ML20091F005
| ML20091F005 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 10/31/1991 |
| From: | Moser S, Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20091F002 | List: |
| References | |
| NUDOCS 9111220216 | |
| Download: ML20091F005 (10) | |
Text
.- -. -. _.
. - ~.. --
-~. -. - -.
~...... ~.
s,
4 DPEEATIN3 DATA REFGRi i
DDCEET NO 50-369 DATENoveeter 15. 1991 Of_EPAilNG STATPS CCftLETEC fY R.A. Elliams TELEPHONE 704-373-5997
- 1. Unit b eer Pc6 eire 1
- 2. Reporting Period October 1, li?t Dctober 31,1991 i
- 3. Licensed Thersal Foer tWth 3411
- 4. Naseplate Rating (6tess Geh 1305*
Notes *Naseplaie Rating
- 5. Design Electrical Rating itiet Weh.
1180 (Bress W el cattulated as
- 6. Masinus 'gendale Capacity (Gress Mah 1171 1450.000 MVA x.90 power
= 7. Natisus Dependable Lapacity 1 Net Neh
,!!29 facter per Page 111,
- 8. If Changes Occur in Capacity Ratings (Items Nusber.3 Thicugh 7) Since last NURES-0020.
Deport. Give Reasons;
- 9. Funer Levelle Which Restricted, if sny tNet Wi t i
}
- 10. Reason For Restri:tions, if anyt_,
lL i
[.
This Month Vr.-to-Date Cusulative INHoursirReportingPeriod 745.0 7296.0 86928.0.
p
- 12. Nuaber Df. Hours Reactor Was Critical 0.0 5767.2.
61433.1
- 13. Reactcr Reserve Shutdcen Hoars
--0--
-.- 14, ilours Eenerator un-Line 0.0
$'i$1.7 -
60771.8 F15. Unit Reserve Shutoown~lleurs- -
--0--
--0--
- 16. 6 toss Thereal Energy Generated (NH) 9 19193799
_185419561 tL Gress Electrical Energy Generatet (M44) 0
%05156 63327591 18.; Net Electrical Energy Benerated (MWH.
-3510 6342594-6073072
'.19. Unit Service Factor 0.0 79.8 69.9
...CO. Unil Avsilabthty Factor 0.0 78.9 69.9-St.battCapacityFactortusingMDChet) 0.0 77.0
.60.7
-22. Unit Capacity factor (Using KR Net) 0.0 73.7 59.4 23.(nit'ForcedOutageRate 0.0
-9.6 12.5 M. Shutdown 5:heduled Over Next 6 Nnths (Type, Date, and Duration of Eachh.
Currently Refuelinn h
- 25. If Shul Dona At End Of Repf t Period. Estisated Date of Startup:
December 02, 1991
- 26. Units in Test Status (Prior to Coesercial Operationh Fcrecast A hieved i:
IN!!ML Chii!CALITY IN!TIALELECTRICITY COMdRCIAL DPERATION
'9111220216 f11115 oDR ADOCK 03000369 R
...m.
. _. ~ -.. _ _ - -.
.. -... ~ ~ - - _.. -. ~..
I J
CPEPATINS OATA RE90#!
'50-]69 _ __
DOCKEIN0; UNil,_, McGuire 1 LATE Never!;r_15.1991 COMPLETED BY.,1A, Williaat TELEPHD:tE 704-373-5937 MNTH -
Otteber,1991 k
AviRALE DAILY F0WER LEVEL Q!L(
AVERAGE DAILY POWER LEVEL
'(Mn-Net)
(fWe-Net) l 0-17 0
E' 0
18 -
-0
_3 0
19 0
-4 0
20 0
z
-5 0
21 L-6 0
E2 0
7:
0 23 0
.0-
-0' 24 0
i'
- - 9 i 9
25 0'
' 10 -
0 26 -
0 0
27 0-12-0 26 0
1.3_
,,0 29-0
.14 -
0 30 -
0 15' 0
131 0
16:
0 I.
w i
['
l-I-
o
.>.-am
,r..
UNIT SHUTDOWNS A!ID POWER REDUCTIONS DOCKET WO. __ 5 0 - 3 6 4 '
. UNIT.. NAME Mwoixt; 1 DATE 11/1 d/ v 1
. REPORT MONTl!
October 1991 COMPLETED BY s.
- w. Muscu.
TELEPHONE
(/043-3/3->>d2 4
(1) f2) g (4)
(5)
E-HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVO O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X.
NO.
CODE CCDE.
PREVENT RECURRENCE 5
91 1 S
745.00 C
1 RC FUELXX EOC-7 REFUELING OUTAGE t
t i
i (ll (2)
(3)
(4) r Forced' Reason
- Method:
Exhibit G - Instructions S Scheduled A-Equi ment Failure Explain) 1-Manual EntrySgaracionof, Data-for Pre
'B-Main enance or tes 2-Manual Scram
.eecs For Licensee C-Refueline' 3-Automatic Scram Event Rerort (LER (NLREG-Ol61))
D-Regulatof? Restriction 4-Other (Explain)
File E-Opbrator Training & License Examination i
F-Administrative (5g,xhibitI-SameSource
' H-Other (Explain) (Explain}
G-Operator Error
/
DOCKET N0:
50-369 UNIT: McGuire 1 DATE:
11/15/91 NARRATIVE
SUMMARY
MONTil: October 1991
- !cCuire Unit 1 began the month of October shut down for its end of-cycle
'7' refueling outage. The unit remained in the outage for the entire month, i
4 l
i Prepared by:
S. V tioser Telephone:
704 373-5762 1
1 MONTilLY REFUELING INFOBRTION REQUEST 1.-
. Facility name:_McGu_ ire 2 Unit 1 2.
Scheduled next refueling shutdown:
Currently ktfugling 3..
Scheduled restart following refueling: December 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF-ANY T.S.. CHANGE OR-LICENSE AMENDMENT. THEREFORE, QUESTIONS-4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or renumption of operation thereafter require a technical specification. change or other license amendment?
If yes, what will these be?
~
If no, has reload. design and core configuration been reviewed by Safety P9 view Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6.
Important. licensing considerations (new or difterent design or-supplier, unreviewed design or performance analysis methods,.
significant changes in desigc, or new operating procedures).
7.
Number _of fuel assemblics (a) in the core:
193 (b) in the spent fuel pool:
519 8.
'Present licensed fuel pool capacity: 1463
-Sizerof requested or planned increase:
9.-
Projected-date-of:last refueling'which can be accommodated by
-present. licensed capacity: March-2006 M
DUKE POWER COMPANi DATE:
Epvember 15. 1REl
-Name of
Contact:
R.
A.
Williams Phone:
704-273-5982 l
l m.e-.
DFERATING LATA FEFORT 03CtEl 50 50-370 EAIE Nareer 15,119,L, OFEWING 51 ATU5_
COMPLETED BY R. A _ Wit h IELEPONE 7M-373-5907 _
- 1. that Kase: McDatre 2 2.feprttogFericj: Otttter 1, !??l-Dctcber 31,1991
- 3. Liter:std Therni fber Msth W1 r----
- 4. Nueplata Rating iBrvsi Ne):
130$e Nues *Waseplate Pating
- 5. Cesign Electratal Rating tNrt Ne):
1100 (Eross PWel :alculated as
- 6. Mantats rependable Capacity (Bress NWeir 117!
1450,r>00 MVA 90 poner
- 7. hariete Dependatle Capktity Ket Miia):
1129 f atter per Fage iii, E. If Changes Dccur in Capacity Fallngs ;ltees Nusber 3 Through 7) Since Last NUEEG-0020.
Pepet. Sive steasons:
- 9. Pcwer ieel To Which Restricted, If Any thn MWeh
[
- 10. Reaton for Festrictiots, If any:
Inis Month tr.-to-Date Cutalative
- 11. Hars Ir Reporting Period 745.0 7296.0 6'224.0 i
!T'. Osba Of Hours Beactor Was Critical 653.7 7137.1 51777.2
- 13. Reacter Reserve Shuthwn Hours
-+-
- --0--
- 19. hours Eeterator On-l.ine 650.3 7128.4 50931.1
- 15. Unit Reserve Shutdown Hours
--0-- -
--0--
- 16. Srcst Theraal Energy Generated (HWH) 21 % 131 23725957 IM330742
!?s Srcit Electrical Energy Generated ;M) 745642 324%01 58174802
- 10. Net Electrical Erergy Generated WM) 717?31 7??$032 557?0??0
- 19. Unit Service Factor 87.3 97.7 75 1
- 20. Unit Avtilability factor 97.3 97.7 75.8 21, Ur.16 Capacity Facter (01ing MX Net) 84,8 96.2 72.4
- 22. Unit Cquity Fntor (Using DER Net!
81.1 92.1 70,3 23, ihit !ctr.ed Out3;e Rate 12.7 2.3 8.2
- 24. SButjean Sctedulee Dyer Nest 6 Months IType, Date, ard Duration tf f acht:
___Jtrificlint_ langary 9.
1992. 6Ljav9
- 23. If Stut !,cun A: Ebd Cf Reprt Period. Estisated Cate of 5tarth
- 26. (mits la iest Status (f rter to Coceercial DetratioM:
Farecast Achtered IN!!!AL Cf!!!CALII)
INITIAL CLECIP! CITY C0FIEPCIAL GFERATIO*.
,.,,_..._m.
... _ - ~ _ _.......... - _ -. _.. _ -.. -
1
- OPER4llh3 DATA REFORT DOCKEI ND 59.-31 UN!i McGuire i._
DATE Noveder 15, 1991
~
COMP!.ETEDEY R.A,Willipj TELEPHONE _ 704-373-5967
?lONIfi Octeter 1991 ~
QQ A7tRASE DAILY f0WER L& EL
- [4j, AVERASE DAILY POE R LEVEL iMWe Net!
(NAet)
I 1
112?
17
_lj 38
.2 1126 11 1139 3
1126 49
'1133 4
345
- i -
?0 1136
.5-
-0 21 1142 6
0-22
!!43 7'
0 23
_ !!42 8
130 24
-1065
-9' 1012-25 IQ-
'10 '
1111 26
!!39-
- 11
.1114 27 1133
.12-
't!!B -
28 1138 y -
ll36 29 '
1138 -
6-
- 14 1137 30
!!40 15 1139
- 31 1142
'16 1D9
UNIT SHUTCOWNS AND POWER REDUCTIONS COCKET NO.
50 370
~
UNIT NAME Mwu ixE z DATE 11/19/ v 1 REPORT MONTH October'1991 COMPLETE? BY d.
w.
Musta,
'"ELEPh0NE '
(/V4}-J/J-D/64 met-l (1)
R)
(2 (3)
(4)
(5)
E HOD:
i T
A OF 7,ICENSE N
Y S
f, HUT EVENT
. SYS-
_ CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3
91 4 F
94.73 A
1 SD VALVEX CONTAINMENT SPRAY SYSTEM VACUUM BREAKER CHECK VALVE LEAK RATE TESTING ~
22-P 91 8 F
A CG ZZZZZZ HOLD FOR CHEMISTRY 23-P 91-10-24 F
A HA INSTRU TURBINE COFTROL SYSTEM REPAIRS l
L (1)
(2' (3)
(41 Tr Forced
$teason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Menual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entq' Sneets For L3censee C-Refueling 3-Automatic Scram Evenc Report (LER File'(NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Exanination F-Administrative (5$
G-Operator Error (Explain) bxhibit I - Same Source H-Other (Explain)
)
E I
i
DOCKET NO:
50-370 UNIT:
McGuire 2 DATE:
11/15/91 NARRATIVE
SUMMARY
MONTil:
October 1991 McGuire Unit 2 began the month of October operating at 100% full power.
The unit operated at or near 100% full power until 0443 on 10/04, when a load reduction was commenced to cake the unit of f-line due to a petential containment leakage path through untested containment spray system valves. The unit was taken off-line at 1054 on 10/04.
At 0938 on 10/08, the unit was placed back on line.
During the subsequent power increase, the unit was held at 30t power from 1215 to 2010 on 10/08 tor chemir. cry.
The unit reached 100% full power at 1740 on 10/09, and opecated at or near 100% full power until 1030 on 10/24, when the digi';al electro 1ydraulic computer indication for turbine governor valse #4 was lost.
A load reduction was begun at 1340 on 10/24 to close this valve for repair. The anit reached 906 power at 1510 on 1024. At 1530 a "n.ini-runback" to 70% power occurred due to the governor valve closing t r.pidly causing the steam dump to actuate.
At 1745 on 10/24, a load inc: case u s begun. The unit reached 100%
fu'l power at 0800 on 10/25, and operated at 100% full power for the remainder of the month.
w Prepared by:
S. W. Moser Telephone; 704-373-5762
.. _. ~.
. ~.
.-.,~. -, -
I MONTilLJ_8MTE ING _ INFORMATION REQUEST 1.
Facility-name: McGuire, Unit 2 2.
Scheduled next refueling shutdown:
Icnuary 1992 3.
Scheduled restart'following refueling;_ Match 199'd T11E PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION
~i OF ANY T.S.
CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4._
Will refueling or recumption of operation _thereafter require a
-technical specification change or other license amendment?
If_yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committeo regarding unroviewed_ safety questions?
-5.
Scheduled date(s) for submitting-proposed licensing action and supporting information:
6.
Important licensing considerations (new or different design or supplier, unreviewed - design or performance - analysis methods, significant changes in deuign or new operating procedures),
7.
Number of fuel assemblies (a) in the core:
121 (b) in the-spent fuel pool:
665 8.
Present-licensed fuel pool capacity: J463 Size of_ requested.or planned increase:
9.
ProjectedEdate;of last_ refueling which can be accommodated by-present. licensed capacity: Egggmber 2003 i
t DUKE POWER COMPANY
.DATE:
((gvember IL_J99_1 2 _ Williang Phone:
704-373-5987 Name.of
Contact:
R. A l.
s-e 4
--
- r