ML20092F566
| ML20092F566 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/31/1991 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20092F539 | List: |
| References | |
| NUDOCS 9202190409 | |
| Download: ML20092F566 (2) | |
Text
..
I 4
ANNUAL REPORT OF REACTOR VESSEL MATERIAL SVRVEILLANCE CAPSULES AT CRYSTAL RIVER UN:T 3 IN ACCORDANCE WITH TECHNICAL SPECIFICATION 6.9.1.5(b)
REPORTING PERIOD JANUARY 1, 1991 TO DECEMBER 31, 1991 CAPSVLES CURRENTLY INSTALLED IN THE REACTOR Holder Position In Capsules 1'
Tube Holder Tube Installed ZY Top OC3 F Bottom CR3-A i
XW Top CR3-E Bottom THI2-D YX Top A2 Bottom A4 YZ Top TMI2-LG1 Bottom THI2-LG2 5
WZ Top OC3-E Bottom CK3-LG2 a
WX Top OC3-0 4
Bottom TMll-F
-i INSERTION / WITHDRAWAL
SUMMARY
There were no changes in capsule locations during_this reporting period, 1
Page 1 of 2 9202190409 920212 ADOCKOS00ggg2 DR
D OWNERSHIP 0F CAPSQlJ1
[lorida Power Corporation CR3-A CR3 E Duke Power Company OC3 C OC3-E OC3-F GPU Nuclear Corporation TMll-F TMI2-D B&W Owners Group A2 A4 CR3-LG2 THI2-LG1 TMI2-LG2 Page 2 of 2
_ _ _ _ _ _ _ _ _ - - _ _ _-_