Proposed Tech Specs,Changing TS Table 4.2.B & 4.2.C to Delete Requirement to Perform Daily Instrument Checks for Steam Supply Low Pressure & Turbine Exhaust Diaphragm High Pressure for Both RCIC & HPCI Sys
ML20092F331
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/13/1995
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20092F322 List:
References
NUDOCS 9509180136
Download: ML20092F331 (7)


Text

.. _

T 04 i

CER 27 0 4>

D tD Co Ou TABLE 4.2.8 (Cont'd)

A t>

$URVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS OO h

Functi on Functional' Test Calibration Instrument Check 00 o4 Instrument Channel -

(1) once/3 months none gy RMt Pump Discharge Pressure Instrument Channel -

(1) once/3 months none l

Core Spray Pump Discharge Pressure l

l Core Spray Sparger to RPV d/p (1) once/3 months once/ day t

Trtp System Bus Power Monitor once/ operating Cycle N/A none Instrument Channel -

(1) once/3 months none Condensate Header Level (LS-73-56A, 8)

Instrument Channel -

(1) once/3 months none Suppression Chamber High Level Instrument Channel -

(1)(28) once/18 months (29) once/ day l

Reactor H1 Water Level l

F (LIS-3-2

-D) l w

Instrument Channel -

(1)(28) once/18 months (29) none N*

ACIC Turbine Steam Line High Flow Instrument Channel -

once/31 days once/18 months Nouc u

RCIC Steam Supply Low Pressure Instrument Channel -

once/31 days once/18 months oc/a NOME RCIC Turbine Exhaust Diaphrage High Pressure RCIC Steam Line Space (1) once/3 months none Torus Area

~

High Temperature g

RCIC Steam Line Space (1) once/3 months none RCIC Pump Room Area C-.

High Temperature C

E F

m HPCI Steam Line Space (1) once/3 months none P

A Torus Area High Temperature a

HPCI Steam Line Space (1) once/3 months none g

HPCI Pump Room Area High Temperature 03

TABLE 4.2.5 (Cont'd)

$URVEILLANCE REQUIRDENTS FCR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS

@ "5 Function Functional Test Calibration Instrument Check n"

Instrument Channel -

(1)(28) once/18 months (29) none l

u HPCI Turbine Steam Line High Flow h/h nonJE Instrument Channel -

once/31 days once/18 months HPCI Steam $upply low Pressure Instrument Channel -

once/31 days once/18 months McME HPCI Turbine Enhaust Diaphralpn High Pressure Core Spray System Logic once/18 months (6)

N/A RCIC System (Initiating) Logic once/18 months N/A N/A RCIC System (Isolation) Logic once/18 months (6)

N/A HPCI System (Initiating) Logic once/18 months (6)

N/A HPCI System (Isolation) Logic once/18 months' (6)

N/A

[

ADS Logic once/18 months (6)

N/A 8

LPCI (Initiating) Logic once/18 months (6)

N/A LPCI (Containment $ pray) Logic once/18 months (6)

N/A m

Cr b

a he 43 CD O

s 0

TABLE 4.2.C SURVEILt.ANCE REQUIREMENT $ FOR INSTRtMENTATION THAT INITIATE R00 BLOCKS y t' Furction Functional Test Calibration (17)

Instrument Check r2 APRM Upscale (Flow Blas)

(1)

(13) once/3 months once/ day (8)

APRM Upscale (Startup Mode)

(1)

(13) once/3 months once/ day (8) as APRM Downstale (1)

(13) once/3 months once/ day (8)

APRM Inoperative (1)

(13)

N/A once/ day (8)

RBM Upscale (Flow Blas)

(1)

(13) once/6 months once/ day (8)

RBM Downscale (1)

(13) once/6 months once/ day (8)

RBM Inoperative (1)

(13)

N/A once/ day (8)

IRM Upscale (1)(2)

(13) once/3 months once/ day (8)

IRM Downscale (1)(2)

(13) once/3 months once/ day (8)

IRM Detector Not in Startup Position (2) (once operating cycle) once/ operating cycle (12)

N/A N/A Z

IRM Inoperative (1)(2)

(13)

N/A g

once/3 months once/ day (8) h (13) s~

SRM Upscale (1)(2)

SRM Downscale (1)(2)

(13) once/3 months once/ day (8)

SRM Detector Not in Startup Position (2) (once/ operating cycle) once/ operating cycle (12)

N/A SRM Inoperative (1)(2)

(13)

M/A N/A Flow Blas Comparator (1)(15) once/ operating cycle (20)

N/A Flow Blas Upscale (1)(15) once/3 months N/A

>=

(16)

N/A N/A iC Rod Block Logic N

West Scram Discharge once/ quarter once/ operating cycle N/A 3>

I E

Tank Water Level High

]

h (LS-85-45L) once/ quarter once/ operating cycle N/A Co i

East Scram Discharge o

Tank Water Level High N

(LS-85-45M) m.

I

l ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE TS-368 REVISED PAGES I.

AFFECTED PAGE LIST Unit 3 3.2/4.2-45 3.2/4.2-46 3.2/4.2-49 II.

REVISED PAGES See attached.

m TABLE 4.2.B (Cont'd) em SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS

3 rs 7*

Function Functional Test Cali brati on Instrument Check Instrument Channel -

(1) once/3 months none RHR Pump Discharge Pressure Instrument Channel -

(1) once/3 months none Core Spray Pump Discharge Pressure Core Spray Sparger to RPV d/p (1) once/3 months once/ day Trip System Bus Power Monitor once/ operating Cycle N/A none Instrument Channel -

(1) once/3 months none Condensate Header Level (LS-73-56A B)

Instrument Channel -

(1) once/3 months none Suppression Chamber High Level l

Instrument Channel -

(1)(28) once/18 months (29) once/ day L

Reactor High Water Level (LIS-3-208A-D) to t

)

Instrument Channel -

(1)(28) once/18 months (29)'

none RCIC Turbine Steam Line High Flow l

Instrument Channel -

once/31 days once/18 months none RCIC Steam Supply Low Pressure l

Instrument Channel -

once/31 days once/18 months none RCIC Turbine Exhaust Diaphragn High Pressure RCIC Steam Line Space (1) once/3 months none Torus Area High Temperature RCIC Steam Line Space (1) once/3 months none l

RCIC Pump Room Area l

High Temperature HPCI Steam Line Space (1) once/3 months none Torus Area High Temperature HPCI Steam Line Space (1) once/3 months none HPCI Pump Room Area High Temperature i

._m

.-.m..-_._._

__._.._____m

...i.

L i

TABLE 4.2.B (Cont'd)

SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS Function Functional Test Calibrati on Instrueent Check.

ew p m I

p*

Instrument Channel -

(1)(28) once/18 months (29) none HPCI Turbine Steam Line High Flow 1

w l

Instrument Channel -

once/31 days once/18 months none t

HPCI Steam Supply Low Pressure

.l Instrument Channel -

once/31 days once/18 months none HPCI Turbine Exhaust Diaphragn High Pressure i

l Core Spray System Logic once/18 months (6)

N/A RCIC System (Initiating) Logic once/18 months N/A N/A l

RCIC System (Isolation) Logic once/18 months (6)

N/A i

HPCI System (Initiating) Logic once/18 months (6)

N/A f

I HPCI System (Isolation) Logic once/18 months (6)

N/A l

w k

ADS Logic.

once/18 months (6)

N/A n

LPCI (Initiating) Logic once/18 months (6)

N/A w

7 s

LPCI (Containment Spray) Logic once/18 months (6)

N/A i

r l

I i

i i

t i

TABLE 4.2.C SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE ROD BLOCKS

/

yW Function Functional Test Calibration (17)

Instrument Ct.eck eE APRM Upscale (Flow Bias)

(1)

(13) once/3 months once/ day (8)

APRM Upscale (Startup Mode).

(1)

(13) once/3 months once/ day (8)

APRM Downscale (1)

(13) once/3 months once/ day (8)

APRM Inoperative (1)

(13)

N/A once/ day (8)

RBM Upscale (Flow Bias)

(1)

(13) once/6 months once/ day (8)

RBM Downscale (1)

(13) once/6 months once/ day (8)

RBM Inoperative (1)

(13)

N/A once/ day (8)

IRM Upscale (1)(2)

(13) once/3 months once/ day (8)

IRM Downscale (1)(2)

(13) once/3 months once/ day (8)

IRM Detector Not in Startup Position (2) (once operating cycle) once/ operating cycle (12)

N/A F

IRM Inoperative (1)(2)

(13)

N/A N/A ro2 SRM Upscale (1)(2)

(13) once/3 months once/ day (8) l SRM Downscale (1)(2)

(13) once/3 months once/ day (8)

SRM Detector Not in Startup Position (2) (once/ operating cycle) once/ operating cycle (12)

N/A SRM Inoperative (1)(2)

(13)

N/A N/A Flow Blas Comparator (1)(15) once/ operating cycle (20)

N/A Flow Bias Upscale (1)(15) once/3 months N/A Rod Block Logic (16)

N/A N/A West Scram Discharge onc2/ quarter once/ operating cycle N/A Tank Water Level High (LS-85-45L)

East Scram Discharge once/ quarter once/ operating cycle N/A Tank Water Level High (LS-8S-45M)

~

- -