ML20086P038

From kanterella
Jump to navigation Jump to search

Task Interface Agreement Re RCS Piping Replacement.Action Plan Listed
ML20086P038
Person / Time
Site: 05000000, Nine Mile Point
Issue date: 08/24/1982
From: Holahan G, Jordan E, Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
Shared Package
ML20083L677 List:
References
FOIA-84-14 TAC-48124, NUDOCS 8402240241
Download: ML20086P038 (2)


Text

(.,,

[CA>

pp w L

~

.J

' TASK No. 82-50 DATE:

August 24, 1982 w

TASK INTERFACE AGREEMENT TAC #: QQ PROBLEM:

Nine_ Mils Point Unit RCS Piping Replacement

. LEAD OFFICE:

IE

$ NRR C

REGION C

JOINT NOTIFICATION:

REFERENCES:

Memo to DEisenhut from RStarostecki, undated (received 8/4/82);

Subject:

Nine Mile Point 1 Recirculation Systen Piping Replacanent

~

ACTION PLAN:

Plant Specific -

NRR:

1.

Solicit licensee submittal defining engineering and safety aspects V of recirculation piping ' replacement. (PM) 2.

Arrange a site visit to discuss: (a) licensee submittal, and (b)

V licensee's generic findings to date. (PM) j

~~-~

"3~.'~ Evaluate licensee's metallurgical pipe crack analysis. (MTEB)

/

4.

Arrange for independent analysis of RCS piping samples by test lab - Argonne. Review results, transmit to IE, and prepare SE input as necessary. (MTEB) 5.

Review and prepare SE and EIA input re:

(a) Piping design (MEB)

(b) Decontamination and Waste Disposal (CIEB) "

(c) Health Physics Program (Sheilding, ALARA, and worker doses) (RAB) '

(d) Materials and cutting / welding procedures (MTEB)

(e) Post repair test and inspection program (MTEB)

(f) Licensee's crack and analysis (MTEB)

(g) Prepare Technical Specifications and License Conditions for Designate LeaMNcYbagh% sky ([N coordinate coifespondence, NRR:

meetings, and reports (ORBf 2 -

P. Polk

).

Prepare SER report.

j OFFICE COORDINATORS:

n_vnr$

( 27207)

W

~

( 28372) mte

/

lahan ( Actina C-ORABi Ext.

1/sonL/p - A y;,j 3 27373)

Ext.

/.

APPROVED:w wu un -

Mh h., y Ext.

( 27817) l E. Jordan W

4."

a nas IE

/

. Ext.

l S ee..a s.o ustN c.o M SlO2.

gy,

.-(

)

/O'[R. Starostecki nj w

_M7 C

Ext.

c "ng AD-SA)

'(27492)

'/-

REGION 1-3402240241 840203 PDR FOIA NRR Ext.

BELL 84-14 PDR

>@c:

V. Stello, ROGR J. Sniezek,-IE S. Hanauer, NRR G. Holahan, NRR

~

[

.Regjonal Admin.

R. DeYoung, IE

-- - D. Eisenhut, NRR LEAD Project Manager

\\

/

'J. Taylor, IE C. Michelson, AEOD R. Vollmer, NRR R. Purple, NRR B'. Grimes, IE H. Denton, NRR G. Lainas, NRR

f. ge,s,s[nYn', b I

E. Jordan, IE E. Case, NRR T. Novak, NRR

~

t

/

K.

an

[

R. Baer, IE R. Mattson, NRR

{. g o{ito y RR p

NRR L

W. Mills, IE J. Kramer, NRR R. Houston, NRR If M

++

,,,--rw-w-m v

-w-r-*-

==~,-w--*'--"-+v---vww-**

vir-v=w--ev-

-===-r-w--w

-'*~e-w*-ww-

~~-**v

  • - + ' - " = " ' * * ' - * - * ' * = " * * * *

[

~

~

TASK NO. :

82-50 DATE: August 24, 1982 ACTION PLAN: (continued)

NRR 6.

Review licensee 90-day submittals regarding actual vs. estimated workerdoses.(Rg)

. Region I:

I ~.

1.

Review and monitor licensee's health physics program.

2.

Review and monitor implementation of Itcensee's QA program I-for repair.

3.

Verify approved procedures are being used.

j 4.

Monitor / inspect piping replacement and testing activities. 9 TC Generic IE:

1.

Evaluate generic aspects of Nine Mile Point RCS piping cracks. Recommend revisions to ISI program or NUREG-0313, as appropriate. (IE) (E8QA) 2.

Consider / issue generic correspondence on this event. This may_ include Bulletin, Circular, or Infonnation Notice and board notifications. (IE) (E&QA) 3.

Designate Lead Engineer to coordinate generic correspondence, meetings and reports. (W.J. Collins)

NRR:

1.

Assist IE in determining generic corrective action (ISI or NUREG-0313) that may be required. (MTEB, MEB) 9

== + ee e

-,,.,nw,.

,,.+--------y

-