Support RLW/ raw. l Attachments xc: Steward D. Ebneter C/O R. V. Crienjak Bob Martin, Project Manager Regional Administrator / Region 11 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Washington, D.C. 20555 Atlanta, GA 30323 INPO Records Center Ms. Margaret Aucoin 700 Galleria Parkway Nuclear Assurance Corporation Atlanta, GA 30339-5957 Suite 200 655 Engineering Drive Norcross, GA 30092 2843 American Nuclear Insurers R. J. Freudenberger clo Dottie Sherman, ANI Library Senior Resident inspector Town Center, Suite 300S - Catawba Nuclear Station 29 South Main Street West Hartford, CT 06107 2445 r ri t) u' u O q u19 o

b I 9511200076 951115 i

  • =r = =w*ev. PDR ADOCK 05000413 A

g l R PDR l

File:- GS-801.01 U.S. NRC - Catawba November 15,1995 -

Page 2 bc: K. S. Canady (EC08H)

T. E. Mooney (EC05N)

B. J. Horsley (ECO.1U)

T. E. Hunter (ON0102)

E. C. Fisher (MG0 LOP)

B. W. Walsh (ECllC)

Judy Smoak (CN00P)

G. A. Copp (EC050)

Candace Paton (PB02L)

. D. R. Groux (ON0lVP)

B. T. Faulkenberry (EC07C)

J. S. Forbes (CN01EG)

E. G. LaCasse (CN01BM)

Z. L. Taylor (CN0lRC)

S. F. Hatley (CNO3MC)

J. D. Jackson (PB02L)

D. A.Hanon (EC0$P)

G. R. Peterson (CN0lSM) 1 t

CPERATING DATA REPORT DOCKET (

E CDMPLETFD' TELE %!

OPEFATINS STATUS Catawba 1 31,1995

1. Unit Nant:

MONTH October. 1995 2. Reporting Period: October 1,1995-Ottober 3411 Rotes C (Gross C

3. Licensed Itersal Pcner (MWil: 1305*
4. Nameplate Rating (Gross MWel: 1145 1450.000 E AVERAGE dally POWER LEVEL 5. Design Electrical Rating (Net MWe):1192 f act:r p (MWe-Net) 6. Maxiset Dependable Capacity (Gross 1129 MWe): NUfEEd2 h 71 Since Last L

1152 7. Maxinus Dependable Capacity (Net MWel:B. -

- " _ If C Report. Bi$e Reasors: _ --

E IJ49

9. Power Level To Which Restricted, if Any (Net NWel:_ _ _ _ _
10. Reason For Restrictions, if any:_

!!46 _

(

1136 This Month

!!45 l 745.0

!!49 745.0

11. Hours In Reporting Pericd - 8 1152 12. N aber Of Hours Reactor Was Critical 745.0
13. Reatter Reserve Stutdenn Hours *-0" i

'  !!55 14. Hours Benerator On-Line '2497936

15. Unit Reserve Shatdcun Hours 905062 I0 1150 16. Gross Thersal Energy Generated (MWH1 B570B7
17. Gross Electrical Energy Eenerated (MWH) 100.0 II  !!47 18. Net Electrical Energy Generated (MWH) 100.0 l 19. Unit Senice Facter 101.9 IE 1148 20. Uriit Availability Factor 100.5
21. Unit Capacity Factor (Using MDC hat) 0.0 I3 lH5 22. Unit Capacity Factor (Using DER Net) i f Each):

l 23. Urit Forced Datage Rate

/

  1. I6 Igg 24. Shutdown Scheduled Over West 6 Menths (Type, Date None Startup:_

u 30 jj$g l l

25. If Shut fern At End Of Repnt Period. Estimated Date l of

!!59 26. Units in Test Etatus (frict to Coteercial Operationi:  !

l INITIAL CRITICALITY INITIALELECTRICITY l

CCMMERCIAL OPEEATION "M----_-_ _ _ _ _

UNIT SHUTDOWNS RND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CatantsW 1 .

DATE 11/13/3d .

REPORT MONTH October 1995 COMPLETED BY x. a. williams TELEPHONE (sus)-Jug-daeb (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X .NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test C-Refueling 2-Manual Scram Ent W Sheets For Licensee 3-Automatic Scram (LER D-Regulato n Restriction 4-Other (Explain) Event File Report ( M EG-0161))

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

-o l

r l: ,

i. .

DOCKET: 50-413 UNIT: Catawba 1 Date: 11/15/95 NARRATIVE

SUMMARY

MONTH: October 1995 Catawba Unit I began the month of October operating at 100% full power. The unit operated at or near 100% full power for the entire month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346

l 4

MONTHLY REFUEI ING INFORMATION REOUEST ,

1. ~ Facility name: Catawba. Unit 1 L
2. Scheduled next refueling shutdown: Mav 1996 3
3. Scheduled restart following refueling: Sentember 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF .

ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT,  ;

I

4. Will refueling or resumption of operation thereafter require a technical specification change or i

other license amendment?

If yes, what will these be? '  !

if no, has reload design and core configuration been reviewed by Safety Review Committee  ;

regarding unreviewed safety questions? l

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or  ;

performance analysis methods, significant changes in design or new operating procedures). l l

7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: MQ p
8. Present licensed fuel pool capacity: 14.1ll Size of requested or planned increase: ..-  :
9. Projected date oflast refueling which can be accommodated by present license capacity: l Sentember 2002 l I

DUKE POWER COMPANY DATE: November 15.1995 i

i Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 1

w - - , w e w

1 7

OPERATING DATA REPORT 1

DOCKET NO 501414 DATE Norseber 15. 1995  !

OPERATING STATU3' COMPLETED BY R.A. Williams TELEPHONE 704-382-5346  ;

!.'Urlt Names Catauba 2 l 2.' Reporting Period: October 1. 1995-October 31,1995

3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Gross Me): 1305e Notes *Naseplate Rating
5. Design Electrical Rating (Net Me): '  !!45 (Gross MWel calculated as [
6. Marious Dependable Capacity (Bross MWe): 1192 1450.000 MVA x .90 power  !
7. Manteue Dependable Capacity (Net M e):  !!29 - factor per Page 111, l
8. If Changes Occur in Capacity Ratings (Itees Musber 3 Through 7) Since Last NUREG-0020. j Report. Elve Reasons:  !
9. Power Level To Which Restricted, if Any (Net Mel
10. Reason for Restrictions, If any: l i

l This Month Yr.-to-Date Cumulative

! 1 d

11. Hours in Reporting Period 745.0 7296.0 80665.0 l a 12. Nueber Of Hours Reactor Was Critical 143.B 6358.4 63367.6 i 13. Reactor Reserve Shutdown Hcurs --0-- --0-- --0-- '
14. Hours Generator On-Line 143.4 6316.9 62378.3 )
15. Unit Reserve Shutdown Hours --0-- --0-- --0--

j- 16. Gross Thersal Energy Generated (MH) 462442 21322154 201021037 l 17. Gross Electrical Energy Generated (MWH) 163613 7547543 71246923 j 16. Het Electrical Er.ergy Generated (M H) 150684 7147602 67113235 j 19. Unit Service Factor 19.3 B6.6 77.3 j'

20. Unit Availability Factor 19.3 86.6 77.3
21. Unit Capacity Fattor (Using MIC Neti 17.9 B6.8 73.5

. 22. Unit Capacity Factor (Using DER Net) 17.7 B5.6 72.7

! 23. Unit Forced Outage Rate 0.0 5.6 8.5 j 24. Shutdcun Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Currentiv Refueling

25. If Shut Down At End Of Report Period. Estimated Date of Startup: November 20. 1995
26. Units In Test Status (Prior to Coseercial Operation): Forecast Achieved

! INiilAL CRITICALITY

, !NITIAL ELECTRICITY COMMERCIAL DPERATION i

J f

-v., - _ , , - .- _ - - , - . - - . - ,

- l OPERATING DATA REPORT DOCKET NO 50-414 UNIT Catsuba 2 DATE November 15. 1995 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH Oct der 1995 LAl AVERASE DAILY POWER LEVEL pfl AVERASE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1  !!45 17 0 2  !!43 12 0 3 1135 19 0 6  !!34 20 0 3 1079 21 0 6 035 22 0 7 0 23 0 E 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 1

'E UNIT SHOTDOWNS AND POWER REDUCTIONS DOCKET No. 50-414 UNIT NAME unAvvisA z .

DATE 11/13/y3 .

REPORT MONTH October 1995 - COMPLETED BY K. A _. Utilliams TELEPHONE. Ei v e ; .5 ts 2 - d a e t>

(1) (2) (3) (4)- (5).

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE -.

O P- DURATION O DOWN REPORT TEM COMPONENT ACTION-TO  !

.. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 6 95 6 S 601.57 C 1 RC FUELXX END-OF-CYCLE 07 REFUELING OUTAGE- i i

e (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equi 6 ment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report - (LER)

D-Regulatory Restriction , ,

4-Other (Explain) File (NUREG-0161)- 1 E-Operator Training & License Examination '

p o ro xhibit I-- Same Source H-Other (Explain) (Explain)

-L L._______- _ _-u_____ _ _ _ - - _ _ _.m-

  • _ - _ --wiwm _ -___m w-u- _ w- _ _ _ _ _ - _,s. .e* w m. -m-.Iewew w.me- e+ ma-e-w e- wmN+9**.e> nm ++e*e ' --ms e a - er z.m N N *e,eaa.==we w- _.h*=> __e

. i 4

4 l

DOCKET: 50-414 UNIT: Catawba 2 ,

Date: 11/15/95' >

NARRATIVE

SUMMARY

MONTil: October 1995 i

Catawba Unit 2 began the month of October operating at 100% full power. The unit operated at or near 100% until 10/06/95 at 1500, when the unit began decreasing power to begin end-of-cycle 07 refueling outage. The unit was taken off-line on 10/06/95 at 2326 for end-of-cycle 07 refueling outage. The unit was  ;

in the refueling outage the remainder of the month.

t l

J I

I l

1 Prepared by: R. A. Williams Telephone: (704)- 382-5346 i

2

MONTHLY REFUEI INO INFORMATION REOUEST

1. Facility name: Catawba Unit 2
2. Scheduled next refueling shutdown: Currentiv Refuelina
3. Scheduled restart following refueling: November 1995 THE PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CllANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 TliROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? -

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: .191 (b) in the spent fuel pool: 124
8. Present licensed fuel pool capacity: lill Size of requested or planned increase: : :
9. Projected date of last refueling which can be accommodated by present license capacity:

Scotember 2011 DUKE POWER COMPANY DATE: November 15.1995 Name of

Contact:

' R. A. Williams Phone: (7041- 382-5346