3/,4.5 IMERGENCY CORE COOLING SYSTEMS (ECCS) 3/4.5.1 SAFETY INJECTION TANKS

[uXtSrd,te LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System safety. injection tank shall be OPERABLE with:

a.

The isolation valve open, b.

A contained borated water volume of between 1679 (78%) and 1807 (83.8%)

cubic feet, c.

Between 1720 and 2300 ppe of baron, and d.

A nitrogen cover pressure of between 600 and 625 psig.

APPLICABILITY:

MODES 1, 2, 3*, and 4*.

ACTION:

a.

With one safety injection tank inoperable, except as a result of a closed isolation valve, restore the inoperable tank to OPERABLE j

status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.

With one safety injection tank inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STAND 8Y within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT SHUTDOWN within the ne.xt 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1 Each safety injection tank shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1.

Verifying the contained borated water volume and nitrogen cover pressure in the tanks, and 2.

Verifying that each safety injection tank isolation valve is open.

  • With pressurizer pressure greater than or equal to 1750 psia. When pressur-izer pressure is less than 1750 psia, at least three safety injection tanks must be OPERABLE, each with a minimum pressure of 235 psig and a maximum pressure of 625 psig, and a contained borated water volume of between 1332 (61%) and 1807 (83.8%) cubic feet.

With all four safety injection tanks l

OPERABLE, each tank shall have a minimum pressure of 235 psig and a maxiraum pressure of 625 psig, a boron concentration of between 1720 and 2300 ppe boron, and a contained borated' water volume of between 888 (39%) and 1807 (83.8%) cubic feet.

In MODE 4 with pressurizer pressure less than 392 psia (700 psia for remote shutdown from LCP-43), the safety injection tanks may be isolated.

9511090049 951107 PDR ADOCK 05000382 P

PDR WATERFORD - UNIT 3 3/4 5-1 AMENDMENT N019

1

)

e e

4 6

i l

i NPF-38-173 ATTACHMENT B

i O

3/4.,5 EMERGENCY CORE COOLING SYSTEMS (ECCS) i_,

3/4.5.1 SAFETY INJECTION TANKS l

LIMITING CONDITION FOR OPERATION 3.5.1 Each Reactor Coolant System safety injection tank shall be OPERABLE with:

l a.

. The isolation valve open, b.

A contained borated water volume of between 926 479 (40% 78%) and 1807 (83.8%) l cubic feet, c.

Between 1720 and 2300 ppm of boron, and d.

A nitrogen cover-pressure of between 600 and 670 624 psig.

l APPLICABILITY: MODES 1, 2, 3*

and 4*.

ACTION:

1 a.

With one safety injection tank inoperable, except as a result of a l

closed isolation valve, restore the inoperable tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

I b.

With one safety injection tank inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1 Each safety injection tank shall be demonstrated OPERABLE:

l a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1.

Verifying the contained borated water volume and nitrogen cover pressure in the tanks, and 2.

Verifying that each safety injection tank isolation valve is open.

  • With pressurizer pressure greater than or equal to 1750 psia. When pressurizer pressure is less than 1750 psia, at least three safety injection tanks must be OPERABLE. each with a minimum pressure of 235 psig and a maximum pressure of 670 625 psig,andacontainedboratedl water volume of between 1332 (61%) and 1807 (83.8%) cubic feet. With all four safety injection tanks OPERABLE. each tank shall have a minimum pressure of 235 psig and a maximum pressure of 670 626 psig, a boron concentration of between 1720 and 2300 ppm boron. and a l

contained borated water volume of between 888 (39%) and 1807 (83.8%) cubic feet. In MODE 4 with pressurizer pressure less than 392 psia (700 psia for remote shutdown from LCP-43) the safety injection tanks may be isolated.

UNIT 3 3/4 5-1 AMENDMENT NO. 19 WATERFORD

)

.lLN:

WATERFORD 3

{

DATE:.

1'0/25/95 poCUMENT ROUTING FORM l

TITLE ACR INITIAUDATE CC 4

President & CEO DOCNO:

W3F1-95J1_63 DOCDATE:

// - '/- 73 Chief Operating Officer

Subject:

Technical Specification Change Request NPF-38-173 Vice President Operat.ons, Waterford 3 SI se.

l.4w

. Site Administrative Programs Coordinator

. General Manager - Plant Operations AP SEE ATTACHED To:

NRC Document Control Desk

-Operations & Maintenance Manager AP SEE ATTACHED

-Technical Services Manager AP SEE ATTACHED Planning & Scheduling Manager From:

R.P. Barkhurst (PLC)

Systems Engineenng Supenntendent Secunty Superintendent Comments / Initials:

. Director Plant Modification & Construction Modification Management Supervisor

-Modification Scheduling & Estimating Supv.

Sr. Project Management Coordinator Project Management Coordinator Construction Manager Resolution / Initials:

. Director Site Support

-Site Business Services Manager

= Emergency Planning & Admin. Manager

-Materials, Purchasing & Contracts Mgr.

-Management Prog. & Excellence Coord.

Project Support Supenntendent Physician Medical Review Officer For Regulatory Correspondence Only

. Director Nuclear Safety AP

( f # /P h o/p f Policy & Directives Coordinator TO BE COMPLETED BY THE ORIGINATOR

. Technical Support Coordinator

-Licensing Manager AP

'M oln#f

1. This document contains commitments

-Operational Experience Engrg Manager O Yes, Commitment Evaluation Form Quality Assurance Manager completed C.J. Thomas DR (17 /#u/es-0 No s

. Training Manager

-Operations Training Supervisor

2. This document will cause a change to

-Simulator Training Supervisor thp FSAR

-Maintenance Training Supervisor GTYes, License Document Change Technical Training Supervisor Request completed

-Engineering Training & Accred. Supervisor O No

. Director Design Engineering AP SEE ATTACHED

3. This document requires va!idation

-Proc / Programs Engrg Manager in ecordance with W4.802

  • Electncal/l&C Engineenng Manager u Yes, The validation process is complete
  • Mechanical / Civil Engineenng Manager O Yes, However the process is complete Safety & Engineenng Analysis Manager O No

.Others P.L. Caropino OR kC /d426 Licensing Concurrence:

Return to:

P.L. Caropino (EXT. 6692)

ACR. ACi ; N REQUESTED DR - DOCUMENT REVIEW SI SIGNATURE ILN - INCOMING LOG NUMBER AC - AC'.ON FI FILE CC - COPY REQUIRED AP APrROVAL IN - FOR INFORMATION DOCNO - DOCUMENT NUMBER CD - CROSS DISCIPLINE REVIEW OR - ORIGINATOR DOCDATE - DOCUMENT DATE REV.DATE 01/05/95

.lLN:

WATERFORD 3 DATE

' f0/25/95 DOCUMENT ROUTING FORM TITLE ACR INITIAL /DATE CC President & CEO DOCNO:

W3F1-953)1_63 DOCDATE:

// - '/ 7J Chief Operatmg Officer

Subject:

Technical Specification Change Request NPF-38-173 Vice President. Operations. Waterford 3 SI w t, t 9.-

i

. Site Administrative Programs Coordinator j

. General Manager - Plant Operations AP SEE ATTACHED To:

NRC Document Control Desk Operations & Maintenance Manager AP SEE ATTACHED

-Technical Services Manager AP SEE ATTACHED Planning & Scheduling Manager From: R P. Barkhurst (PLC)

-Systems Engineenng Supenntendent

-Secunty Supenntendent Comments / Initials:

  • Director Plant Modification & Construction Modification Management Supervisor Modification Scheduling & Estimating Supv.

-Sr. Project Management Coordinator Project Management Coordinator

-Construction Manager Resolution / Initials:

. Director Site Support

-Site Business Services Manager Emergency Planning & Admin Manager

-Materials, Purchasing & Contracts Mgr.

-Management Prog. & Excellence Coord.

Project Support Superintendent Physician Medical Review Officer For Regulatory Correspondence Only

. Director Nuclear Safety AP (ff!/ /F/gc/p{

Policy & Directives Coordinator TO DE COMPLETED BY THE ORIGINATOR Technical Support Coordinator Licensing Manager AP

%ns/ oMM(

1. This document contains commitments

-Operational Experience Engrg, Manager O Yes, Commitment Evaluation Form

-Quality Assurance Manager completed C J. Thomas OR GT /e/ty/95 0 No

. Training Manager

-Operations Training Supervisor

2. This document will cause a change to Simulator Training Supervisor ty FSAR h

-Maintenance Training Supervisor L(Yes, License Document change Technical Training Supervisor Request comp'e:

-Engineenng Training & Accred. Supervisor 0 No

. Director Design Engineenng AP SEE ATTACHED

3. This document requires validation

= Proc./ Programs Engrg. Manager in ccordance with W4.802 Electncal/l&C Engineenng Manager m Yes, The validation process is complete

-Mechanical / Civil Engineering Manager 0 Yes, However the process is complete

. Safety & Engineering Analysis Manager 0 No

.Others P.L. Caropino OR kC/0/.M Licensing Concurrence:

Return to:

P.L. Caropino (EXT. 6692)

ACR - ACTION REQUESTED DR - DOCUMENT REVIEW Si - SIGNATURE ILN - INCOMING LOG NUMBER AC ACTION FI. FILE CC - COPY REQUIRED AP -APPROVAL IN - FOR INFORMATION DOCNO - DOCUMENT NUMBER CD - CROSS DISCIPLINE REVIEW OR ORIGINATOR DOCDATE - DOCUMENT DATE REV DATE 01/05/95