l I
}
COAL 34 APR QTj 01_S" ""'","'
=
-)
P. O. Box Ifil', New ' Hill, N. C. 27562 April 4,1984
- Mr. James P. O'Reilly N RC-204 United States Nuclear Regulatory Commission Region Il 101 Marietta Street, Northwest (Suif e 2900) s Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY 4 C SHEARON HARRE NUCLEAE' POWER PLANT 1986 - 900,000 KW - UNIT l', \\
t' POSSIBLE OVERSTRESS OF PIPE SPO'OL, TrEM E3
Dear Mr. O'Reilly:
f On March 6,1984, Mr. N. J. Chiangi dotified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that the craft had rigged pipe spool,1-RH-503SA-1, for welding. An unknown person removed p
rigging lashing causing the, entire assembly to drop approximately 6-1/2 inches in 50 feet.
?
An evaluation of trils item is underway by the Harris Plant Engineering Section and Ebasco. Preliminary results, indicate the line has not been overstressed and will be sacceptable as-is, f t is~ projected taat the completed evaluation will be issued on this item by April 13, 1984. Based on the erahation results,'a report on,the reportability of this item is projected to be issued by May 4,1984.
Thank you for your corsideration in this matter.
Yours very truly, 95;?ff&
J,x/
- t t
Project General Manager R. M. Parsons
/
y
'[
'(L, (v Shearon Harris Nuclear Power Plant z
7
,' ][~
RNP/sh J
cc:
Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)
'?
- r. R. C. DeYoung (NRC)
I
^
M
.j: zy, w
3-
..g a
~
~
g
(>O
.h
)
~
'k C
-1 OFFICIAL Copy 8404130018 840404
- d N
~
PDR ADOCK 05000400
</
1
- 8 PDR' t $
L g-V
.