Final Significant Const Deficiency Rept Re Cracked Bosses on Diesel Generator Lube Oil Pump Discharge Nozzles.Initially Reported on 840425.Bosses Machined Down 0.06 Inches.Colt Adapters to Be Installed by 841026
ML20093P025
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/28/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8411060099
Download: ML20093P025 (2)


Text

. .-_ _ _ - _ _ _ _ _ _ _ - _ - _

  1. 4_ ^

. Thomes J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4306316 Vica Preskjent .

Engineering aruf Construction September 28,-1984 Dr. Thomas E. Murley, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I -

g 631 Park Avenue King of Prussia, Pennsylvania 19406 gD'

Dear Dr. Murley:

SIGNIFICANT CONSTRUCTION DEFICIENCY DEFECTS IN LUBE OIL PUMP DISCHARGE NOZZLES HOPE CREEK GENERATING STATION On April 25, 1984, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. E. C.

McCabe, advising of a potentially significant construction deficiency regarding cracked bosses on our Diesel Generator lube oil pump discharge nozzles. On May 25, July 18 and August 7, 1984, interim reports were submitted to your office.

The following information, in conjunction with our July 18th report, constitutes our final report in accordance with 10CFR50.55(e).

On August 6, 1984, a Colt Industries representative examined the condition of our Diesel Generator lube oil pump discharge nozzles and recommended that the face of the bosses be machined down 0.060 inch to determine the extent of the surface indi-cations. This was done under the supervicion of a represent-ative from Colt Industries. and resulted in the removal of all surface indications as confirmed by nondestructive examination (dye-penetrant) .

Closure of Nonconformance Report No. 3926 is pending receipt and installation of the modified adapters from Colt Industries.

This activity is scheduled for completion by October 26, 1984.

Very truly yours, W

A U3 8411060099 340928 gDRADOCK 05000354 PDR

' d

/E 2 7

? '. g. .s:

j.

h

( Dr. . .T. E. Murley 2 9-28-84 C : Of'fice of Inspection and Enforcement

~

-Division of' Reactor. Construction ~ Inspection

[" Washington, D. C.-20555 NRC ~ Resident Inspector P. O. Box 241 Hancocks Bridge, NJ.08038 Records Center Institute. of Nuclear . Power Operations 1100. Circle 75-Parkway, Suite 1500 Atlanta, GA'30339 j

_ . . _ . . . . . . . . _ _ . .