Text
,
l l
l OPERATINGDATAREPORT.
f L
i DOCKET ND 50-413 DATE November 15, 1995 OPERATING STATUS COMPLETEDi>Y R.A. Willines TELEPHONE 704-382-5346
- 1. Unit'Naee: Catawba 1
- 2. Reporting Period: October 1, 1995-October 31,1995
- 3. Licensed Thereal Power (Mut):
3411
- 4. Nameplate Rating (6ress MWe):
1305e Notes.eMaseplateRating-
- 5. Design Electrical Rating (Net Me):
1145 (Stoss Wel calculated as I
- 6. Marisue Dependable Capacity (Gross Me):
1192 1450.000 MVA :.90 power
- 7. Marious Dependable Capacity (Net MWe):.
1129 factor per Page lit, B. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last NUREG-0020.
Report. Give Reasons
[
- 9. Power tevel To Which Restricted, If Any (Net Me):
j 10.ReasenforRestrictions,Ifany:
j
.I t
This Nonth Yr.-to-Date Cueulative
[
1 i
.!!.HoursinReportingPeriod 745.0
'7296.0
.90649.0-l
- 12. N;sber Of Hours Reactor Was Critical 745.0 6344.3
'70855.9 i
- 13. Reactor Reserve Shutdown Hours
- --0--
t
- 14. Hours Benerator On-Line.
745.0 6249.2 69624.7
- 15. Unit Reserve Shatdown Hours-
- --0-- -
16.GrossTherealErergyGenerated(MH)
'24B7936 20646522 226989953
- 17. Eross Electrical Energy Generated ( W H).
905062 7432418 80!!6168
' +
- 18. Net Electrical Energy 6enerated ( WH)
B57087 7027562 75351024
- 19. Unit Service factor 100.0 85.7 76.8
- 20. Unit Availability factor 100.0 85.7 76.8 l
- 21. Unit Capacity Factor (Using MDC Net) 101.9 B5.3 73.4 l
- 22. Unit Capacity Factor (Using DER Net) 100.5 B4.1 72.6 l
- 23. Unit Forced Dutage Rate 0.0 0.7 8.4
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
{
None
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup
{
- 26. Units in Test Status (Prior to Coseercial Operation):
Forecast Achieved
.l INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION t
i 9511200077 951115 PDR ADOCK 05000413 R
PDR j
. - ~...
-_. - -. - -. ~., ~. - -. - ~
.. -. -. -. ~. - -...... -..
I 1
OPERATIN6 DATA REPORT l
>.i i
DOCKET.NO 50-413-IlNIT Catasha i
.. DATE Noveder 15. 1995 l
COMPLETED BY R.A. Williams j
TELEPN0lE 704-382-L i
i MONTH October. 1995 i
i E
AVERA6E DA!LY POWER LEVEL
,E AVERABE DA!LY POWER LEVEL l
(Mile-Net)
(MWe-Net 1 i
+
i i
1152 17 1159 2
1149 18 1156 l
i
~3
!!47 19 1153 l
. I
-4
!!46 20 1113 i
e i
6 1145 22 1157 I
7 1149 23 1156
{
-l l
-a
'1152 24 1149 l
i 10 1150 26 -
1156 I
11 1147 27 1150 e
12 1148 28 1154 f-i 13 1145 29 1159
)
i l
l l
. 16 1142 30 1159 j
i l
15 1158 31 1157 i
l 16 1158 i
l h
l 1
l 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME Carawua 1 DATE 11/16/ 9 d REPORT MONTH October 1995 COMPLETED BY
- x. a.
Williams TELEPHONE
( / ve ) -sug-d3ed (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent n Sneets For Licensee Event Report (h W G-0161))
(LER C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
-o
I i
i s
I l
DOCKET: 50-413 UNIT: Catawba 1
- l Date: 11/15/95 I
NARRATIVE
SUMMARY
{
i i
MONTH: October 1995 i
Catawba Unit I began the month of October operating at 100% full power. The unit operated at or near i
100% full power for the entire month.
j i
i j
i 4
I i
i I
i f
I Prepared by: R. A. Williams Telephone: (704)- 382-5346
. -.. _ - -.. _ - ~ - _.
. - ~..
i i.
l t
i j
MONTHLY REFUFI ING INFORMATION REQUEST l
1.
Facility name:
Catawha. Unit 1 i
2.
' Scheduled next refueling shutdown: Mav 1996 J
3.
Scheduled restart following refueling: Sentember 1996
(
- THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l
THROUGH.6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Ifyes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in' design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 160 l
8.
Present licensed fuel pool capacity: lill Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
1 Santamher 2002 I
I DUKE POWER COMPANY DATE: November 15.1995 Name of
Contact:
R. A. William =
Phone: (704)- 382-5346 i
s 1
l l
- i
OPERAi!NG DATA PIPORT DOCKET ND 50-414 DATE November 15. 1995 OPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346
- 1. Unit Name Catawba 2
- 2. Reporting Period October 1, 1995-October 31,1995
- 3. Licensed Thersal Power (MWt):
3411
- 4. Kaseplate Rating (Gross MWe):
1305e Notes eNaseplate Rating
- 5. Design Electrical Rating INet MWe):
!!45 (6ross MWel calculated as
- 6. Maxisus Dependable Capacity (6 toss MWe b 1192 1450.000 MVA x.90 power
- 7. Marisus Dependable Capacity (het MWe):
1129 factor per Page ill,
- 8. If Char.ges Occur in Capacity Ratings (Itess Number 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month Yr.-to-Date Cuaulative l
!!. Hours in Reporting Period 745.0 7296.0 80665.0-l
- 12. Nuaber Of Hours Reactor Was Critical 143.8 6358.4 63367.6
- 13. Reactor Reserve Shstdown Heurs
--0--
-+-
--0--
- 14. Hnuts Generator On-Line 143.4 6316.9 62378.3
- 15. Unit Reserve Shutdown Hours
--0--
- --0--
16, 6ross Thersal Energy Generated (r,WH) 462442 21322154 201021037
- 17. Gross Electrical Energy Generated (MWH1 163613 7547543 71246923
- 18. Net Electrical Energy 6enerated (MWH) 150684 7147682 67113235 i
- 19. Unit Service Factor 19.3 86.6 77.3 I
- 20. Unit Availability Factor 19.3 66.6 77.3
- 21. Unit Capacity Factor (Using MIC Net) 17.9 86.8 73.5
- 22. Unit Capacity Factor (Using DER Net) 17.7 B5.6 72.7
- 23. Unit Ferces Outage Rate 0.0 5.6 8.5
- 24. Shutdcwn Scheduled Over Nert 6 Months (Type, Date, and Duration of Each):
Current 1v Refueling
- 25. If Shut Dean 4t End Of Report Period. Estimated Date of Startup: November 20. 1995
- 26. L' nits in Test States (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~.. -, _.. -..... -
~.
..,~..
.--.~. _. ~. -
i i
OPERAllll6 DATA REPORT j
DOCKET 110-50-414
. Ull!T Catasha 2 DATE llovember 15. 1995
.j C0flPLETED BY R.A. Williams.
l TELEPHONE 704-302-5346 MONTH October,1995
.l
[.AI AVERAGE DAILY P0llER LEVEL -
A 9,.l -
AVERAGE DAILY Poller LEVEL A
(Mile-IletI (Mlle-IletI t
-l' 1145 17 0
-E.
1143 18 0~
i 3
1135
.19
'0 l
'4 1134 20 0
5 1079 21
-0 t
[
- 6 835 22 0
t 7.
0 23 0
l E
0 M^
0 e
9 0
25 0
l{
.I L10 0
26 0
i 0
27 0
i i
12 0
28 0
l 6
13 0
29 0
i 14 0
30 0
15 0
31 0
i 16 0
I 1
1 5
m UNIT SHUTDOWNS AND POWER REDUCTIONS
' DOCKET NO.
50-414 UNIT NAME caxanna z DATE 11/ id/ n REPORT MONTH October 1995 COMPLETED BY x.
A, williams TELEPHONE tius1-auz-osee (1)
(2)
(3)
(4)
(5)
R-MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT TECURRENCE' 6
95 6 S
601.57 C
1 RC FUELXX END-OF-CYCLE 07 REFUELING OUTAGE (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee.
C-Refueling 3-Automatic Scram (LER Event Report ( M G-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
r u,
DOCKET: 50-414 i
UNIT: Catawba 2 -
Date: 11/15/95 l
i i
NARRATIVE
SUMMARY
MONTH: October 1995 Catawba Unit 2 began the month of October operating at 100% full power. The unit operated at or near 100% until 10/06/95 at 1500, when the unit began decreasing power to begin end-of-cycle 07 refueling outage. The unit was taken off-line on 10/06/95 at 2326 for end-of-cycle 07 refueling outage. The unit was l
in the refueling outage the remainder of the month.
3 I
i Prepared by: R. A. Williams Telephone: (704)- 382-5346
_ =._.-. _ _ _
'l l
l l
y f
MONTHLY REFUELING INFORMATION REOUEST
?
l l.
. Facility name:
Catawba. Umt 2 i
2.
Scheduled next refueling shutdown: Currently Refueling 3.
- Scheduled restart following refueling: November 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF
- ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
. THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
("
' 4.'
Will refueling or resumption of operation thereafter require a technical specification change or
- other license amendment?
if yes, what will these be?
I If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting infonnation.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
l l
7.
Number of Fuel assemblies (a) in the core: 191 j
(b) in the spent fuel pool: 124 l
i l
8.
Present licensed fuel pool capacity: 14.18 l
Size of requested or planned increase: =
Projected date oflast refueling which can be accommodated by present license capacity:
9.
September 2011 r
DUKE POWER COMPANY DATE: November 15.1995 L
. Name of
Contact:
R. A. Williams Phone: (7041-382-5346 l
6 L
i I-l l
.