MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
m = .-- :o 7;
, j J
f Joseph M. Farley Nuclear Plant ,
Unit 1 Narrative Summary of Operations March 1995 There were no unit shut" downs or major power reductions during the month.
There was no major safety related maintenance performed during the month.
9504180330 950413 "f PDR ADOCK 05000348 R. PDR
o i
w OPERATING DATA REPORT DOCKET NO. 50-348 DATE April 7,1995 COMPLETED BY S. M. Allison TELEPHONE (334)899-5156 ext. 3442 DEERNDNGEIAIUS
- 1. . Unit Name: Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period: March 1995 1) Cumulative data since 12-01-77,
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829 i
- 6. Maximum Dependable Capacity (Gross MWe): 855.7
- 7. Maximum Dependable Capacity (Net MWe): 812 ;
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 151,920.0
- 12. Number Of Hours Reactor Was Critical 744.0 2,069.7 121,326.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Ot.nerator On-line 744.0 2,049.9 119,503.8
- 15. Unit Resexe Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,971,634.7 5,412,791.1 307,548,508.1
- 17. Gross Electrical Energy Generated (MWH) 649,248.0 1,782,350.0 99,196,055.0
- 18. Net Electrical Energy Generated (MWH) 617,482.0 1,690,308.0 93,690,297.0
- 19. Unit Service Factor 100.0 94.9 78.7
- 20. Unit Availability Factor 100.0 94.9 78.7
- 21. Unit Capacity Factor (Using MDC Net) 102.2 96.4 75.7
- 22. Unit Capacity Factor (Using DER Net) 100.1 94.4 74.4
- 23. Unit Forced Outage Rate 0.0 5.1 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance Outage, September 15,1995. Approximately 41 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77
y ._ '.. ' .
, : 3. :
4 DOCKET NO. 50-348 UNIT 1' April 7,1995 DATE COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156-ext. 3442
' MONTH March
< DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 831 17 829 2 833 18 830 3 832 19 831 4 833 20 830
'5 830 21 827 6 826 22 826 7 825 23 822 8 831 24 830 9 835 25 829 10 835 26 829 11 834 27 825 12 832 28 831 13 829 29 832 14 829 30 832 15 829 31 833 16 829 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
e-- my
- e '
n.:' , x s ':
...y .
~
- UNIT SHUTDOWNS AND POWER REDUCTIONS -
A W
DOCKET NO. 50-348
- UNIT NAME, J. M. Farley - Unit 1 -
DATE April 7,1995 COMPLETED BY' S.M. Allison .
REPORT MONTli March TELEPIIONE (334) 899-5156, ext. 3442 -
.a.
MET 110D OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSTEM COMPONENT AC110N IO NO DATE TYPE [1) IlOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) ' CODE (5) PREVENT RECURRENCE '
There were no shutdowns Or power reductions during the month.
i .-
T 4
1
- 1: 2. 3: 4: 5:
F: Forced Reason Method Exhibit G-Instruct.ons for ExidbitI-Same Source :
S: Scheduled A - Equipment Failure (Explain) - 1 - Manual Preparations of Date Entry -
B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling - ' 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
- E - Operator Training & License Examination F- Administrative G - Operauonal Error (Explain) -
~
II-Other(Explain)
L i
r s
ew w-w w u-w wes es-y es+>9e4-a :.-,ewee.evN~.m-r as wwts aw mme.tys-aga b un g e w se -wem g-m ,w- av. ayees es-+>-w-s v.e1-WV wguipe. v an yea.t* gr _ tow +e.g.*se.a--aL e.s--e*-a** w a na we-em- *m- -. m.A --J at
I' 4 ']-
o ,
Joseph M. Farley Nuclear Plant. -
. Unit 2 - j
. Narrative Summary of Operations j March 1995 i i
1
-1 The unit was taken off-line at 0022 on March 11,1995, for the tenth
- refueling outage.
The following major saftey related maintenance was performed during the j month: l L-
.l. The reactor was defueled. Visual inspection of the fuel assemblies during the off-load identified one fuel assembly with minor grid
!~
damage. Additional fuel inspections have been conducted and a core reload redesign has been initiated.
i i
l
.I I
1 l
OPERATING DATA REPORT DOCKET NO. 50-364 DATE April 7,1995 COMPLETED BY S.M. Allison !
TELEPHONE (334) 899-5156 l ext. 3442 l
OPERATINGSTAlllS I
- 1. Unit Name: Joseph M. Farley - Unit 2 Notes j
- 2. Reporting Period: March 1995 1) Cumulative data since 07-30-81, )
- 3. Licensed Thermal Power (MWt): 2,652 date of commercial operation. 1
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe)
- 863.6
- 7. Maximum Dependable Capacity (Net MWe): 822
)
- 8. ' If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since i
.Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe): N/A I
- 10. Reasons For Restrictions, If Any: N/A l
I i
)
This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 744.0 2,160.0 119,833.0
- 12. Number Of Hours Reactor Was Critical 240.4 1,578.8 103,236.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 ;
- 14. Hours Generator On-line 240.4 1,567.2 101,789.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 555,111.3 4,025,659.8 260,365,365.5
- 17. Gross Electrical Energy Generated (MWH) 184,611.0 1,335,559.0 85,390,101.0 l
- 18. Net Electrical Energy Generated (MWH) 171,371.0 1,265,939.0 80,988,237.0 l
- 19. Unit Service Factor 32.3 72.6 84.9 l
- 20. Unit Availability Factor 32.3 72.6 84.9
- 21. Unit Capacity Factor (Using MDC Net) 28.0 71.3 82.4
- 22. Unit Capacity Factor (Using DER Net) 27.8 70.7 81.5 i
- 23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refheling/Afaintenance outage, Afarch 11,1995. Approximately 46 days.
l 1
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: April 26,1995. 1
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 i Commercial Operation 08/01/81 07/30/81
z.. .
DOCKET NO. 50-364
- UNIT 2-DATE April 7,1995 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 MONTII March
~ DAY . AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '
(MWe-Net) (MWe-Net) l' 755 17 0 2 758 18 0 F
3 _
747 19 0 4 741 20 ,
0
.5 729 21 0 6 720 22- 0 7 712 23 0 8 722 24 0 9 -724 25 0 10 677 26 0 11 0 27 0 12- 0 28 0 13 0 29 0.
14 0 30 0-15 0 31 _
0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
- - m gew.r
-y, qw UNIT SHUTDOWNS AND POWER REDUCTIONS .
DOCKET NO.- 50-364 ,
UNIT NAME - J. M. Farley - Unit 2 DATE April 7,1995 -
COMPLETED BY S. M. Allison -
REPORT MONTli March TELEPilONE (334) 899-5156, ext. 3442 -
ME1110D OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUITING EVENT SYSTEM COMPONENT ACTION TO WO. DATE TYPE (I) IIOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE '
002 950311 S 503.6 C 1 N/A N/A N/A At 0022, on 950311, the Unit was taken offline for the tenth "
refueling outage.
T l-1: 2: 3: 4: 5:
F: Forced Reason Method Exhibit G. Instructions for ' ExhibitI-Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)
D- Regulatory Restriction 4 - Other(Explain)
E - Operator Training & License Exam'mation F- Administrative G -Operational Error (Explain)
II-Other(Explain)
~'
..