Final Deficiency Rept,Item 103 Re Main Control Board Weld Defects.Initially Reported on 821014.Welds Identified as Missing or Possibly Needing Repair Repaired
ML20092A577
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/26/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-214 103, NUDOCS 8406190273
Download: ML20092A577 (4)


Text

%".

4 y

^

P' Carolina Power & Light Company 3

Pl2 t} tl P. O. Box 101, New Hill, N. C. 27562 April 26,1934 Mr. James P. O'Reilly NRC-214 United States Nuclear Regulatory Commission Region II -

- 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30303

~

. CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT

= 1986 - 900,000 KW - UNIT 1 MAIN CONTROL BOARD WELD DEFICIENCIES, i

~ PURCHASE ORDER NY-435002, ITEM 103

Dear Mr. O'Reilly:

Attached is the final report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e), on March 10,1983. With this report, Carolina Power & Light Company considers this matter closed. -

L If you heve any questions regarding this matter, please do not hesitate to contact me.-

Yours very truly, f/f W i

1.

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh

- Attachment I-ec: ' Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) 0 O

O 00 S

J O

<gyy1CL

'TG7-I t

L.

O_ $;sp;n gj p - w y

jll l

' ~ l,,

M s

s v

s..

w. _

Ih

~

CAROLINA PO ER &. LIGHT COMPANY W

SUFARON HARRIS NUCLEAR POWER PLANT z

UNIT 1 m

FINAL REPORT

,a.

. MAIN CONTROL BOARD WELD DEFICIENCIES ITFM 103

-.g :. _.

-APRIL 17, 1984

,c J.-r!

REPORTABLE' UNDER 10CFR50.55(e) -

[3( * ? ? :y T

e 4

-)

s

'S 4 9 4

((1"E ?

x

(?

f.'

_d j

+

f e

m.

~

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit 1, 10C FR50. 55 (e)

Reportable Deficiency in the Main Control Board (MCB) supplied under Purchase Order NY-435002, Westinghouse Shop Order 395 ITEM:

Structural Weiding

[

SUPPLIED BY:

Westinghouse Electric Corporation, Orville, Ohio s

NATURE OF DEFICIENCY:

The subject Unit 1 equipment has been received at the

site, r

During a CP&L site QA inspection of the equipment, weld deficiencies were noted when compared to the vendor's welding criteria.

DATE PROBLEM OCCUR RED :

The problem was noted by CP&L site OA inspection on S ep tembe r 30, 1982.

DATE PPOBLEM R EPORTED:

October 14, 1982, CP&L (N. J. Chiangi) notified the NRC (Mr. C. Hehl) that this item was potentially reportable under 10CFR50.55(e).

March 10, 1983 - CP&L (N. J. Chiangi) notified the NRC (Mr. C. Hehl) that this item was reportable under 10CFR50.55(e).

1 SCOPE OF h

PROBLEM:

The deficiency involves all sections (A, P, C, D) of the MCB.

The board is fabricated in sections only due to f

physical limitations of handling and shipping. When installed, it becomes a single unit.

$1 SAFETY IMPLICATIONS:

Seismic qualification of the MCB is required to assure structural integrity during a seismic event.

Safety-

?-

reinted components are located in the board; thus, a

structural failure of the board would jeopardize operation p

of the safety-rela ted equipment.

?

J --

-m m

F

7. ?.* *.

, R EASONS DEFICIENCY IS REPORTABLE:

During initial site inspection, several welds were

~

identified,as missing or possibly needing repair.

Further inepection insing vendor weld criteria determined that six (6) welds should be added -or repaired.

CORRECTIVE

' ~ ACTION:

.The identified deficient welding has been repaired and inspected.by the vendor on site.

't

' The ~ vendor has ' performed a seismic qualification analysis using design criteria to which the MCB was built.

' FINAL REPORT: ' A final report of. the vendor's seismic analysis has just been completed and issued for review. CP&L has reviewed the analysis and found it to be satisfactory.