ML20087L223

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Seismic HVAC Ductwork by Pullman Const Industries Not Meeting Design Specs.Initially Reported on 840120.To date,63% of Suspected Ductwork Evaluated & Determined Acceptable.Next Rept by 840620
ML20087L223
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/20/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-195 NUDOCS 8403270091
Download: ML20087L223 (1)


Text

.

CP&L marma=

N'NO P. O. Box 101, New 11111, N. C. 27562 March 20,1984 Mr. James P. O'Reilly N RC-195 United States Nuclear Regulatory Commission .

Region 11 101 Marietta Street, Northwest (Suite 2000)

Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 PULLMAN CONSTRUCTION INDU9TRIES/EBASCO DfEGN INTERFACE, HVAC DUCTWORK, ITEM 158

Dear Mr. O'Reilly:

On January 20, 1984, Mr. K. V. Hate' notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(c) and 10CFR, Part 21. The NRC was informed that seismic HVAC ductwork fabricated by Pullman Construction Industries,Inc.

does not meet design specifications. Some of the fabrication occurred prior to CP&L approval of the applicable portion of Pullman's Duet Construction Manual. The ductwork was accepted by CP&L.

In our February 17, 1984 letter, we it.fccmed you that preliminary investigations of the potential generic situation between PCI and Ebasco indicate that differences impacting seismic qualification of ductwork may exist between Ebasco design documents and PCI fabrication documents. The significance of these discrepancies were being evaluated.

To date, 63% of the suspected ductwork has been evaluated and determined to be acceptable. Delays in receiving vendor information needed on the remaining ductwork has caused us to require additional time to complete our evaluation. It is currently projected that we will require until June 20, 1984 to complete our evaluation and report on the reportability of this item.

Thank you for your consideration in this matter.

Yours very truly, 8403270091 840320 A OMOO W MN R. M. Parsons Project General Manader Shearon Harris Nuclear Powet Plant RMP/sh ec: Messrs. G. Maxwell /R. Wevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC) . OFFICIAL COBT TJz 7 n0