3/,4.5 IMERGENCY CORE COOLING SYSTEMS (ECCS) 3/4.5.1 SAFETY INJECTION TANKS
[uXtSrd,te LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System safety. injection tank shall be OPERABLE with:
a.
The isolation valve open, b.
A contained borated water volume of between 1679 (78%) and 1807 (83.8%)
cubic feet, c.
Between 1720 and 2300 ppe of baron, and d.
A nitrogen cover pressure of between 600 and 625 psig.
APPLICABILITY:
MODES 1, 2, 3*, and 4*.
ACTION:
a.
With one safety injection tank inoperable, except as a result of a closed isolation valve, restore the inoperable tank to OPERABLE j
status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
With one safety injection tank inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STAND 8Y within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT SHUTDOWN within the ne.xt 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.1 Each safety injection tank shall be demonstrated OPERABLE:
a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
1.
Verifying the contained borated water volume and nitrogen cover pressure in the tanks, and 2.
Verifying that each safety injection tank isolation valve is open.
- With pressurizer pressure greater than or equal to 1750 psia. When pressur-izer pressure is less than 1750 psia, at least three safety injection tanks must be OPERABLE, each with a minimum pressure of 235 psig and a maximum pressure of 625 psig, and a contained borated water volume of between 1332 (61%) and 1807 (83.8%) cubic feet.
With all four safety injection tanks l
OPERABLE, each tank shall have a minimum pressure of 235 psig and a maxiraum pressure of 625 psig, a boron concentration of between 1720 and 2300 ppe boron, and a contained borated' water volume of between 888 (39%) and 1807 (83.8%) cubic feet.
In MODE 4 with pressurizer pressure less than 392 psia (700 psia for remote shutdown from LCP-43), the safety injection tanks may be isolated.
9511090049 951107 PDR ADOCK 05000382 P
PDR WATERFORD - UNIT 3 3/4 5-1 AMENDMENT N019
1
)
e e
4 6
i l
i NPF-38-173 ATTACHMENT B
i O
3/4.,5 EMERGENCY CORE COOLING SYSTEMS (ECCS) i_,
3/4.5.1 SAFETY INJECTION TANKS l
LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System safety injection tank shall be OPERABLE with:
l a.
. The isolation valve open, b.
A contained borated water volume of between 926 479 (40% 78%) and 1807 (83.8%) l cubic feet, c.
Between 1720 and 2300 ppm of boron, and d.
A nitrogen cover-pressure of between 600 and 670 624 psig.
l APPLICABILITY: MODES 1, 2, 3*
and 4*.
ACTION:
1 a.
With one safety injection tank inoperable, except as a result of a l
closed isolation valve, restore the inoperable tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
I b.
With one safety injection tank inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.1 Each safety injection tank shall be demonstrated OPERABLE:
l a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
1.
Verifying the contained borated water volume and nitrogen cover pressure in the tanks, and 2.
Verifying that each safety injection tank isolation valve is open.
- With pressurizer pressure greater than or equal to 1750 psia. When pressurizer pressure is less than 1750 psia, at least three safety injection tanks must be OPERABLE. each with a minimum pressure of 235 psig and a maximum pressure of 670 625 psig,andacontainedboratedl water volume of between 1332 (61%) and 1807 (83.8%) cubic feet. With all four safety injection tanks OPERABLE. each tank shall have a minimum pressure of 235 psig and a maximum pressure of 670 626 psig, a boron concentration of between 1720 and 2300 ppm boron. and a l
contained borated water volume of between 888 (39%) and 1807 (83.8%) cubic feet. In MODE 4 with pressurizer pressure less than 392 psia (700 psia for remote shutdown from LCP-43) the safety injection tanks may be isolated.
UNIT 3 3/4 5-1 AMENDMENT NO. 19 WATERFORD
)
.lLN:
WATERFORD 3
{
DATE:.
1'0/25/95 poCUMENT ROUTING FORM l
TITLE ACR INITIAUDATE CC 4
President & CEO DOCNO:
W3F1-95J1_63 DOCDATE:
// - '/- 73 Chief Operating Officer
Subject:
Technical Specification Change Request NPF-38-173 Vice President Operat.ons, Waterford 3 SI se.
l.4w
. Site Administrative Programs Coordinator
. General Manager - Plant Operations AP SEE ATTACHED To:
NRC Document Control Desk
-Operations & Maintenance Manager AP SEE ATTACHED
-Technical Services Manager AP SEE ATTACHED Planning & Scheduling Manager From:
R.P. Barkhurst (PLC)
Systems Engineenng Supenntendent Secunty Superintendent Comments / Initials:
. Director Plant Modification & Construction Modification Management Supervisor
-Modification Scheduling & Estimating Supv.
Sr. Project Management Coordinator Project Management Coordinator Construction Manager Resolution / Initials:
. Director Site Support
-Site Business Services Manager
= Emergency Planning & Admin. Manager
-Materials, Purchasing & Contracts Mgr.
-Management Prog. & Excellence Coord.
Project Support Supenntendent Physician Medical Review Officer For Regulatory Correspondence Only
. Director Nuclear Safety AP
( f # /P h o/p f Policy & Directives Coordinator TO BE COMPLETED BY THE ORIGINATOR
. Technical Support Coordinator
-Licensing Manager AP
'M oln#f
- 1. This document contains commitments
-Operational Experience Engrg Manager O Yes, Commitment Evaluation Form Quality Assurance Manager completed C.J. Thomas DR (17 /#u/es-0 No s
. Training Manager
-Operations Training Supervisor
- 2. This document will cause a change to
-Simulator Training Supervisor thp FSAR
-Maintenance Training Supervisor GTYes, License Document Change Technical Training Supervisor Request completed
-Engineering Training & Accred. Supervisor O No
. Director Design Engineering AP SEE ATTACHED
- 3. This document requires va!idation
-Proc / Programs Engrg Manager in ecordance with W4.802
- Electncal/l&C Engineenng Manager u Yes, The validation process is complete
- Mechanical / Civil Engineenng Manager O Yes, However the process is complete Safety & Engineenng Analysis Manager O No
.Others P.L. Caropino OR kC /d426 Licensing Concurrence:
Return to:
P.L. Caropino (EXT. 6692)
ACR. ACi ; N REQUESTED DR - DOCUMENT REVIEW SI SIGNATURE ILN - INCOMING LOG NUMBER AC - AC'.ON FI FILE CC - COPY REQUIRED AP APrROVAL IN - FOR INFORMATION DOCNO - DOCUMENT NUMBER CD - CROSS DISCIPLINE REVIEW OR - ORIGINATOR DOCDATE - DOCUMENT DATE REV.DATE 01/05/95
.lLN:
WATERFORD 3 DATE
' f0/25/95 DOCUMENT ROUTING FORM TITLE ACR INITIAL /DATE CC President & CEO DOCNO:
W3F1-953)1_63 DOCDATE:
// - '/ 7J Chief Operatmg Officer
Subject:
Technical Specification Change Request NPF-38-173 Vice President. Operations. Waterford 3 SI w t, t 9.-
i
. Site Administrative Programs Coordinator j
. General Manager - Plant Operations AP SEE ATTACHED To:
NRC Document Control Desk Operations & Maintenance Manager AP SEE ATTACHED
-Technical Services Manager AP SEE ATTACHED Planning & Scheduling Manager From: R P. Barkhurst (PLC)
-Systems Engineenng Supenntendent
-Secunty Supenntendent Comments / Initials:
- Director Plant Modification & Construction Modification Management Supervisor Modification Scheduling & Estimating Supv.
-Sr. Project Management Coordinator Project Management Coordinator
-Construction Manager Resolution / Initials:
. Director Site Support
-Site Business Services Manager Emergency Planning & Admin Manager
-Materials, Purchasing & Contracts Mgr.
-Management Prog. & Excellence Coord.
Project Support Superintendent Physician Medical Review Officer For Regulatory Correspondence Only
. Director Nuclear Safety AP (ff!/ /F/gc/p{
Policy & Directives Coordinator TO DE COMPLETED BY THE ORIGINATOR Technical Support Coordinator Licensing Manager AP
%ns/ oMM(
- 1. This document contains commitments
-Operational Experience Engrg, Manager O Yes, Commitment Evaluation Form
-Quality Assurance Manager completed C J. Thomas OR GT /e/ty/95 0 No
. Training Manager
-Operations Training Supervisor
- 2. This document will cause a change to Simulator Training Supervisor ty FSAR h
-Maintenance Training Supervisor L(Yes, License Document change Technical Training Supervisor Request comp'e:
-Engineenng Training & Accred. Supervisor 0 No
. Director Design Engineenng AP SEE ATTACHED
- 3. This document requires validation
= Proc./ Programs Engrg. Manager in ccordance with W4.802 Electncal/l&C Engineenng Manager m Yes, The validation process is complete
-Mechanical / Civil Engineering Manager 0 Yes, However the process is complete
. Safety & Engineering Analysis Manager 0 No
.Others P.L. Caropino OR kC/0/.M Licensing Concurrence:
Return to:
P.L. Caropino (EXT. 6692)
ACR - ACTION REQUESTED DR - DOCUMENT REVIEW Si - SIGNATURE ILN - INCOMING LOG NUMBER AC ACTION FI. FILE CC - COPY REQUIRED AP -APPROVAL IN - FOR INFORMATION DOCNO - DOCUMENT NUMBER CD - CROSS DISCIPLINE REVIEW OR ORIGINATOR DOCDATE - DOCUMENT DATE REV DATE 01/05/95