Deleted Tech Spec 3.0.4 Re Availability of Recirculation Pump Trip Instrumentation
ML20086P807
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/17/1991
From:
ILLINOIS POWER CO.
To:
Shared Package
ML20086P806 List:
References
NUDOCS 9112270202
Download: ML20086P807 (3)


Text

_ _ - . _ _ _ . . . _ _ . ._ __ .

. - Attachment to U-601903

. Page 1 of 3 U-601766 LS-89-021 Page 9 of 14 INSTRUMENTATION 3/4.3.4 _ RECIRCULATION PUMP _T_ RIP ACTU_Ay,0N INSTRUMEfATION ATWS REC 1RCULATION*FUMP TRIP SYSTEM INSTRUMENTATION limit 1NG CONDITION FOR OPERATTON -

3.3.4.1 The anticipated transient without scram recirculation pump trip (ATVS-RPT) system d nstrumentation channelt shown in Table 3.3.4.1-1 shall be OPERABLE with their trip setpoints set coisistent with the values shown in the Trip Setpoint column of Table 3.3.4.1-2.

APPLICAP1LITY: OPERATIONAL CONDIT10H 1.

ACTION:

- a. With an ATVS-RPT system instrumentation channel trip setpoint less conserva-tive than the value shown in the Allowable Value column of Table 3.3.4.1-2, declare the channel inoperable until the channel is restored to OPERABLE statuswiththechanneltripsetpointadjustedconsistentwiththeTrip betpoint value.

-tn--Whh-theevir ef-OPERABL chemeh-ene4en-than swir&by-the-H4*4-----

-.eum-OptRABLE Ch:~n:1c pee -T+4p-4ystem-+equicement, for =: tHp=f=:t!= !" - .

u tMw.-

-.one-tr.4p-sy+t=darettere Ac =: e- be the 'noperab'e at-4 east-ST""" dinne!-

hin-ti next te OPEPMLE M.ovm-- etitue 1*NSERT SURVEILLANCE REOUlkEMENTS

_i _ - -

-~/

4.3.4.1.1 Each ATVS-RPT system instrumentation channel shall be demonstra u.

OPERABLE by the performance of the CHANNEL CHECX, CHANNEL FUNCTIONAL TES) Md CHANNEL CALIBRATION o;e. rations et the frequencies showit'in Table 4.J.4.1-1.

4.3.4.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.

CL1HTON - UNIT 1 3/4 3-48

-9112270202 91121"/ .

PDR ADOCK 05000M1 1

--P PDR .

l

, . Attachment to U-601903 l Pago 2 of 3 i

. . l U,601766 LS.89 021 Page 10 of 11 Inic;.t_for_nace 3/4 hh.1

b. With the number of OPEPASLE channeln less than required by the Minimurn OPERABLE Channels per Trip Syste:m requirement for one trip system, place the inoperable channol(s) in the tripped condition withirt72 hours orWQst STARTUP_vithin the

," gh"' $b bNb

c. With the number of OPERABLE channels one less than required by the Minimum OPERABLE Channels per Trip System roquirement for both trip systems, place at least one inoperable channel in the tripped condition withfn one hour, and place the second inoperable channel in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 1 ime, be in at lennt SIARTU_P _vithJn_the_next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. -The-

.aci; ins; _;F4,f: rfi:eHR iTE.Cg nE: Zjpii c,B

~

-- A

d. With bota trip systems otherwise Inoperable, restore at least one trip system to OPEPABLE status within one hour or be in at least STARTUP within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, i

f:

. , - - - - , -v.-,., ,--%-, , - --

-nw----m --,-+w- -,w- - - - < , -

v--

TABLE 3.3.4.1-1 O ATV5 F.ECTRCt'lATIC!! FUMP TRIP SYSTEH I!ISTRLVENTATIOrt ,

5 o

HINI!M1OPERABLECif['fjELS 7 - ;Ip rg;;0TIO!! PER TRIP SYSTEH c

x '

2 U 1. Peacter Vessel Water level - {

Low Lov, tevel 2 Reactor Vessel Pressure - !!!gh 2

2. .

-___1 P US$ ka e far_rtm f d (a) On .-T may be placed in an tecperable status fer up top;e_Mefsg-tut-ncO previded the redundant trip system is CPERABLQ ~ - -

g _.qw '

i Y

3 1

l n

2a8 i ~~

~ ,9 %

C w n

~sR e=

n

- w-=

wS~

_ . _ _ _ _