ML20086S960

From kanterella
Jump to navigation Jump to search
Corrected Tech Spec Pages 3/4 3-42 & 3/4 6-2 to Amend 59 to License DPR-71 & Amends 65 & 91 to Licenses DPR-71 & DPR-62, Respectively
ML20086S960
Person / Time
Site: Brunswick  
Issue date: 02/10/1984
From:
NRC
To:
Shared Package
ML20086S962 List:
References
NUDOCS 8403060056
Download: ML20086S960 (3)


Text

_ _ _. - -

3 TABLE 3.3.4-1

n h

CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION SETPOINTS s

TRIP FUNCTION AND INSTRUMENT NUMBER TRIP SETPOINT ALLOWABLE VALUE h

1.

APRM (C51-APRff-Cll. A,B,C,0,E,F) a a.

Upscale (Flow Biased)

< (0.66W + 42%)

T*

< (0.66W + 42%)

T*

H HTPF MTPF b.

Inoperative NA NA c.

Downscale

> 3/125 of full scale

> 3/125 of full scale d.

Upscale (Fixed) i < 12% of RATED TilERMAL POWER

< 12% of RATED TilERffAL POWER 2.

ROD BLOCK !!ONITOR (CSI-RBM-Cl!. A,B)

~

a.

Upscale

-< (0.66W + 41%)

T*

< (0.66W + 41%)

T*

HTPF MTPF b.

Inoperative NA NA c.

Downscale

> 3/125 of full scale

> 3/125 of full scale h

3.

SOURCE RANGE MONITORS (C51-SRt!-K600A,B,C,D) a.

Detector not full in NA NA

[

5

__ 1 x 10 cps

< 1 x 105 cps b.

Upscale N

c.

Inoperative NA NA d.

Downscale

> 3 cps

> 3 cps 4.

INTERt!EDIATE RANGE MO,iTORS (C51-IRM-K601A,B,C,D,E,F,G,II) a.

Detector not full in NA NA b.

Upscale

< 108/125 of full scale

< 108/125 of full scale c.

Inoperative NA NA g

d.

Downscale

> 3/125 of full scale

> 3/125 of full scale g-5.

SCRDI DISCIIARGE VOLUME (Cl1-LSil-N013E) g a.

Water Level - liigh

< 73 gallons

< 73 gallons n

5

  • T=2.43 for 8x8 fuel u

T=2.39 for 8x8R fuel T=2.39 for P8x8R fuel 8403060056 840210 PDR ADOCK 05000324 P

pm i

e CONTAINMENY SYSTEMS PRIMARY CONTAI?NENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Primary containment leakage rates shall be limited to:

a.

An overall integrated leakage rate of:

1.

Less than or equal to L,, 0.5 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at P,,

49 psig, or 2.

Less than or equal to L, 0.357 percent by weight of the containmentairper24koursatareduct' pressure of P,

25 psig.

b.

A combined leakage rate of less than or equal to 0.60 L f r all a

penetrations and all valves listed in Table 3.6.3-1, except for main steam lihe isolation valves *, subject to Type B and C tests when pressurized to P,,

49 psig.

isolation valve when tested at 25 psig.

APPLICABILITY: When PRUiARY CONTAIR1ENT INTEGRITY is required per Specification 3.6.1.1.

ACTION:

With:

a.

The measured overall integrated primary containment leakage rate exceeding 0.75 L, or 0.75 L, as applicable, or t

b.

The measured combined leakage rate for all penetrations and all valves listed in Table 3.6.3-1, except for main steam line isolation valves *, subject to Type B and C tests exceeding 0.60 L,

r a

The measured leakage rate exceeding 11.5 scf per hour for any one c.

main steam line isolation valve, restore: The overall integrated leakage rate (s) to less than or equal to a.

0.75 L, or 0.75 L, as applicable, and t

b.

The combined leakage rate for all penetrations and all valves listed in Table 3.6.3-1, except for main steam line isolation valves *,

subject to Type B and C tests to less than or equal to 0.60 L,, and

BRUNSWICK - UNIT 1 3/46-2 Amendment No. 65

CONTAINMENT SYSTEMS PRIliARY CONTAIN'!ENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Primary containment leakage rates shall be limited to:

a.

An overall integrated leakage rate of:

Less than or equal to L 0.5 percent by weight of the 1.

containment air per 24 $o,urs at P,,

49 psig, or 2.

Less than or equal to L 0.357 percent by weight of the t

containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at a reduced pressure of P,g 25 psig.

b.

A combined leakage rate of less than or equal to 0.60 L for all penetrations and all valves listed in Table 3.6.3-1, ex, cept for main steam line isolation valves *, subject to Type B and C tests when pressurized to P,,

49 psig.

c.

  • Less than or equal to 11.5 sef per hour f or any one main steam line isolation valv when tested at 25 psig.

APPLICABILITY: When PRIMARY CONTAI?tiENT INTEGRITY is required per Specification 3.6.1.1.

ACTION:

With:

a.

The measured overall integrated primary containment leakage rate exceeding 0.75 L, or 0.75 L, as applicable, or g

b.

The measured combined leakage tate f or all penetrations and all valves listed in Table 3.6.3-1, except for main steam line isolation valves *, subject to Type B and C tests exceeding 0.60 L,,

or c.

The measured leakage rate exceeding 11.5 scf per hour for any one main steam line isolation valve, restore:

a.

The overall integrated leakage rate (s) to less than or equal to 0.75 L, or 0.75 L, as applicable, and g

l b.

The combined leakage rate for all penetrations and all valves listed in Table 3.6.3-1, except for main steam line isolation valves *,

subject to Type B and C tests to less than or equal to 0.60 L,, and

BRUNSWICK - UNIT 2 3/46-2 Amendment No. 91 l

l