Monthly Operating Repts for Jan 1992 for Peach Bottom Atomic Power Station,Units 2 & 3
ML20092G459
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/31/1992
From: Baron M, Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-92-14025, NUDOCS 9202200143
Download: ML20092G459 (14)


Text

.

$Ch,l, + lIo2.6

=

PIIILADELPlilA ELECI'RIC COMPANY PEACil DCfrTOM ATOMIC l'OWI.R STATION R. D. - 1, llox 208 -

- Delta. Pennsylonia 17314-esaan monou-sus rowse or isceu ewa

'(717)4567014

. D; B. Miller, Jri-t/ ice President February 13, 1992 Docket Nos. 50-277 -

50 278

~U.S. Nuclear Regulatory Commission Document' Control Desk-

- Washington, DC. 20555 ~-

SUBJECT:

' Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:-

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units

- 2 and 3 for the month of January 1992 forwarded pursuant to Technical Specification 6.9.1.d under the gtiidance of Regulatory Guide 10.1, Revision 4.

Sincerely,

yh hjPf[

Y.,)

DBM/ AFTPJN/DRK b: cme :

Enclosure cc:

. R.A.' Burricelli, Public Service Electric & Gas

- T.M. Ger.usky, Commonwealth of Pennsylvania J.J.'Lyash, USNRC Senior Resident Inspector

R.I..McLean, State of Maryland

-T.T. Martin, Administrator, Region I, USNRC H.C. Schwemm,' Atlantic Electric i

C.D. Schaefer, Delmarva Power INPO Records Center 260'0"f7 r

i l

9202200143 920131 I

.PDR ADOCK-05000277 gli R

PDR

\\\\

_. - _. _.. ~ _,. -. _, _..

NRC hionthly Operations Summary Prach llottom Atomic Power Station January 1992 UNIT 2 Unit 2 began the month at nominal 100% power. On January 2, power was reduced to 80% l<cause of high oil temperatures in the condensate pump thrust bearing oil bath.The oil was replaced with a lighter type and power was returned to 1001 Full power was maintained through the end of the month except for a short power-

- reduction on January 26 to perform MSIV testing.

UNIT 3 -

Unit 3 began the month in startup with pressure increasing. Criticality was reached on January 2.and the generator was synchronized to the grid ca January 9. Power was increased to 23% and h:ld at that level until

+

repairs were completed on the #3 TIP machine. Power was then increased to 35% and held there to complete feedwater flow testing. Full power was teached on January 20 and a short load reduction was taken cu January 23 to minimize the possibility of a transient during restoration of a main steam line flow transmitter. Full power.

was restored by January 24 and remained at that level through the end of ine month.

CC0192.NRC

Docket No. 50-277 Attachment to Monthly Operating Report for January 1992 UNIT 2 REFUEL. LNG INFORMATION 1.

Name of facility:

Peach Ilottom Unit 2 2,

Scheduled date for next refueling shutdown:

Reload 9 scheduled for September 5,1712.

3.

Scheduled date for restart following refueling:

Restar' following refueling forecast for November 20,1992.

- 4.

Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

No.

If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A CC0192,NRC

d 1

i Dockct No. 50 277 Attachment to Monthly Operating Report for January 1992 Page 2 l

i UNIT 2 REFUELING INI'ORM ATION (Continued) i

\\

i 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pott:

)

(a)

Core 764 Fuel Assemblics (b)

Fucl Pool - 18% Fuel Assemblics,58 Fuel Rods 1

8.

The present licensed spent fuel pool storage capacity and the sire of any increase ir. licensed storage capacity that has been requested or is planned,in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel asscmblics.

9.

The projected date of the last refuelbf hat can be discharged to the spent fuel ptai assuming the present capacity:

September 2(XO without full core offload capability.

September 1997 with full core offload capability, 1

CC0192.NRC

}

Docket No. 50 278 Attachment to Monthly Operating Report for January 1992 UNIT 3 RFFUFI,1NG INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 9 scheduled for September 4,1993 3.

Scheduled date for restart following refueling Restart following refueling scheduled for October 29,1993 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? -

No if answer is yes, what, in general, will these be?

N/A-5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A L

6.

Important iieensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 1

lu CC0192.NRC l

l l

r

Docket No. 50-278 Attachment to Monthly Operating Report for January 1992 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 7.

The number of fuel assemblics (a) in the core and (b) in the spent fuel s.torage pool:

(a)

Core 764 Fuct Assemblics (b)

Fuel Pool 1689 Fuel Assemblics,6 Fuct Rods 8.

The present licensed spent fuel [ mot storage capacity and the sire of any increase in licensed storage capacity that has been requested or is planned, in numler of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity; September 20M without full core offload capability.

September 1998 with full core offload capability.

l l

l

(

l l

l l

l CQ192.NRC I

1,,

V J

AVERACE DAILY UNil POWER LEVEL DOCKET NO. 50 277 q

.....+.......................

UNIT ?[ACH BOTTOM UNIT 2 DATE FEBRUARY 1$, 1992 COMPANY PHILADELPHIA ELECTRIC COMPANY-M. J. BARDW

~ SUPERVISOR REPORit GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 3321 MONTH JANUARY 1992 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWC-NCT)

(MWE -hE T )

1 1D66 17 1071 2-1027 18 1070 3

B66' 19 1071 4

'1D61 20 1070 5

1D62 21 1071 6

1D69 22 1071 7

1063 23 1071 8

1D64 24 1070 9

1D69 ~

25 1071 10 1D64 26 1038 11 1068 27 1067 12 1074 28 1071 13 1071 29 1072 14 1071 30 1074 15 1071 31 1071 16 1071

9 i

s AVERAGE DAILY UNif POWER LEVEL DOCKET NO. 50 - 278 UNif PEACH BOTTOM UNIT 3

.....'J AR Y 15, 1992 DATE TEBR COMPANY 6 HILADELPHI A ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PE ACH BOTTOM ATOMIC POWER ST AllON TELEPHONE (717) 456+7014 EXT. 3321 MONTH JANUARY 1992 Dt

  • AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MJ. NE1)

(MWE-NET) 1 0

17 451 2

0 18 489 3

0 19 805 4

0 20 882 5

0 21 1063 6

0 22 1058 7

0 23 1050 8

0 24 944 9

87 25 1042 10 170 26 1054 11 183 27 1046 12 182 28 1063 13 184 29 1068 14 304 30 1066 15 332 31 1062 16 444 l

s OPERATING DATA REPORT DOCKET No. 50 - 277 DATE FEBRUARY 15, 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARDN SUPERVISOR REPORTS CROUP PEAC4 BOTTOM ATCitic POWER STATloN TELEPHONE (717) 456-7014 EXT. 3321 OPERATING STATu

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PER100:

JANUARY, 1992

3. LICENSED THERMAL POWER (MWT):

3293

- 4. NAMEPL ATE RATING (GROSS MWE):

1152

5. DESIGN ELECTRICAL RATING'(NET MWE):

1065

6. MlXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. max! MUM DEPENDABLA, CAPACITY (WET MWE):

1055

8. IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS NUMBE9 3 THROUGA 7) SINCE LAST REPORT, GIVE REASCNS
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS IJk RESTRIC110ms, IF ANY:

THIS MONTN YR*TO-DATE CUMULATIVE

11. HOURS IN REP 0pilNG PERIOD 744 744 154,080
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 92,998.0
13. REACTOR RESERVE SRUTDOWN HOURS 0.0 0.0 0.0

- 14. HOURS GENERATOR ON LINE 744.J 744.0 89,581.5

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH, 2,419.464 2,419,464 264,959,103
17. GROSS ELECTRICAL ENERGY GENERATED (MWh)

C*1.706 811,700 87,100,290

...~........

18. NE' ELECTRICAL ENERGY GENERATED (MWH) 788,702 788,702 83,405,935 FAGC 1 0F 2 i

a

-~

+

e OPERATINO DATA REPORT (CONTINUED)

DOCKET NO. 50 277 DATE FEBRUARY 15, 1992 TMi$ MONTH YR*10 DATE CUMULAllVE

19. UNIT SERVICE FACTOR 100.0 100.0 58.1
20. UNil AVAILABILITY TACTOR 100.0 100.0 58.1
21. UNIT CAPAClif FACTOR (U11NG MDC NET) 100.5 100.5 51.3
22. UNIT CAPACITY FAC10R (USING DER NET) 99.5 99.5 50.8
23. UNIT FORCED OUTAGE RATE 0.0 0,0 14.5
24. SMJTDOWN$ SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)2
25. If $RUIDOWN AT END Of REPORT PER100, ESilMATED DATE OF STARTUP: N/A
26. UN115 IN TEbi STATU$ (PRIOR TO COMMERCIAL DPERAil0N):

FORECAST ACHIEVED INITIAL CRiflCAllTV 09/16/73 INITIAL-ELEC1RICITY 02/18/74.

COMMERCIAt OPERAfl0N 07/05/74 PAGE 2 0F 2 l-t-

h

OPERATING DATA REPDRT DOCKET No. 50 - 278 DATE FEBRUARY 15, 1992

]

COMPLETED BY PHILACELPHIA ELECTRIC COMPANY l

M. J. BARON SUPERV1SCR REPORTS GROUP I

PEACH BOTTDM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT, 3321 i

OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
2. REPORTING PERIOD:

JANUARY, 1992

3. LICENSED THERMAL POWER (MWT):

3293

4. NAMEPLATE RATING (GROSS MWE):

1152

5. DESIGN ELECTRICAL RATlWG (NET MWE):

1D65

6. MAXIMUM DE9ENDABLE CAPACITY (GROSS MWE): 1098 7.' MAXIMLM DEPENDABLE CAPACITY (NET MWE):

1035

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FDR RESTRICTIONS, IF ANY:

-THIS MONTH YR TO DATE CUMULAi!VE

11. HOURS IN REPORTING PERIOD

-744 744 149.976

12. NUMBER OF HOURS REACTOR WAS CRITICAL 717.6 717.6 91,079.7
13. REACTDR RESERVL SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 541.4 541.4 87.846.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,188,864 1,188,864 257,282,794
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 397,300 397,300 B4,399,832
18. NET ELECTRICAL ENsRGY GENERATED (MWH) 383,189 383,189 80,866,206 PAGE 1 0F 2

=

DPERATING DATA REPORT (CONTINUED)

DOCKET No. 50 278 LATE FEBRUART 15, 1992 THIS MONTH YR-10 DATE CUMUL ATIVt it. UNIT SERVICE FAC10R 72.8 72.8 58.6

20. UNIT AVAILABILITY FACTOR 72.8 72.8 58.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 49.8 49.8 52.1 22, UNIT CAPACITY TACTOR (USING DER NET) 48.4 48.4 50.6
23. UNIT FORCED OUTAGE RATE 2.3

?.3 12.6

24. SdVTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TTPE, DATE, AND DURATIDN OF EACH):
25. If SHUTDOWN AT END OF REPORT PERIOD, (SilMATED DATE OF STARTUPt N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAfl0N):

f0 RECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY D9/01/74 COMMERCIAL OPERATION 12/23/74 PACE 2 0F 2

4 4

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE FEBRUARY 15, 1992 REPORT MONTH JANUARY, 1992 CCMPLETED BY PHILADELPHI A ELECTRIC COMPANY M. J. BARON SUDERVISOR REPORTS CROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 METHOD OF

. LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TTPE DURAT'ON REASON SHUTTING DOWN EVENT CODE CODE ACTION To NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)-

PREVENT RECURRENCE 1

920101 F

0.0 A

4 N/A CF VALVEX TROUBLESH001 "B" RHR LOOP VALVES REACTOR WAS NOT SHUT DOWN 2

920126 S

0.0 9

4 W/A CD VALVEX POWER REDUCTION 50R MSIV TESTING REACTOR WAS NOT SHUT DOWN

'(1)

(2)

(3)

(4)

F - FORCED REASO4 METHOD EXHIBli ( - INSTRUCTIONS S - SCHEDULED A - E JJIP* INT FAILbRE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C RIFUELING 3. AUTOMATIC SCRAM.

EVENT REPORT (LFR)

D REGULATORY RESTRICTION.

4

  • OTHER (EXPLAIN)

FILE (NUREG-0161)

E OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H OTHER(EXPLAIN)

EXHIBIT I SAME SOURCE i

l

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. $0 278 UNIT NAME PEACH BOTTOM UNIT J DATE FEBRUART 15, 1992 REPORT MONTH J ANUArv, 1992 COMPLETED BT PHILADELPHIA [LECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMit POWER STA110N TELEPHONE (717) 456-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOUN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECVRRENCE 16 920101 S

189.7 C

-1 N/A ZZ ZZZZZZ PLANNED REFUEllNG OUTAGE 1

920108 F

6.0 A

1 N/A HA 1 ' BIN TURBINE TRIP DN HIGH V!BRATION 2

920109 F-6.9 A

1 N/A HA TURBIN TURBINE TRIP DN HIGH VlBRATION 3

920109 S

0.0 B

4 N/A HA TURBlN TURBINE OVERSPEED TESTING.

4 920117 5

0.0 H

4 N/A RB CONROD CONTROL ROD PATTERN ADJUSTMENT 5

9:0120 S

0.0 N

4 N/A RB CONROD CONTROL ROD PATTERN ADJUSTMENT 6

920124 F

0.0 H

4 U/A XX VALVEX LOAD DROP TO MINIM 12E TRANSIENT WHILE ISOLATING VALVE 7-920124 S

0.0 H

4 N/A RB CONR00 CONTROL ROD PATTERN ADJUSTMENT 202.6 (1)

(2)

(3; (4)

F

  • FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S + SCHEDULED A - EQUIPMENT FAILUeE (EXPLA!N) 1 MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTWICTION 4 OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATC1 TRAINihG + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H OTHER(EXPLAIN)

EXHIBli !

SAME SOURCE

,