ML20092F536
Jump to navigation
Jump to search
| ML20092F536 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/31/1995 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20092F522 | List: |
| References | |
| NUDOCS 9509180235 | |
| Download: ML20092F536 (1) | |
Text
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT July 1995 1
1.
Personnel Exposure -
The total station liquid release for July has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
i The total station gaseous release for July has been I
compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
1 i
1 i
1 i
f 1
l i
l 1
9s09180235 950915 l
PDR ADOCK 05000369 lI R
PDR I