ML20092F531
| ML20092F531 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/31/1995 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20092F522 | List: |
| References | |
| NUDOCS 9509180234 | |
| Download: ML20092F531 (10) | |
Text
._
i OPERATING CATA REPORT TCKET NO 50-369 DATE Sentesber 15. 1995 OPERATING STATUS COMPLETED By R.A. Williaes TELEPHCEE 704-382-5346
- 1. Unit Nase: k6u'.re 1
- 2. Reporting Period: August 1, 1995-Mgast 31, 1995
- 3. Licensed Thereal Power (l*,'ils 3411
- c. Naseplate Rating (Gro% PWeh 1305e i4otes *Naseplate Rating
- 5. Desi n Electi M ! kating (Net MWe b
!!80 (Gross MWel calculated as 6
- 6. Marinas Dependable Capacity (Gross MWe b 1171 1450.000 MVA
.90 power
- 7. Marious Dependable Capacity (Net NWe h 1129 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (! tees Nueber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWe h
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cueulative
!!. Hours In Reporting Period 744.0 5831.0 120527.0
- 12. Nuaber Of Hours Reactor Was Critical 744.0 5701.8 86061.2
- 13. Reactor Reserve Shutdoun Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 744.3 5629.3 85142.0
- 15. Unit Reserve Shutdown Hours
~ 0--
--0-- -
- 16. Gross Thersal Energy Generated (MWH) 1987089 19031284 266853710
- 17. Gross Electrical Energy Generated (MWH) 845165 6509581 91661304
- 18. Net Electrical Energy Generated (MWH1 812227 6257558 87564926
- 19. Unit Service Factor 100.0 96.5 70.6
- 20. Unit Availability Factor 100.0 96.5 70.6
- 21. Unit Capacity Factor (Using MDC Net!
96.7 95.1 63.3
- 22. Unit Capacity Factor (Using DER Net) 92.5 91.0 61.6
- 23. Unit Forced Outage Rate 0.0 3.5 13.8
- 20. Shutdown Scheduled Oyer Next 6 Months (Type, Date, and Duration of Eachh Refueling - December 08, 1995 - 43 days
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
- 26. Units In Test Status (Prior to Co.neercial Operationh Forecast Achieved IhlTIAL CRITICALITY 3
IN!!!AL ELECTRICITY l
CCMMERCIAL OPERATION l
a i
9509180234 950915 4
ADOCK0500g9 l
Dh
OPERATIN8 DATA REPORT DOCKET NO 50-369 UNIT PkSuire 1 Ogr. Scotesber 15. 1995 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONTH Aucust,1995 Q.A1 AVERAGE DAILY POWER LEVEL E
AVERABE DAILY F0WER LEVEL 6
(MWe-Met 1 (MWe-Net) i 1086 17 1083 2
1087 18 1080 3
1038 19 1080 4
1087 20 1082 5
1089 21 1084 6
1092 22 1097 7
1085 23 1102 8
1066 24
!!!0 9
1087 25 1111 10 1086 26 1087 27 1107 12 1089 28 1108 13 1088 29 1109 14 1087 30 1092 15 1086 31 1095 16 1082
- ~. - -. -.... -.... ~ -. - -
UNIT SHUTDOWNS RND POWER REDUCTIONS DOCKET NO.
50-369 UNIT WAME Mwy1x4 1 DATE uv/id/95 REPORT MONTH Aucust 1995 COMPLETED BY x.
a.
williams TELEPHONE
( v ue J -3 tsz-d34 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
T (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Eauipment Failure (Explain) 1-Manual for Preparation of Data B-Mdintenance or test 2-Manual Scram EntW Sheets For Licensee C-Refueling 3-Automatic Scram (LER Event Report (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Expl'ain)
G-Operator Error Exhibit I - Same Source H-Other
l e
DOCKET: 50 369 UNIT: McGuire i Date:
09/15/95 NARRATIVE
SUMMARY
MONTil: August 1995 McGuire Unit I began the month of August operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone:(704)- 382-5346
1 1
4 MONTIILY REFUELING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 1 1
\\
2.
Scheduled next refueling shutdown: December 1995 3.
Scheduled restart following refueling: January 1996 Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TIIROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee j
regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 611 8.
Present licensed fuel pool capacity: M61 Size of requested or planned increase: ::
9.
Projected date oflast refueling which can be accommodated by present license capacity: March l
go e s I
DUKE POWER COMPANY DATE: Sectember 15.1995 Name of
Contact:
R. A. Williams Phone: (704). 382-5346
i a
CPERAi!NG DATA REPORT DOCKET NO 50-370 DATE Sentenber 15. IL91 OPERATIN6 STATUS COMPLETED BY R.A.Willians TELEPHONE 704-382-5346
- 1. Unit Nase: Mc6utre 2
- 2. Reporting Period: August 1, 1995-August 31,1995
- 3. Licensed Thersal Power (Nt):
3411
- 4. Naseplate Rating (Gross Ne):
1305*
Notes *Naseplate Rating
- 5. Design Electrical Rating (Net NWel
!!80 (Gross MWe) calculated as
- 6. flasisus Dependable Capacity (Stoss Ne):
!!71 1450.000 MVA
.90 power
- 7. Maxinus Dependable Capacity (Net Me): _
1129 factor per Page iii,
- 8. If Cnanges Occur in Capacity Ratings (! tees Nueber 3 through 7) Since Last NURE6-0020.
Report. Give Reasons
- 9. Power Level ic Which Restricted, if Any (Net Me):
- 10. Reason For Restrictions, If anyt This Month Yr.-to-Date Cueulative
- 11. Hours la Reporting Period 744.0 5831.0 100823.0
- 12. Number Of Hours Reactor Was Critical 744.0 5455.9 79008.7
- 13. Reactor Reserve Shutdown Hours -
--0--
--0--
- 10. Hours Generator Un-Line 744.0 5405.2 77989.8
- 15. Unit Reserve Shutdown Hours
- -- 0 --
- 16.GrossTheraalEnergyGenerated(MWH) 2516579 18187100 256032522
- 17. Gross Electrical Energy Generated (HH) 850651 6280693 89328291
- 18. Net Electrical Energy Benerated (MWH) 816301 6039104 85661450
- 19. Unit Service Factor 100.0 92.7 77.3
- 20. Unit Availability Factor 100.0 92.7 77.3
- 21. Unit Capacity Factor (Using MDC Net) 97.4 91.7 74.5
- 22. Unit Capacity Factor (using DER Net!
93.2 87.8 72.0
- 23. Unit Forced Outage Rate 0.0 2.9 6.4
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l None i
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units in Test Status (Prior to Coasercial Operation):
Forecast Achieved
[
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAi!0N i
l
OPERATIN6 OATA REPORT DOCKET NO 50-370 tiNIT McGuire 2 DATE Sentenber :5.1995 COMPLETED BY R.A. Williae5 TELEPHONE 704-382-5346 RONTH Auaust 1995 D
AV' RAGE DAILY POWER LEVEL pf@l AVERAGE DAILY POWER LEVEL E
(MWcNet1 (MWe-Net) i
!101 17 1100 2
1103 18 1098 3
1104 19 1098 4
1102 20 1099 5
1102 21 1101 6
1068 22 1103 7
1098 23 1095 8
1098 24 1101 9
1098 25 1103 10 1098 26 1100 11 1099 27
!!00 12 1102 28 1103 13
!!02 29
!!05 14 1102 30 1106 15 1102 31 1100 16 1099
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 170.
50-370 UNIT NAME Mwy1x4 2 DATE us/id/95.
REPORT MONTH August 1995 COMPLETED BY x.
A.
williams TELEPHONE tius)-Juz-dded (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE i
O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE I
NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent U Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction 4-Other (Explain)
File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
G-Operator Error Exhibit I - Same Source H-Other
d DOCKET: 50 - 370 UNIT: McGuire 2 Date:
09/15/95 NARRATIVE
SUMMARY
MONTH: August 1995 McGuire Unit 2 began the month of August operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone: (704)- 382-5346
._.._m.
l
?
j
)
MONTilLY REFUELING INFORMATION REOUEST i
1 i
1.
Facility name:
McGuire. Unit 2 i
2.
Scheduled next refueling shutdown: March 1996 1
i 3.
Scheduled restart following refueling: May 1996 i
Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or i
other license amendment?
If yes, what will these be?
j If no, has reload design and core configuration been reviewed by Safety Review Committee j
regarding unreviewed safety questions?
i 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
4 I
6.
Important licensing considerations (new or different design or supplier, unreviewed design or i
performance analysis methods, significant changes in design or new operating procedures).
i j
7.
Number of Fuel assemblies (a) in the core: 191 1
(b) in the spent fuel pool: 191 4
i i
8.
Present licensed fuel pool capacity: L461 i
Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
December 2.0.01 DUKE POWER COMPANY DATE: Seotember 15.1995 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 L
i