Amends 129 & 111 to Licenses NPF-9 & NPF-17,respectively, Revising Tech Spec 3.8.1.1 to Increase Min Vol of Fuel Oil for EDG from Gallons to Gallons for Modes 1-4
ML20086K515
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/09/1991
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20086K517 List:
References
NUDOCS 9112130148
Download: ML20086K515 (6)


Text

..

![p asopIo, UNITE D $T ATES NUCLEAR REGULATORY COMMISSION i

.er n

n AsHiNoiDN, D. C. 20%5

{

' f s...* /

j DUKE POWER COMPANY DOCKET NO. 50-369 McGUIRE NUCLEAR STATION, UNIT 1 AltENDMEN1 TO FACit11Y OPERATING LICENSE Amendment No. 129 License flo. NPF.9 1.

The Nuclear Regulatory Comission (the Comission) has "ound that:

A.

The application for arnendment to the ItcGuire Nuclear Station, Unit 1 (the facility) Facility Optratino bytheDukePowerCompany(thelicensee)LicenseNo.NPF-9 filed dated l' arch 8, 1991, complies rith the standards and requirenients of the Atomic Energy Act of 19ft., as aniended (the Act), and the Comission's rules and regulations as set forth in 10 CFR Chapter 1; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this br.iendraent can be conducted without endangering the health and saiety of the public, and (ii) that such activities will be corducted in cotpliance with the Commission's regulations set forth in

'.0 CFR Chapter 1; D.

The issuance of this am ndnent will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 l

of the Comission's regulations and all applicable requirements have been satisfied.

I 911213O148 911D-T _

ppp

(, Doc K O'500 {

P i

-,--,y

2.

Acco"dingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPT-9 is hereby amended to rt:ad as follows:

Technical Specifications The Technical Specifications contained in Appendir. A, as revised through Amendment No.129, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendrent is effective as of its date of issuance.

F0P THE NUCLEAR REGl't.A10kY C0f 015S10ft a

David B. Hat ews, f'of Project Directorate 11-3 Division of Reactor Projects-1/11 Office of Nuclear Peactor Regulation

Attachment:

Technical Specification Changes Date of Issuance:

December 9. 1991 l

l l

l l

p esc uy[c, UNITED STATES

[

'(p NUCLE AR REGULATORY COMMISSION 3#q WASHING TON, D C. 20555 5

t e

f

....+

DltKE POWER COMPANY DOCKET NO. 50-370 McGUIRE NilCLEAR STATION, UNIT ?

AtiENDMENT TO FACIL11Y OPERATING LICENSE Amendment No. 111 License No NPF-17 1.

The Nuclear Regulatory Connission (the Connission) has found that:

The app (lication for amendment to the McGuire Nuclear Station, A.

tinit ? the facility) Facility Operatino by the Duke Power Company (the licensee) License No. t!PF-17 filed dated fiarch 8, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Conaission's rules and regulations as set f orth in 10 CFR Chaptt:r I; B.

The facility will operate in conformity with the applicaticn, the provisions of the Act, and the rules and reguletions of the Commission; C.

There is reasonabic assurance (i) that the activities authorized by this amendment con be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in conipliance with the Connission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amenoment will not he inimical to the connon defense and security or to the health and safety of the public; and E.

The issuance of this amendrent is in accordance with 10 CFR Part 51 of the Connission's regulations and all applicable requirements have been satisfied.

9,

2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachtent to this license amendrnent, and Paragraph 2.C.(P) of Facility Operating License No. NPF-17 is hereby amended to read as follows:

Technical Specifications The Technical Specificatior.s contained in App ndix A, as revised through Amendment No. 111, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuanct.

TOR THE NUCLEAR REGULATORY COMMISSION f

bs id B. Mat iews,

/

Project Directorste 11-3 Division of Reactor Projects-1/11 Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Chariges Date of Issuance: December 9, 1991

ATTACHMENT TO LICENSE AMEliDt1FNT NO.129 FACILITY OPFRATING LICENSE NO. NPF-9 i

DOCKET NO. 50-369 m

TO LICENSE AMENDHENT NO. 111 FACILITY OPERATINC LICENSE NO. NPF-17 DOCKET NO. 50 370 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contaitis vertical lines indicating the areas of change.

Remove Pace insert Pace 3/4 8-1 3/4 8-1 l

1

1 l

3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION

3. 8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

Two physically independent circuits between the offsite transmission network and the Onsite Essential Auxiliary Power System, and b.

Two separate and independent diesel generators, each with:

1)

A separate day tank containing a minimum volume of 120 gallons of fuel, 2)

A separate Fuel Storage System containing a minimum volume of 39,500 gallons of fuel, l

3)

A separate fuel transfer pump.

APPLICABILITY:

MODES 1, 2, 3, and 4, ACTION:

a.

With an offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C.

sources by performitig Surveillance Requirement 4.8.1.1.la, within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; separately demon-strate the operability of two diesel generators by performing Sur-veillance Requirements 4.8.1.1.2a.4 and 4.8.1.1.2a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless this surveillance was performed within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or unless the diesel is operating, restore at least two offsite circuits and two diesel generators to OPEPABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAP0BY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one offsite ci.cuit and one diesel generator of the above required A.C. electrical power sources inoperable *, demonstrate the OPERABILITY of the remaining A.C. source by performing Surveillance Requirement 4.8.1.1.la, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; demonstrate the operability of the remaining diesel generator by performing Surveillance Requirements 1.8.1.1.2a.4 and 4.8.1.1.2a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless this surveillance was performed within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or unless the diesel is operating **;

restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; with the diesel

    • This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABLE status.

The provisions of Specification 3.0.2 are not applicable.

McGUIRE - UNITS I and 2 3/4 8-1 Amendment No.129 (Unit 1)

Amendment No.111 (Unit 2)

-