.Cp&L Carolina Power & Ligh Lmp m,u%
P. O. Box 101, New Hill, N. C. 27562 March 2,1984 Mr. James P. O'Reilly NRC-190 United States Nuclear Regulatory Commission Region 11 101 Marietta Street, Northwest (Suite 2900)
Atlante, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SilEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 STANDBY DIESEL GENERATOR, ITEM 159
Dear Mr. O'Reilly:
On February 6,1984, Mr. N. J. Chiangi notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e) and 10CFR, Part 21. The NRC was informed that the flexible coupling drive hubs on the drive shaft in the overspeed governor and fuel transfer pump drive of the Standby Diesel Generator may have a potcntial problem depending upon whether the hubs are found to be loose upon inspection. The inspection procedure from Transamerica Delaval had not been received at that time.
The inspection procedure was received from Transamerica Delaval on February 24,1984.
A field change request has been issued to direct the field to perform the inspection. It is projected that the inspection will be completed by March 30,1984 and ive will reqitire until April 16,1984 to submit a report on the reportability of this item.
Thank you for your consideration in this matter.
Yours very truly,
- f W R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh ec:
Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)
Mr. R. C. DeYoung (NRC)
UFF101A606Py }
8403130237 840302 PDR ADOCK 05000400 NZ ~7 I/O