L f *.
OPERATING DATA REPORT DOCKET NO.
50-348 L
DATE March 6,1995 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 OPERATINGSTATUS
~1.
Unit Name:
Joseph M. Farley - Unit 1 Notes 2.
Reporting Period:
February 1995'
- 1) Cumulative data since 12-01-77, 3.
Licensed Thermal Power (MWt):
2.652 date ofcommercial operation.
. 4.
Nameplate Rating (Gross MWe):
860
- 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
855.7 7.
Maximum Dependable Capacity (Net MWe):
812 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A i
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 672.0 1,416.0 151,176.0
- 12. Number Of Hours Reactor Was Critical 672.0 1,325.7 120,582.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-line 672.0 1,305.9 118,759.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,772,517.2 3,441,156.4 305,576,873.4 i
- 17. Gross Electrical Energy Generated (MWH) 584,115.0 1,133,102.0 98,546,807.0
- 18. Net Electrical Energy Generated (MWH) 555,371.0 1,072,826.0 93,072,815.0
- 19. Unit Service Factor 100.0 92.2 78.6
- 20. Unit Availability Factor 100.0 92.2 78.6
- 21. Unit Capacity Factor (Using MDC Net) 101.8 93.3
'/5.6 9M i
- 22. Unit Capacity Factor (Using DER Net) 99.7 91.4 74.3
- 23. Unit Forced Outage Rate 0.0 7.8 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 08/06/77 08/09/77 Initial Electricity 08/20/77 08/18/77 Commercial Operation 12/01/77 12/01/77 950418o336 950413 ADOCK0500g8 DR
w, o
OPERATING DATA REPORT DOCKET NO.
50-364
^
DATE March 6,1995 COMPLETED BY R. D. Hill TELEPHONE (334) 899-5156 iOPERATINGSTATUS 1.
Unit Name:
Joseph M. Farley - Unit 2 Notes 2.
Reporting Period:
February 1995
- 1) Cumulative data since 07-30-81, 3.
Licensed Thermal Power (MWt):
2,652 date ofcommercial operation.
4.
Nameplate Rating (Gross MWe):
860 5.
Design Electrical Rating (Net MWe):
829 6.
Maximum Dependable Capacity (Gross MWe):
863.6 7.
Maximum Dependable Capacity (Net MWe):
822 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period 672.0 1,416.0 119,089.0
- 12. Number Of Hours Reactor Was Critical 672.0 1,338.4 102,996.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Ilours Generator On-line 672.0 1,326.8 101,549.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,742,523.1 3,470,548.5 259,810.254.2
- 17. Gross Electrical Energy Generated (MWH) 579,256.0 1,150,948.0 85,205,490.0
- 18. Net Electrical Energy Generated (MWH) 551,934.0 1,094,568.0 80,816,866.0
- 19. Unit Service Factor 100.0 93.7 85.3
- 20. Unit Availability Factor 100.0 93.7 85.3
- 21. Unit Capacity Factor (Using MDC Net) 99.9 94.0 82.8 M
- 22. Unit Capacity Factor (Using DER Net) 99.1 93.2 81.9
-23. Unit Forced Outage Rate 0.0 0.0 3.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling / Maintenance outage, March 10,1995 Approximately 39 days.
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved Initial Criticality 05/06/81 05/08/81 Initial Electricity 05/24!81 05/25/81 Commercial Operation 08/01/81 07/30/81