Text
%".
4 y
^
P' Carolina Power & Light Company 3
Pl2 t} tl P. O. Box 101, New Hill, N. C. 27562 April 26,1934 Mr. James P. O'Reilly NRC-214 United States Nuclear Regulatory Commission Region II -
- 101 Marietta Street, Northwest (Suite 2900)
Atlanta, Georgia 30303
~
. CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT
= 1986 - 900,000 KW - UNIT 1 MAIN CONTROL BOARD WELD DEFICIENCIES, i
~ PURCHASE ORDER NY-435002, ITEM 103
Dear Mr. O'Reilly:
Attached is the final report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e), on March 10,1983. With this report, Carolina Power & Light Company considers this matter closed. -
L If you heve any questions regarding this matter, please do not hesitate to contact me.-
Yours very truly, f/f W i
1.
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh
- Attachment I-ec: ' Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)
Mr. R. C. DeYoung (NRC) 0 O
O 00 S
J O
<gyy1CL
'TG7-I t
L.
O_ $;sp;n gj p - w y
jll l
' ~ l,,
M s
s v
s..
- w. _
Ih
~
CAROLINA PO ER &. LIGHT COMPANY W
SUFARON HARRIS NUCLEAR POWER PLANT z
UNIT 1 m
FINAL REPORT
,a.
. MAIN CONTROL BOARD WELD DEFICIENCIES ITFM 103
-.g :. _.
-APRIL 17, 1984
,c J.-r!
REPORTABLE' UNDER 10CFR50.55(e) -
[3( * ? ? :y T
e 4
-)
s
'S 4 9 4
((1"E ?
x
(?
f.'
_d j
+
f e
m.
~
SUBJECT:
Shearon Harris Nuclear Power Plant, Unit 1, 10C FR50. 55 (e)
Reportable Deficiency in the Main Control Board (MCB) supplied under Purchase Order NY-435002, Westinghouse Shop Order 395 ITEM:
Structural Weiding
[
SUPPLIED BY:
Westinghouse Electric Corporation, Orville, Ohio s
NATURE OF DEFICIENCY:
The subject Unit 1 equipment has been received at the
- site, r
During a CP&L site QA inspection of the equipment, weld deficiencies were noted when compared to the vendor's welding criteria.
DATE PROBLEM OCCUR RED :
The problem was noted by CP&L site OA inspection on S ep tembe r 30, 1982.
DATE PPOBLEM R EPORTED:
October 14, 1982, CP&L (N. J. Chiangi) notified the NRC (Mr. C. Hehl) that this item was potentially reportable under 10CFR50.55(e).
March 10, 1983 - CP&L (N. J. Chiangi) notified the NRC (Mr. C. Hehl) that this item was reportable under 10CFR50.55(e).
1 SCOPE OF h
PROBLEM:
The deficiency involves all sections (A, P, C, D) of the MCB.
The board is fabricated in sections only due to f
physical limitations of handling and shipping. When installed, it becomes a single unit.
$1 SAFETY IMPLICATIONS:
Seismic qualification of the MCB is required to assure structural integrity during a seismic event.
Safety-
?-
reinted components are located in the board; thus, a
structural failure of the board would jeopardize operation p
of the safety-rela ted equipment.
?
J --
-m m
F
7. ?.* *.
, R EASONS DEFICIENCY IS REPORTABLE:
During initial site inspection, several welds were
~
identified,as missing or possibly needing repair.
Further inepection insing vendor weld criteria determined that six (6) welds should be added -or repaired.
CORRECTIVE
' ~ ACTION:
.The identified deficient welding has been repaired and inspected.by the vendor on site.
't
' The ~ vendor has ' performed a seismic qualification analysis using design criteria to which the MCB was built.
' FINAL REPORT: ' A final report of. the vendor's seismic analysis has just been completed and issued for review. CP&L has reviewed the analysis and found it to be satisfactory.
I l'
___m_.__
. _ _ _. _ _.______._.___._._