Forwards MORs for Mar 1995 for Jm Farley Nuclear Plant Units 1 & 2 & Corrected Operating Status Sheets for Both Units, Revising Cummulative Unit Capacity Factors (Using MDC Net) from 93.3 to 75.6 for Unit 1 & from 94.0 to 82.8 for Unit 2
ML20087H071
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/13/1995
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087H074 List:
References
NUDOCS 9504180328
Download: ML20087H071 (1)


Text

@

N,7 Southem Nuclea/ Operating Company 7'. Post Office Box S295 -

7 c Birmingham. Alabama 35201 Telephone (205) 868 5131 -

g Southern Nudear Operating Company

o.. uorey Vice President

. Farley Project the Southem electnc System Docket Nos.

50-348 50-364 U. S. Nucicar Regulatory Commission ATTN: Document ControlDesk Washington, D.C. 20555 Joseph M. Farley Nuclear Plant Monthly Occrating Data Report Gentlemen:

Attached are the March 1995 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

- Also attached is the corrected February 1995 Operating Status sheet for both units. The cummutative unit capacity factors (using MDC Net) have been revised from 93.3 to 75.6 for Unit I and from 94.0 to 82.8 for Unit 2.

If you have any questions, please advise.

Respectfully submitted, h h 4f4 Dave Morey RWC:jgp(mor)

Attachments cc:

Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross 18019G 9504180328 95041'3 PDR ADOCK 05000348

/

j R

PDR g 1 I

i

.