ML20091M484

From kanterella
Jump to navigation Jump to search
Interim Part 21 & Deficiency Rept,Item 172 Re Clogging of Containment Sumps Due to Failure of Polyurethane Coating on Flexible Conduit for Mercury Instrument Racks
ML20091M484
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/29/1984
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-84-282-000 172, MQAH-84-232, PT21-84-282, PT21-84-282-000, NUDOCS 8406110317
Download: ML20091M484 (1)


Text

,

,9 c

g.

Cp&L Carolina Power & Light Company

/

P. O. Box 165, New Hill, North Carolina 27562 May 29, 1984 FILE:

SH N-2/18 MQAH 84-232 Item 172 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region 11 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 FLAKING OF' FLEXIBLE CONDUIT COATING

Dear Mr. O'Reilly:

This is to confirm the May 25, 1984 telephone conversation between Mr. K. V. Hate' (CP&L) and Mr. A. Hardin (NRC).

Mr. Hardin was informed that the April 27, 1984 potentially reportable item, pertaining to the potential clogging of the containment stunps due to failure of the polyurethane coating on the flexible conduit for the Mercury Instrtnent Racks, has been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.

Thank you for your consideration in this matter.

Yours very truly,

=

NJC/mt

[" '

cc:

Mr. R. C. DeYoung N..J. Chiapgi - Manager Mr. G. Maxwell Qua ty Assura :e/ Quality Control Mr. R. L. Prevatte is Plant I