Final Part 21 & Deficiency Rept Re Questionable Starting Matl in G&W Bonney Forge Stainless Steel Olets.Initially Reported on 840515.Twelve Olets Returned to Hub,Inc
ML20092K263
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/14/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-230, REF-PT21-84-281-000 174, PT21-84-281, PT21-84-281-000, NUDOCS 8406280185
Download: ML20092K263 (4)


Text

s

~~

g s

+

CD&L Carolina Power & UOM Company

'~ ^

msaunisumususse pr} $ }lb, ".w=x 101; New Hill, N.C.

vu, P.O Bo 27562

- l, June 14, 1%4 t

?

J 4

Mr. James.P. O'Reilly NRC-230 United States Nuclear Regulatory Cc:nmission Region II 101 Marietta.-Strest, Northwest (Suit 6 2900)

Atlanta,,' Georgia 303037,[

s CAROLINA POWER a LTGHT C0itPANY' 4

SHEARON, HARRIS NUCLEAR POWER ELANT 1986'- 900,000 KW - UNIT 1 1

STAINLESS,STEF.I/OLETS c

QUESTIONAlLE, STARTING MATERIAL, ITEM 174 t

,/; - -

Dear Mr. 7 '-Rei.lly:

0

+

e i

'/

s

.. ; <j,/

Attached is th'e final report on the subject item which was deeir.ed c '.>f reportable ~ peil tbe provisions of ;10CTR50.55(e) ard 10CFR, Part ',11,h l'

on May'U, 1984. With this report;r.Carolind Power & Light Comph.ny' considers this matter closed.

d

' Yl' c

cf.

/

If you have any questions regarding thfa matter, please do not hesitate.to contact me.

/

p

t Yours very trulyi si

/' <

j

\\

.1

~_d_.-'

~

7) f te & M

, el i

f

4-

,/

R. M. ?arsolis'

/

Project General 1%nagar '

i

/

g,

Shear 6n Harris Nucl' ear lFower Plant /

, './ '/

j

-i

,?

>j

)e[,

.],{, :', a L J BMP/ttj j;e f(

,r '-

m

^

ad 1 i 1,

f,

,/

,1

/ :.

o,

'7 4.: 7,'

p j,b/ y } ;;7,

/ ',

Attachuent

~

~

i uf-1.

, '" q,,' : v '^/ '

/,

C'_..

I }

s i p\\V ~ {

i,lt 4',L/y.

i Messrs., G.: Maxwell /RLPrevette, (KRC-SifRPP),

j cc:

.Mr. R."C. DeYoung (NRC)..

1 A

/y

. i

',' (

y l'

nl

..(.ff

_+

.f(

kk, '

5

-y

..c,

3 y

v j.

~

.s ')

Yy b

- 7'{',

    • f

.ls.

s

. j f,>

q

.g

, f:

x q

f' iy

)

_\\

.,c"'"

p

'o j

,i*

s G40620018564b614N

~

/ h~ )'a k4 r.r 3 i DR ADOCK L}bOC OFhicIAL,ccPY N

j gx; 3,,9 y 27,glj j' w/

2rgg ge m.

sg' !. iy MU

lt A p' 'v c>

n n' o i

i, h'

  • ~ ~

^*

~

t CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 FINAL REPORT STAINLESS STEEL OLETS-QUESTIONABLE STARTING MATERIAL ITEM 174 JUNE 14, 1984 REPORTABLE UNDER 10CFR50.55(e) AND 10CFR21-l r

4 f

i s

~

l t

n y

- ', ~

j

-A-4

s s

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit No. 1, 10CFR50.55(e) and 10CFR, Part 21 reportable deficiency. Stainless steel olets received with questionable starting material.

ITEM:

Stainless steel olets supplied by Hub, Inc. were manufactured by C&W Bonney Forge from starting material which was not purchased by them under the provisions of ASME NCA-3800, nor did the starting material receive the product analysis per NCA-3867.4(e) for upgraded stock material.

SUPPLIED BY:

Hub, Inc., Tucker, Georgia.

MANUFACTURED BY:

C&W Bonney Forge, Carlinville, Illinois DATE PROBLEM OCCURRED:

Prior to February 15, 1984 DATE PROBLEM WAS REPORTED: On March 29, 1984, Hub. Inc. (Mr. C. E. Thornton) notified the NRC (Mr. E. L. Jordan) of a possible 10CFR, Part 21 condition.

On May 15, 1984, CP&L (Mr. N. J. Chiangi) notified the NRC (Mr. A. Hardin) of a reportable item for the l

provisions of 10CFR50.55(e) and 10CFR, Part 21.

SCOPE OF PROBLEM:

Twelve (12) of the ol-ts were received on site manufactured of the subject material. None had been issued from the site warehouse for installation.

SAFETY IMPLICATION:

The olets could have been installed in Category 2 or 3 systems.

REASON DEFICIENCY IS REPORTABLE:

Since the tests were not performed, the items may not have met specification requirements, and the potential for failure exists.

4 CORRECTIVE

_ ACTION:

The twelve (12) olets received on site have-been returned to Hub, Inc.

e' k

CP&L was notified by letter dated June 8, 1984 of the following actions taken by the manufacturer: All inventory was correctly identified by the manufacturers' Quality Control Department and segregated into two groups, Nuclear and Commercial.

In addition, all nuclear orders processed through the manufacturers' Quality Control Department are to receive at least two reviews to verify correct material assignment.