ML20092F331
| ML20092F331 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/13/1995 |
| From: | TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20092F322 | List: |
| References | |
| NUDOCS 9509180136 | |
| Download: ML20092F331 (7) | |
Text
.. _
T 04 i
CER 27 0 4>
D tD Co Ou TABLE 4.2.8 (Cont'd)
A t>
$URVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS OO h
Functi on Functional' Test Calibration Instrument Check 00 o4 Instrument Channel -
(1) once/3 months none gy RMt Pump Discharge Pressure Instrument Channel -
(1) once/3 months none l
Core Spray Pump Discharge Pressure l
l Core Spray Sparger to RPV d/p (1) once/3 months once/ day t
Trtp System Bus Power Monitor once/ operating Cycle N/A none Instrument Channel -
(1) once/3 months none Condensate Header Level (LS-73-56A, 8)
Instrument Channel -
(1) once/3 months none Suppression Chamber High Level Instrument Channel -
(1)(28) once/18 months (29) once/ day l
Reactor H1 Water Level l
F (LIS-3-2
-D) l w
Instrument Channel -
(1)(28) once/18 months (29) none N*
ACIC Turbine Steam Line High Flow Instrument Channel -
once/31 days once/18 months Nouc u
RCIC Steam Supply Low Pressure Instrument Channel -
once/31 days once/18 months oc/a NOME RCIC Turbine Exhaust Diaphrage High Pressure RCIC Steam Line Space (1) once/3 months none Torus Area
~
High Temperature g
RCIC Steam Line Space (1) once/3 months none RCIC Pump Room Area C-.
High Temperature C
E F
m HPCI Steam Line Space (1) once/3 months none P
A Torus Area High Temperature a
HPCI Steam Line Space (1) once/3 months none g
HPCI Pump Room Area High Temperature 03
TABLE 4.2.5 (Cont'd)
$URVEILLANCE REQUIRDENTS FCR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS
@ "5 Function Functional Test Calibration Instrument Check n"
Instrument Channel -
(1)(28) once/18 months (29) none l
u HPCI Turbine Steam Line High Flow h/h nonJE Instrument Channel -
once/31 days once/18 months HPCI Steam $upply low Pressure Instrument Channel -
once/31 days once/18 months McME HPCI Turbine Enhaust Diaphralpn High Pressure Core Spray System Logic once/18 months (6)
N/A RCIC System (Initiating) Logic once/18 months N/A N/A RCIC System (Isolation) Logic once/18 months (6)
N/A HPCI System (Initiating) Logic once/18 months (6)
N/A HPCI System (Isolation) Logic once/18 months' (6)
N/A
[
ADS Logic once/18 months (6)
N/A 8
LPCI (Initiating) Logic once/18 months (6)
N/A LPCI (Containment $ pray) Logic once/18 months (6)
N/A m
Cr b
a he 43 CD O
s 0
TABLE 4.2.C SURVEILt.ANCE REQUIREMENT $ FOR INSTRtMENTATION THAT INITIATE R00 BLOCKS y t' Furction Functional Test Calibration (17)
Instrument Check r2 APRM Upscale (Flow Blas)
(1)
(13) once/3 months once/ day (8)
APRM Upscale (Startup Mode)
(1)
(13) once/3 months once/ day (8) as APRM Downstale (1)
(13) once/3 months once/ day (8)
APRM Inoperative (1)
(13)
N/A once/ day (8)
RBM Upscale (Flow Blas)
(1)
(13) once/6 months once/ day (8)
RBM Downscale (1)
(13) once/6 months once/ day (8)
RBM Inoperative (1)
(13)
N/A once/ day (8)
IRM Upscale (1)(2)
(13) once/3 months once/ day (8)
IRM Downscale (1)(2)
(13) once/3 months once/ day (8)
IRM Detector Not in Startup Position (2) (once operating cycle) once/ operating cycle (12)
N/A N/A Z
IRM Inoperative (1)(2)
(13)
N/A g
once/3 months once/ day (8) h (13) s~
SRM Upscale (1)(2)
SRM Downscale (1)(2)
(13) once/3 months once/ day (8)
SRM Detector Not in Startup Position (2) (once/ operating cycle) once/ operating cycle (12)
N/A SRM Inoperative (1)(2)
(13)
M/A N/A Flow Blas Comparator (1)(15) once/ operating cycle (20)
N/A Flow Blas Upscale (1)(15) once/3 months N/A
>=
(16)
N/A N/A iC Rod Block Logic N
West Scram Discharge once/ quarter once/ operating cycle N/A 3>
I E
Tank Water Level High
]
h (LS-85-45L) once/ quarter once/ operating cycle N/A Co i
East Scram Discharge o
Tank Water Level High N
(LS-85-45M) m.
I
l ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE TS-368 REVISED PAGES I.
AFFECTED PAGE LIST Unit 3 3.2/4.2-45 3.2/4.2-46 3.2/4.2-49 II.
REVISED PAGES See attached.
m TABLE 4.2.B (Cont'd) em SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS
- 3 rs 7*
Function Functional Test Cali brati on Instrument Check Instrument Channel -
(1) once/3 months none RHR Pump Discharge Pressure Instrument Channel -
(1) once/3 months none Core Spray Pump Discharge Pressure Core Spray Sparger to RPV d/p (1) once/3 months once/ day Trip System Bus Power Monitor once/ operating Cycle N/A none Instrument Channel -
(1) once/3 months none Condensate Header Level (LS-73-56A B)
Instrument Channel -
(1) once/3 months none Suppression Chamber High Level l
Instrument Channel -
(1)(28) once/18 months (29) once/ day L
Reactor High Water Level (LIS-3-208A-D) to t
)
Instrument Channel -
(1)(28) once/18 months (29)'
none RCIC Turbine Steam Line High Flow l
Instrument Channel -
once/31 days once/18 months none RCIC Steam Supply Low Pressure l
Instrument Channel -
once/31 days once/18 months none RCIC Turbine Exhaust Diaphragn High Pressure RCIC Steam Line Space (1) once/3 months none Torus Area High Temperature RCIC Steam Line Space (1) once/3 months none l
RCIC Pump Room Area l
High Temperature HPCI Steam Line Space (1) once/3 months none Torus Area High Temperature HPCI Steam Line Space (1) once/3 months none HPCI Pump Room Area High Temperature i
._m
.-.m..-_._._
__._.._____m
...i.
L i
TABLE 4.2.B (Cont'd)
SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE OR CONTROL THE CSCS Function Functional Test Calibrati on Instrueent Check.
ew p m I
p*
Instrument Channel -
(1)(28) once/18 months (29) none HPCI Turbine Steam Line High Flow 1
w l
Instrument Channel -
once/31 days once/18 months none t
HPCI Steam Supply Low Pressure
.l Instrument Channel -
once/31 days once/18 months none HPCI Turbine Exhaust Diaphragn High Pressure i
l Core Spray System Logic once/18 months (6)
N/A RCIC System (Initiating) Logic once/18 months N/A N/A l
RCIC System (Isolation) Logic once/18 months (6)
N/A i
HPCI System (Initiating) Logic once/18 months (6)
N/A f
I HPCI System (Isolation) Logic once/18 months (6)
N/A l
w k
ADS Logic.
once/18 months (6)
N/A n
LPCI (Initiating) Logic once/18 months (6)
N/A w
7 s
LPCI (Containment Spray) Logic once/18 months (6)
N/A i
r l
I i
i i
t i
TABLE 4.2.C SURVEILLANCE REQUIREMENTS FOR INSTRUMENTATION THAT INITIATE ROD BLOCKS
/
yW Function Functional Test Calibration (17)
Instrument Ct.eck eE APRM Upscale (Flow Bias)
(1)
(13) once/3 months once/ day (8)
APRM Upscale (Startup Mode).
(1)
(13) once/3 months once/ day (8)
APRM Downscale (1)
(13) once/3 months once/ day (8)
APRM Inoperative (1)
(13)
N/A once/ day (8)
RBM Upscale (Flow Bias)
(1)
(13) once/6 months once/ day (8)
RBM Downscale (1)
(13) once/6 months once/ day (8)
RBM Inoperative (1)
(13)
N/A once/ day (8)
IRM Upscale (1)(2)
(13) once/3 months once/ day (8)
IRM Downscale (1)(2)
(13) once/3 months once/ day (8)
IRM Detector Not in Startup Position (2) (once operating cycle) once/ operating cycle (12)
N/A F
IRM Inoperative (1)(2)
(13)
N/A N/A ro2 SRM Upscale (1)(2)
(13) once/3 months once/ day (8) l SRM Downscale (1)(2)
(13) once/3 months once/ day (8)
SRM Detector Not in Startup Position (2) (once/ operating cycle) once/ operating cycle (12)
N/A SRM Inoperative (1)(2)
(13)
N/A N/A Flow Blas Comparator (1)(15) once/ operating cycle (20)
N/A Flow Bias Upscale (1)(15) once/3 months N/A Rod Block Logic (16)
N/A N/A West Scram Discharge onc2/ quarter once/ operating cycle N/A Tank Water Level High (LS-85-45L)
East Scram Discharge once/ quarter once/ operating cycle N/A Tank Water Level High (LS-8S-45M)
~
- -