f Joseph M. Farley Nuclear Plant ,

Unit 1 Narrative Summary of Operations March 1995 There were no unit shut" downs or major power reductions during the month.

There was no major safety related maintenance performed during the month.

9504180330 950413 "f PDR ADOCK 05000348 R. PDR

o i

w OPERATING DATA REPORT DOCKET NO. 50-348 DATE April 7,1995 COMPLETED BY S. M. Allison TELEPHONE (334)899-5156 ext. 3442 DEERNDNGEIAIUS

1. . Unit Name: Joseph M. Farley - Unit 1 Notes
2. Reporting Period: March 1995 1) Cumulative data since 12-01-77,
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829 i
6. Maximum Dependable Capacity (Gross MWe): 855.7
7. Maximum Dependable Capacity (Net MWe): 812  ;
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr. to Date Cumulative
11. Hours in Reporting Period 744.0 2,160.0 151,920.0
12. Number Of Hours Reactor Was Critical 744.0 2,069.7 121,326.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Ot.nerator On-line 744.0 2,049.9 119,503.8
15. Unit Resexe Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,971,634.7 5,412,791.1 307,548,508.1
17. Gross Electrical Energy Generated (MWH) 649,248.0 1,782,350.0 99,196,055.0
18. Net Electrical Energy Generated (MWH) 617,482.0 1,690,308.0 93,690,297.0
19. Unit Service Factor 100.0 94.9 78.7
20. Unit Availability Factor 100.0 94.9 78.7
21. Unit Capacity Factor (Using MDC Net) 102.2 96.4 75.7
22. Unit Capacity Factor (Using DER Net) 100.1 94.4 74.4
23. Unit Forced Outage Rate 0.0 5.1 6.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling / Maintenance Outage, September 15,1995. Approximately 41 days.

25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77

y ._ '.. ' .

, : 3. :

4 DOCKET NO. 50-348 UNIT 1' April 7,1995 DATE COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156-ext. 3442

' MONTH March

< DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 831 17 829 2 833 18 830 3 832 19 831 4 833 20 830

'5 830 21 827 6 826 22 826 7 825 23 822 8 831 24 830 9 835 25 829 10 835 26 829 11 834 27 825 12 832 28 831 13 829 29 832 14 829 30 832 15 829 31 833 16 829 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

e-- my

- e '

n.:' , x s ':

...y .

~

- UNIT SHUTDOWNS AND POWER REDUCTIONS -

A W

DOCKET NO. 50-348

  • UNIT NAME, J. M. Farley - Unit 1 -

DATE April 7,1995 COMPLETED BY' S.M. Allison .

REPORT MONTli March TELEPIIONE (334) 899-5156, ext. 3442 -

.a.

MET 110D OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUTTING EVENT SYSTEM COMPONENT AC110N IO NO DATE TYPE [1) IlOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) ' CODE (5) PREVENT RECURRENCE '

There were no shutdowns Or power reductions during the month.

i .-

T 4

1

- 1: 2. 3: 4: 5:

F: Forced Reason Method Exhibit G-Instruct.ons for ExidbitI-Same Source :

S: Scheduled A - Equipment Failure (Explain) - 1 - Manual Preparations of Date Entry -

B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling - ' 3 - Automatic Scram Report (LER) File (NUREG-0161)

D - Regulatory Restriction 4 - Other (Explain)

- E - Operator Training & License Examination F- Administrative G - Operauonal Error (Explain) -

~

II-Other(Explain)

L i

r s

ew w-w w u-w wes es-y es+>9e4-a  :.-,ewee.evN~.m-r as wwts aw mme.tys-aga b un g e w se -wem g-m ,w- av. ayees es-+>-w-s v.e1-WV wguipe. v an yea.t* gr _ tow +e.g.*se.a--aL e.s--e*-a** w a na we-em- *m- -. m.A --J at

I' 4 ']-

o ,

Joseph M. Farley Nuclear Plant. -

. Unit 2 - j

. Narrative Summary of Operations j March 1995 i i

1

-1 The unit was taken off-line at 0022 on March 11,1995, for the tenth

- refueling outage.

The following major saftey related maintenance was performed during the j month: l L-

.l. The reactor was defueled. Visual inspection of the fuel assemblies during the off-load identified one fuel assembly with minor grid

!~

damage. Additional fuel inspections have been conducted and a core reload redesign has been initiated.

i i

l

.I I

1 l

OPERATING DATA REPORT DOCKET NO. 50-364 DATE April 7,1995 COMPLETED BY S.M. Allison  !

TELEPHONE (334) 899-5156 l ext. 3442 l

OPERATINGSTAlllS I

1. Unit Name: Joseph M. Farley - Unit 2 Notes j
2. Reporting Period: March 1995 1) Cumulative data since 07-30-81, )
3. Licensed Thermal Power (MWt): 2,652 date of commercial operation. 1
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe)
863.6
7. Maximum Dependable Capacity (Net MWe): 822

)

8. ' If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since i

.Last Report, Give Reasons: N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A I
10. Reasons For Restrictions, If Any: N/A l

I i

)

This Month Yr. to Date Cumulative

11. Hours in Reporting Period 744.0 2,160.0 119,833.0
12. Number Of Hours Reactor Was Critical 240.4 1,578.8 103,236.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 ;
14. Hours Generator On-line 240.4 1,567.2 101,789.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 555,111.3 4,025,659.8 260,365,365.5
17. Gross Electrical Energy Generated (MWH) 184,611.0 1,335,559.0 85,390,101.0 l
18. Net Electrical Energy Generated (MWH) 171,371.0 1,265,939.0 80,988,237.0 l
19. Unit Service Factor 32.3 72.6 84.9 l
20. Unit Availability Factor 32.3 72.6 84.9
21. Unit Capacity Factor (Using MDC Net) 28.0 71.3 82.4
22. Unit Capacity Factor (Using DER Net) 27.8 70.7 81.5 i
23. Unit Forced Outage Rate 0.0 0.0 3.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refheling/Afaintenance outage, Afarch 11,1995. Approximately 46 days.

l 1

25. If Shut Down at End Of Report Period, Estimated Date of Startup: April 26,1995. 1
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24/81 05/25/81 i Commercial Operation 08/01/81 07/30/81

z.. .

DOCKET NO. 50-364

UNIT 2-DATE April 7,1995 COMPLETED BY S. M. Allison TELEPHONE (334) 899-5156 ext. 3442 MONTII March

~ DAY . AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

(MWe-Net) (MWe-Net) l' 755 17 0 2 758 18 0 F

3 _

747 19 0 4 741 20 ,

0

.5 729 21 0 6 720 22- 0 7 712 23 0 8 722 24 0 9 -724 25 0 10 677 26 0 11 0 27 0 12- 0 28 0 13 0 29 0.

14 0 30 0-15 0 31 _

0 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

- m gew.r

-y, qw UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO.- 50-364 ,

UNIT NAME - J. M. Farley - Unit 2 DATE April 7,1995 -

COMPLETED BY S. M. Allison -

REPORT MONTli March TELEPilONE (334) 899-5156, ext. 3442 -

ME1110D OF LICENSEE CAUSE AND CORRECTIVE DURATION SIIUITING EVENT SYSTEM COMPONENT ACTION TO WO. DATE TYPE (I) IIOURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE '

002 950311 S 503.6 C 1 N/A N/A N/A At 0022, on 950311, the Unit was taken offline for the tenth "

refueling outage.

T l-1: 2: 3: 4: 5:

F: Forced Reason Method Exhibit G. Instructions for ' ExhibitI-Same Source S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0161)

D- Regulatory Restriction 4 - Other(Explain)

E - Operator Training & License Exam'mation F- Administrative G -Operational Error (Explain)

II-Other(Explain)

~'

..