e ec 9

GPU Nuclear Corporation One Upper Pond Road Parsippany, New Jersey 07054 201 316 7000 TELEX 136-482 Wnter's "Tect Dial Number December 9, 1991 C000-91-1571 C321-91-2316 U.S. Nuclear Regulatory Commis: ion Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

S '4ect: Oyster Creek Nuclear Generating Station (0CNGS)

Docket No. 50-219 Integrated Schedule Project List Semi-Annual Update Pursuant to condition 2.C(10) of Provisional Operating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for OCNGS. As required by Section V.A of the Plan, the following attachments are submitted to provide the semi-annual project list update:

1.

Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects.

Completed projects have been removed from the schedule listing. Also noted by a double asterisk (**) are budget activity numbering changes.

2.

Attachment B contains a summary of Category A and B projects which have been completed, deleted, deferred, changed in scope, or otherwise have had schedule changes with explanations, as appropriate, 1

I[ 12 } hi 8hhe k k

. "N DRf4 DOCK 05000219 iF 4

R PDR GPU Nuc! ear Corporahon is a sunsna"y of Genera: Pauhc Uw, tis Corporation Ift

m 9.

C000-91-1571 C321-91 2316 Page 2 Seven (7) new Category B projects have been added to the project list in Attachment A.

Six (6) Category B schedule changes and one (1) Category B deletion are discussed in Attachment B.

Pursuant to the LRPP for Oyster Creek, it will be assumed that you are in agreement with the above Category B changes if you do not respond to this submittal within 15 days of receipt.

Sincerely, sJ R. L. Long Vice President and Director Corporate Services /TMI-2 RLL/GMG/plp cc: Director, Project Directorate I-4 Region I, Administrator NRC Project Manager Senior NRC Resident. Inspector, OCNGS C3212316.LET

~ _ -.

e w

h

(

  • ATTACHMENT A PROJECT LISTING INTEGRATED SCHEDULE SEMIANNUAL UPDATE (DECEMBER 1991) l t

1.

i l

l l

OYSTER CREEK P P OJECT L i ST l NG LEGEND NRC 1 NTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'A' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASSiffCATION DESCRtPTION YEARS j

OBS BA NUMBER NRR 14R STATION BLACh00T HODiflCATIONS 1 402965 YARD TB 4160 INSTALL A POWER SUPPLY TIE BETWEEN THE COMBUSTION TURBihES AND THE OCNGS TO MEET 10 CFR 50.63 NRR 92 REPLICA SIMULATOR rERTIFICATION 2 402011 YARD EXEMPTION REQUEST BEING MADE PURSUANT TO GPUN LETTER C321-91-2322 (10 CFR 55.45).

i e

O'Y S T E'R

' CREE K P R 0 J'E C.T' L "l.-S' T I NG.

LEGEND

.'s-

=

NRC i N.T E G R t,-1 ED

.S C H E D U L E..

NEW PROJECTS.

'** BA NUMBER CHANGE CATEGORY

'B' PROJECTS' i

SORT BY CATEGORY / CYCLE /BA '

STATUS AS OF 06DEC91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 4

3 315302 SEP TOPIC 111-1 13 NRR INCORPORATE RESULTS IN AN UPDATE TO THE FSAR.

4 402808 CONVERT COMPUTER RM TO GSSI/EMER DIR OFF 13 NRR CPR PERMANENTLY. REMOVE SIGMA COMPUTER FROM COMPUTER ROOM f

5 402944 RX BLDG ROOF FRAME 14 NRR

. 119 ADD BRACING TO THE R B ROOF STRUCTURE TO ENSURE ROOF STABlLITY UNDER HIGH WIND LOADS. NRC'SEP I

i 6 40811e ACCESS CONTROL UPGRADE-CTL-RM/ RB 14 NPR CR ' CSR PROCUREMENT & INSTALLATION OF KEY CARD

[

READER UNITS W/ ALARM FOR CONTROL RDOM

[

AND CABLE SPREAD ROOM & BX BUILDG v

r_X VESSEL BELTLINE' INSPECTION 14R NRR I

7 326216 119 t

i PERFORM MEASUREMENTS TO DETERMINE WHAT-EQUIPMENT WILL BE REQUIRED AND WHAT WELDS ARE ACCESSIBLE FOR'U.T.

f 14R 14R NRR t

8 323307 RCS AUG - ICSCC INSPECTION -

DW RB75 RB95:

. INSPECT PIPING WELDS PER NUREG 0313 REV 2.

l r

9 4r'888 RPV CAPSULE #2 14R NRR-

  • 119' t

INSTALL' CAPSULE #2 IN

'R' VESSEL.

[

NUREG 0822.

i i

k I

't

\\

l OYSTER CREEK P ROJECT L I ST f NG LEGEND NRC 1 NTECRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATECORY

'B' PROJECTS STATUS AS OF 06DEC91 i

SORT BY CATEGORY / CYCLE /BA l

CYCLE /

CL ASS f f l CAT I ON OBS BA DESCRIPTION YEARS NUMBER 14R NRR 10 402894 0.C. DELETlON OF CONTAINMENT SPRAY AUTO 480V CR REPLACE C.S. MODE SWITCH W/TWO KEY-LOCKED SWITCHES, LOCAL WtRING CHANGES.

PREVENT SYSTEM AUTO-START.

14R NRR 11 402900 ISO CONDENSER PIPING MODS RB PERFORM STRESS IMPROVEMENT OF THE ISO CONDENSER NEW NG PIPING INSTALLED IN 13R.

14R NRR 12 402910 C R RECORDERS CR REMOVE AND REPLACE S DEFICIENT / OBSOLETE RECORDERS - REDUCE OPERATOR ERROR.

NUREG 0737 SUPP.1 14R NRR 13 402936 CPM /DW ISO VALVE MOD TO PRECLUDE AUTO RE CR INST ALLAT ION OF POSITION SWITCHES AND WIRING CHANGES F OR VALVES V-38-9,10,16 &

17. NUREG-0737 ITEM ti.E.4.2 14R NRR 14 402946 CONTAINMENT ISOLAT ION VALVE REPLACEMENT RB DW REPLACE BALL VALVES AND INSTALL SPECTACLE FLANGE ASSEMBL1ES.

14R REL DRYWELL CORROstON CONTR0'.

15 402950 DW RB COAT THE EXTERIOR OF THE DRYWELL, REMOVE SAND FROM THE SAND BED REGION, AND FERFORM UT INSPECTIONS.

14R NRR 16 402968 O C HARDENED VENT RB TR INSTALL 8" P I P I NG VE NT SYST E M F R OM CONTAINMENT TO THE MAIN STACK EAN DISCHARGE DUCTS. NRC GL 89-16

OYSTER CREEK PROJECT L i ST i NG LEGEND NRC I NTEGRATCD SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'B' PROJECTS STATUS AS OF 06DEC91 SORT OY CATECCRY/ CYCLE /BA CL ASS i f l CAT I ON CYCL E/

095 BA DESCRIPTION YEARS NUMBER NRR 15R RX. VESSEL BELTLINE INSPECTION 17 326216 119 UT ACCESSIBLE WELD SEAMS IN THE RPV BELTLINE REGION INSPECTIONS WILL BE DONE RMOTELY. ASME SECT. XI REQUIREMENTS NRR 15R 18 328ADA FW/CRD NOZZLE INSPECTION - 15R DW NDE 4 FW & CRD RETURN NOZZLES.(EXTERNAL UT INSPECTION). NUREG 0619 REQ'TS.

NRR 15R 19 328AFR RCS AUG - IGSCC 1NSPECTION-15R DW R875 RB95 INSPECT PIPING WELDS PER G.L. 88-01 AND NUREG 0313 REV.2 NRR 20 328030 CNTL RM HUMAN F ACTOf.S DESGN REVIEW 15R CR REP AINT, REFURBISH & REL ABEL CR PANELS 1R THRU 1CR,6XR,11XR,12R,12XR,lhR,14XR, 16R AND 11F,9xR&11R.NUREG 0737 SUP 1.

NRR 15R 21 32B280 RCS STRESS IMPROVEMENT DW RB23 PERF ORM STRESS IMPROVEMENT ON SELECTED STAINLESS STEEL PIPING WELDS IN RCS SV3, NRR 15R 22 402AGO REG GO!UE 1.97 INSTRUMENTATION CR REPLACE / INSTALL RX WATER LEVEL FUEL ZONE RECORDERS AND PPOVIDE POWER SUPPLIES AND NEW POWER DISTR. EYSTEM PER RG 1.97 NRR 15R DW CORR"SION 23 402LO7 OW PERFORM INSPECTIONS TO DETEkMINE EFFECTIVENESS OF M TIGATING ACTIONS

O Y S T E R ' S C R E E K' PROJECT. L 1.S T I NG LEGEND N R.C I NTEGRATED ' SCHEDULE NEW PROJECTS.

    • BA NUMSER CHANGE CATEGORY

'B' PROJECTS' SORT BY CATEGORY / CYCLE /BA STATUS AS OF'06DEC91 CYCLE /

OLAS$1FICATION OBS BA DESCRIPTION YEARS NUMBER 24 402808 CONVERT COMPUTER RM TO GSSl/EMER DIR OFF 15R NRR CPR CONVERT COMPUTER ROOM INTO GSS OFFICE.

REQUIRES SECURITY PROOFING 25 402910 C R RECORDERS 15R NRR CR REMOVE AND REPLACE 10 DEFICIENT / OBSOLETE RECORDERS - REDUCE OPERATOR ERROR.

NUREG 0737 SUPP. 1 26 402974 **

OC RX OVERFILL PROTECTION SYSiEM.

15R NRR CR MODIFICATIONS TO FW RECULATING VALVES AND FW PUMP B TRIP CIRCulTRY.

NRC CEN. LETTER 89-19 RCS AUG-IGSCC INSPECTION-16R 16R NRR 27 32BLO6 RB DW INSPECT PIPING WELDS PER NUREG 0313 REV2 28 402959 O. C. PROBABILISTIC RISK ASSESSMENT-lPE 87-92 NRR PERFORM A PRA AND PROVIDE RESPONSE TO NRC G.L. 88-20, INDIVIDUAL PLANT EXAM INATION BY 9-1-92.

29 328205 SQUG SUPPORT & P ARTICIPATIOP - BWROG 87-93 NRR PARTICIPATION IN SEISMIC QUc.LIFICATION UTILITY GROUP FOR EQUIP GEISMIC QUA-LIFICATION. UNRESOLVED SAFE FY ISSUE.

30 402011 OC REPLICA SIMULATOR 87-93 NRR DESIGN, FABRICATE, INSTALL A SIMULATOR DUPLICATING THE OC CON'ROL RM FUNCTIONS (GPUN LETTER C321-91-2293).

l i

OYSTER CREEK PROJECT L i ST I NG LEGEND NRC 1 N TEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'B' PROJECTS STATUS AS Of 06DEC91 SORT BY CATECORY/ CYCLE /8A CYCLE /

CLASSiflCATION OBS BA DESCRIPTION YEARS NUMBER NRR 87-95 31 328226 SCUG PROGRAM IMPLEMENTATION ESTABLISH SEISMIC QUAllflCATION FOR OYSTER CREEK.SCOTE I NCL tDES WALKDOWM IN OUTAGE 15R AND EVALUAT IONS t 90-91 NRR 32 328304 NUMARC COMM'l GRDE DEDICATION & PROCUR DEVELOP A CCMMERCIAL GRADE DEDICATION PROGRAM IN RESPONSE TO NRC GL,69-02 NRR 90-92 EROSION / CORROSION PROGR AM 33 328295 ESTABL ISH A LONG TEKM CORP PROGRAM TO MONITOR EROSION / CORROSION PRIDR TO 14R OUTAGE. NRC GL 89-08 NRR 90-94 34 3283t?

MOV PROGRAM DESlCN 6 ASIS REVIEW, STRESS ANALYSIS AND TESTING Of MOV'S lDENTiffED BY THE PROGR AM PER NRC GL 80-10.

E OYSTER CREEK PROJECT L i ST1 NG LEGEND NRC 1 NTEGRATED SCHEDULE I

NEW PROJECTS.

BA NUMBER CHANGE CATEGORY 'C' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA j

I CYCLE /

CL ASS I F I CAT I ON OBS BA DESCRIPTION YEARS NUMBER 35 323637 CHECK VALVE MONITORING /INSP. PROGRAM 13 REL RB TB OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERAT ION AL PROBLEMS.

INPO-SOER 66-03 13 MRC S"ENT FUEL POOL CLEANUP 36 323638 119 REMOVE AND DISPOSE OF IRRADIATED HARDWARE AND SILT 13 NRR 37 326213

  • OUTAGE 151 DW RB TB INSPECT HANGERS, PdPING WELDS, &

COMPONENTS TO SATISFY SECTION XI REQUIREMENTS 13 ISM 38 402823 GROUNDING & LICHINING PROTECTION YARD RB TB R6 INST ALL LIGHTNG PROT FOR RB & TB.

GROUNDING FOR NORTH GUARD HOUSE, MAIN GUARD HOUSE, L ARGE STORAGE T ANKS.

13 MRC REPL UPPER TB & OLD MACHINE SHOP ROOF 39 402898 YARD REPLACE THE OLD MACHtNE SHOP ROOF, 13 RAD ALARA PROGRAM 40 402914 TB I NST AL L JO BACKWASH SYSTEM CONDENSATE DEMINERAll2ERS 13 REL 41 402950 DRYWELL CORROS lON CONTROL DW TOR RB23 REMOVE THE SAND FROM THE SANDBED REGION j

OYSTER CREEK PROJECT L I ST I NG LEGEND NRC i NTEGRATED 5CHEDULE NEti PROJECTS.

    • BA NUMBER CHANGE CATECORY 'C' PROJECTS STATUS AS OF 06DECol SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASSiflCATION OSS BA DESCRIPTION YEARS NUMBER MRC 13 SPENT FUEL POOL CLEANUP 42 408838 119 REMOVE AND DISPOSE OF IRRADIATED HARDWARE IN THE SFP. IE CRB'S,LPRM'S FUEL CHANNELS ETC.

REL 43 323637 CHECK VALVE MONITORING /INSP. PROGRAM 130 RB 1B OPEN AND INSPECT CHECK VALVES THAT EXHIBIT OPERATIONAL PROBLEMS.

INPO-SOER 86-03 MRC 13U 44 402950 DKWELL CORROSION CONTROL Dv/

RB REMOVE SHEEYMETAL ARO'JND TORUS AND REMOVE S VD FROM THE SANDBED REGION.

REL 13U 45 408836 VALVE REPLACEMtNT RB TB REPLACE SELECTED v'ALVES IDENTiflED AS HAVING MAJOR DEFICIELCIES MRC 14 46 402898 REPL UPPER TB & OL D MACHINE SHOP RDOF YARD REPLACE THE UPPER TURBINE BUILO f NG RCOF.

FRC 14R 47 323624 VALVE MAINTENANCE & OVERHAUL TB DW RB CORRECTIVE & PREDICTIVE MAINTENANCE OF SELECTED VALVES.

MRC 14R 48 323629 CRD HCU MODULE REBUILD-14R RB23 REBUILD 35 CRD HYDRAULIC CONTROL UNfTS

r; OYST.ER C.R E,E K-P R'O J E C T LI ST I NG LEGEND

,~

NRC.

I NTEGRATED S'CHEDULE NEW PROJECTS.

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS' L

SORT BY CATEGORY / CYCLE /BA -

STATUS #6 OF 06DEC91 OBS BA DESCRIPTION' LCYCLE/.

CLASSlFICATION.

NUMBER YEARS-49 32363T CHECK VALVE MONITORING /lNSP. PROGRAM 14R REL RB TB t

OPEN AND INSPECT CHECA VALVES THAT EXHlBIT OPERATIONAL PROBLEMS.

INPO-SOER 86-03 j

TURBINE-GENERATOR SYSTEMS INSPECTION-14R 14R MRC.

SO 323646 **

TB INSPECTION OF THE TbRBINE, GENERATOR',

AND' ASSOCIATED SYSTEM COMPONENTS AND VALVES DURING 14R.

51 323648 **

CONT ISOLATION VALVE: MAINT-14R 14R NRR t

RB REFURBISH CONT ISO VALVES lDENTIFIED BY l

LLRT'S.' APPROX 15 VALVES ASBESTOS ABATEMENT-14R 14R ORR 52 323651 TB RB REMOVAL / REPLACEMENT-OF ASBESTOS LAGGING MATER I ALS. OSHA CFR 1910.1001 L

REFUEL FLOOR-RX DISASSEMBLY / REASSEMBLY 14R MRC l

i 53 323659 **

l'

.119 i

1 T ASKS ASSOCI ATED WiTH RX DISASSEMBLY AND REA3SEMBLY, ANO. SUPPORTING ACTIVITIES D.W, SCAFFOLD & INSULATION 14R' GWC 54 326L13 **

DW INSTALL SCAFFOLD'IN D.V. TO SUPPDRT ALL-ACTIVITIES. REMOVE AND REINSTALL D.W.

INSULATION.. REMJVE SCAFFOLD 55 326213 **

OUTAGE ISI-14R 14R NRR-RB DW TB

1NSPECT HANGERS,. PIPING WELDS,

& COMPONENTS TO SATISFY SECTION XI REQUIREMENTS' 1

J

c' OlY S T'E R................._'E E K ~

P.R'O J E'CrT' LIST I N. G l CR r

, LEGEND a

4-NRC 1 N'T E G R'A T E D S C'H E D U L.E NEW PROJECTS.

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS 8

STATUS AS OF 06DEC91' SORT BY CATEGORY / CYCLE /BA OBS

-BA DESCRIPTION CYCLE /

CLASSITICAT40N NUMBER YEARS N

56 328308 RCS PIPING REPAlR CONTINGENCY 14R MRC DW CONTINGENCY FOR ICSCC FINDINGS.

ASSUMES ONE 6" OVERLAY IN RWCU.AND i

tNSP OF 9 ADD'L WELDS.

57 328310 RX INTERNAL INSPECTION 14R NRR 119' DW VISUAL !NSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES.

58 402AHE

  • CORE SPRAY SYSTEM UPGRADE 14R REL RB PROVIDE'VARIOUS UPGRADES'TO CORE SPRAY SYST. INCL. NEW VENT SYST., NEW VALVE-18 CONTROLS AND LOAD PUMPS TO DIESEL SEP BS i

59 402CCC OTHER OUTAGE RELATED ACTIVITIES 14R ALL ALL OUTAGE RELATED ACTIVITIES SUCH AS' INSPECTIONS, REPAIRS,'SURVEILLANCES, j

MINOR MODIFICATIONS, MOD SUPPORT, ETC.

60 402821 RX RECIRC PUMP & MOTOR VfBRATION MONITRS 14R MRC DW RB' CR INSTALL VlBRATION MONITORING TRANSDUCERS AND SUPPORT EQUIP. FOR 4 REClRC PUMPS 7 TRANS./ PUMP AND 5 FOR 1 PUMP.

I 61 402901 FEEDWATER SYSTEM IMPROVEMENTS 14R REL CR NCSR REPLACE ANALOG CONTROL SYSTEM WITH f

DIGITAL.

62 402925 GENERATOR PROTECTION UPGRADE 14R ISM i

CR j

ADD CABLE TRAYS AND CABLING IN THC CONTROL ROOM IN PREPARATION FOR 15R i

l

a OYSTCR CREEK PROJECT L i GT I NG LEGEND NRC I NTEGRATED

$CHEDULE NEW PROJECTS.

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA CYCLE /

CL ASS i f l CAT I ON OBS DA DESCRIPTION YEARS NUMBER 63 402929 DIGITAL RECIRC FLOW CONTROL 14R 14R REL CR REPLACE GEMAC HARDWARE WITH DIGITAL SYSTEM.

14R RAD i

64 402939 DRYWFLL EXPOSURE REDUCTION MODS.

DW INSTALL IMPROVED RIGGING FOR MSSV'S AND ENRV'S.

14R NRR H2/02 AN ALYZER MOD I F I CAT ION 65 402951 DW RB REPLACE INBOARD TARGET ROCK VALVES, RELOCATE CONTAINMENT I SOL AT I ON V AL VE S,

PROVIDE APP.J LEAK RATE TEST CONNECTIONS 14R ISM 66 402963 LP TURBINE BLAOE REPLACEMENT TB REPLACEMENT OF LP 1STH STAGE BLADES ON " A " LOW PRESSURE TURBINE 14R REL 67 408836 VALVE REPLACEMENT RB TB REPLACE SELECTED VALVES IDENTIFIED AS HAVING MAJOR DErlCIENOIES.

NRR 68 402AGZ

  • SITE EMERG. BLOG. EMERG. POWER SOURCE 15 INSTALL AND CONNECT STANDBY POWER TO THE TECH. SUPPORT CENTER.

NRR 15 REPLICA SIMULATOR MODS 69 409L10 MODIFY THE SIMULATOR AS NECESSARY TO MAINTAIN LIKENESS WITH CONTROL ROOM AS REQUIRED i

7 OYSTER CREEK PROJECT L i STI NG LEGEND NRC I NTEOP ATED SCHEDULE NEW PROJECTS.

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASSIFICATION 085 BA DESPRIPTION YEARS

____........ _..__........___..___.__...........___..............__.__...._.~....___ _............___....__.__.__._........___..

NUMBER MRC 70 323LOS

  • TURBINE VALVE INSP.-NML.15R 15R INSPECT TURBINE ASSOCI ATED VALVES TO BUCAETS ON A,B,&C LP AND OTHER COMPONENT AS PRESCR IBED BY NML OR MANUF.

NRR CONTAINMENT ? SOLATION VALVE MAINT 15R 71 323LO7 RB DW PERFORM CORRECilVE MAINTENANCE ON CONTAINMENT VALVES WHICH DO NOT PASS ILRT ORR 15R

/.5BESTOS ABATEMENT 72 323L13 CB LEVEL OF EFFORT ASBESTOS REMOVAL TO SUPPORT OUTAGE WORK MRC 15R REFUEL FLOOR-RX DISASSEMBLY / REASSEMBLY 73 325L22 TASKS ASSOCinTED WITH REACTOR DISAISEMBLY AND REASSEMJLY AND SUPPORTING ACTIVITIES MRC 15R VALVE MAINT & OVERHAUL 74 323L34 RB TB DW CORRECTIVE AND PREDICTIVE MAINT ON SEL.ECTED VALVES MRC 15R CRD HCU REBUILD 75 323L38 RB REBulLD 35 CRD HYDRAULIC CONTROL UNITS MRC LPB TURBINE AND GENERATOR INSP-15R 15R 76 323L47 TD INSPECT LPB AND GENERATOR AND OTHER TURBINE RELATED COMPCNENTS FOR NML REQUIREMENTS AND MANUT. SUCGESTION a

OYSTER CREEK PROJECT L I ST I NG LEGEND NRC I NTEGRATED SCHEDUL E NEW PROJECTS.

    • BA NUMBER CHAtGE CATEGORY

'C' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASSIFICATION OBS BA OESCRfPTION YEARS NUMBER NRR 15R 77 326LC2 OUTAGE ISl-15R ALL INSPECT HANGERS, PIPING WELDS,&

COMPONENTS TO SATISFY SECTION XI REQUIREMENTS DRYWELL SCAf f OLDING & INSULATION 15R GWC 78 326L14

  • DW I NST ALLSCAF FOLD IN D.W.

TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.

INSULATION. REMOVE SCAFFOLD l

79 328ADL RK V INTERNAL INSPECTION-15R 15R NRR 119 l

VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQ'D BY ASME CODES.

TSR RAD CHEMICAL DECON-15R 80 328AFL DW RB l

PERFORM CHEM DECON OF THE RECiRC AND CLEANUP SYSTEMS, AND THE DWEDT TO REDUCE RAD'\\ TION LEVELS 15R REL j

81 328AFQ RCS P t P ING REPAIR CONTI NGENCY DW RB CONTINGENCY FOR ICSCC FINDINGS ASSUME TWO OVERLAYS (ONE 10" AND ONE 6")

AND ADD'L INSP. SAMPLE OF 19 WELDS NRR 15R 82 402ABQ SQUG MODS IMPLEMENT MODS RESULTING FROM SQUG l

WALF DOWN IN 15R. SCOPE NOT YET DErlNED.

J l

I 83 402736 DUAL VALVE INDICATION REMOVAL-PH 1 15R ISM I

CR RB REPLACE DOUBLE VALVE INDICATION i'

LIGHTS IN C.R.

PNLS 1F/2F, 11F. INSTAL NEW CABLING FROM R.B.

TO C.R.

l

l

{

OYSTER CREEK P R O J'E C T L i ST I NG

+

LEGEND NRC i NTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY 'C' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASSIFICATION OBS SA DESCRIPTION YEARS NUK9ER 15R ISM 84 402925 CENERATOR PROTECTION UPGRADE TB ADD RELAYS AND ALARMS TO PRO TECT THE GEN AS PER PJM RECOMMENDATIONS.

85 402939 DRYWELL EXPOSURE REDUCTION MODS.

15R RAD DW INSTALL SHIELDING ON VARIOUS COMPONENTS IN THE DRYWELL 86 402939 DRYWELL EXPOSURE REDUCTION MODS.

15R RAD l

DW l

I NST ALL IMPROVED EQUIPMENT IN 1 8 SUMP AND HYDROL AZE AND RECOAT 1 8 SUMP 15R RAD 87 402939 ORYWELL EXPOSURE REDUCTION MODS.

OW l

INSTALL DRYWELL SERVICES FOR BREATHING /

i SERVICE AIR AND WATER.

15R NRR H2/02 ANALYZER MODIF ICAT ION 88 402951 RB CR REPLACE EXISTING EQU tPMENT WITH "EXO-SENSOR" EQUIPMENT IN RX BUILDING AND CONTROL ROOM, REPLACE SWITCHES 15R REL 89 402957 OC I A83 AN ALOG CONVERSION RB CR REPLACE 5 IA83 PRESS 3 WITCHES WITH ANALOG SYSTEM.

15R MRC 99 402961 OC EDG OUTPUT CONTROL MOO t F ICATION TB REPLACE THE EXISTING GOVERNOR WITH A WOODWARD AUTOMATIC CEN LOADING CONTROL.

REPLACE MISC. ELECTRICAL COMPONENTS.

i OYSTER CREEK PROJECT LIST 1 NG LEGEND NRC i NTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY 'C' PROJECTS STATUS AS OF 06DEC91 SORT BY CATEGORY / CYCLE /BA j

CYCLE,'

CLASS i f l CAT I ON OBS BA DESCRIPTION YE ARS NUMBER RECIRC FLOW SCRAM ELECTRONICS REPLACEM'T 15R ORR 91 402966 RB CR REPLACE EXISTING ELECTRONICS WITH D I G I T AL ELECTRONIC EQUlPMENT.

15R REL TBCCW HX REPLACEMENT 92 402973 TB REPLACEMENT OF ONE TBCCW HX 15R REL VALVE REPLACEMENT-15R 93 408L24 RB TB DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIENCIES 15R MRC 94 408825 CONDENSER VALVE REPLACEMENT TB REPLACE 2 CONDENSER BACKWASH VALVES 16R MRC LPC TURBINE INSP.-16R 95 323LO3 TB IN'PECT LPC AND OTHER TURBINE RELATED COMPONENTS FOR NML NML REQUIREMENTS AND MANUF. SUGGESTION 16R MRC 96 323LO6

  • TURBINE V ALVE INSP.-NML.16R INSPECT TURB I NE REL ATED VALVES TO SUPPORT NHL RECutREMENTS NRR CONTAINMENT ISOLATION VALVE MAINT 16R 97 323LO8 PERFORM CORRECTIVE MAINTENANCE ON VALVES WHICH DO NOT PASS THE ILRT i

..................................... T

' OYSTER CREEK PROJEC L'.I S T I N,G' LEGEND NRC-

'l'N T E G R A T E D SCHEDULE NEW PROJECTS.

g
    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS.

i SORT BY CATEGORY / CYCLE /BA-STATUS AS OF 06DEC91 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION l

NUMBER YEARS t

98 323L14

  • ASBESTOS ABATEMENT 16R ORR CB LEVEL OF EFFORT TO REMOVE ASBESTOSi TO SUPPORT OUTAGE WORK t

i REFUEL FLOOR RX DISASSEMBLY / REASSEMBLY 16R MRC 99 323L23 119 TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES VALVE MAINTENANCE & OVERHAUL 16R MRC 100 323L35 RB TB DW PERFORM CORRECTIVE AND PREDICTIVE HAINT ON SELECTED VALVES CRD HCU REBUILD 16R MRC 101 323L39 RB.

REBUILD 35 HYDRAULIC CONTROL UNITS 4

102 326LO3

  • OUTAGE ISf-16R 16R NRR ALL INSPECT HANGERS, PIPING WELD,&

COMPONENTS TO SATISFY SECTION XI REQUIREMENTS DRYWELL SCAFFOLDING & INSULATION 16R CWC 103 326L15 DW INSTALL SCAFFOLD IN D.W..TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL'D.W.

INSULATION. REMOVE SCAFFOLD RX. VESSEL INTERNAL INSPECTION 16R NRR 104 328LO5 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES 4

1 e

w-s-

OYSTER CREEK' P R O J E C T

'L i S.T'l NG-LEGEND NRC-INTEGRATED-SCHEDULE NEW PROJECTS.

    • BA NUMBER CHANGE CATEGORY 'C' PROJECTS I

............................................................................................................' STATUS AS OF'06DEC91-SORT BY CATECORY/ CYCLE /BA OBS BA DESCRIPTION CYCLE /

CLASSfflCATION j.

NUMBER YEARS t

105 328LO9

  • RCS PIPING REPAIR CONTINGENCY-16R 16R REL RB DW CONTINGENCY FOR ICSCC FINDINGS i

106 402ABQ SQUG MODS 16R NRR IMPLEMENT MODS RESULTING FROM SQUG WALKDOWN IN 15R. SCOPE NOT YET DEFlNED 107 402636 WIDE RANGE NEUTRON MONITORING 16R NRR DW13 INSTALL AN 8 CHANNEL WRNM SYSTEM TO REPLACE EXISTING SRM'S/lRM'S.

108 402819 RECIRC PUMP MOTOR RTD CIRCUlTS UPGRD 16R MRC DW RB23 REPLACE RTD CABLES ON ALL 5 RECIRC PUMP MOTORS FROM MOTOR JUNCTION BOX TO PENETRATION OUTSIDE DW.

109 402948 LP TURB. C LAST STAGE BLADE INSTALLATION 16R-REL TB REPLACE LAST STAGE BLADES IN LP TURBINE "C".

BLADE FAILURE CONCERNS.

110 4029T3 TBCCW HX REPLACEMENT 16R REL TB REPLACE ONE'TBCCW HX i

111 408L25 *'

VALVE REPLACEMENT-16R' 16R REL' RB TB DW REPLACE SELECTED ' VALVES IDENTIFIED AS HAVING DEFICIENCIES 1

+

,r

OYSTER CREEK PROJECT L iST I NG LEGEND NRC 4 NTEGRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'C'

'ROJECTS STATUS AS Of 06DEC91 SOR1 BY CATEGORY / CYCLE /BA

____________,____-....__..___........_...____......____...................___.._____....._.___..CLA!'ilF! CATION CYCLE /

OSS BA DESCRIPTlON YEARS NUMBER NRR 87-91 112 409057 S !MUL AT OR F AC IL I TY CONSTRUCT A THi-TYPE SIMULATOR BLOG AT O.C.

FOR SlMULATOR AND BPT.

113 402880 0.C.

FUEL POOL CORE Off LOAD (STUDY) 87-96 ORR ESTABLISH ADDITIONAL SPENT FUEL STORAGE CAPACITY FOR FULL CORE OFFLOAD BEYON-1994 AT O.C.

MRC 89-94 114 323594 L i f E OF SYSTEM MAINT PLAN ALL PERFORM REVIEWS Of O.C.

PLANT SYSTEMS.

IMPLEMENT MODS / REPAIRS RESULTING FROM SYSTEM REVIEWS.

NRR 90-91 115 328305 DRYVELL SERVICEABIL ITY EXTENSION ANALYS I PERFORM CONTAINMENT PRESSURE ANALYSES AND MATERIAL CERTS REVIEW TO JUSTIFY INCREASED CORROSION MARGIN ISM 116 402943 CONF lCURAT ION MANAGEMENT-DB0 1991 91 DEVELOPMENT Of OC SYSTEM DESIGN BASES.

PERFORM SSF'S AND IMPROVE DRAWING LEGIBfLITY NRR FW/CRDR NOZ MOCK-UP THERMAL FATfGUE CRAC 92 117 328325 INSTALL 14 THERMAL FATIGUE CRACK IMPLANT INTO THE FW & CRDR NOZZLE MOCKUP. UTL TO PERFORM DEMO UT TO DETECT & SIZE CRACKS NRR 9?

REPLICA SIMULATOR MOOS 116 409244 UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE.

OYSTER CREEK PROJECT L i ST I NG LEGEND NRC 1 NTECRATED SCHEDULE NEW PROJECTS.

BA NUMBER CHANGE CATEGORY

'C' PROJECTS STATUS AS OF 06DEC91 l

SORT BY CATEGORY / CYCLE /BA CYCLE /

CLASS 1FiCATION OBS BA DESCRIPT4ON YEARS NUMBER NRR NUMARC PROCUREMENT INITIATfVE 92-93 119 409229 IMPROVEMENTS TO PROCUREMENT QA TO MEET THE REQUIREMENTS OF THE NUMARC PP.OCURE-MENT AND NRC GEN LTR.

NRR ACCIDENT MANAGEMENT GUIDELINES 92-94 120 40?981 DEVELOP ACC10ENT MANAGEMENT GUIDELINES TO COPE WITH DAMAGED CORE EVENTS (PART OF IPE REQUIREMENTS, G.L. 88-20).

NRR INDIVIDUAL PLANT EXAM. - EXTERNAL EVENTS 92-94 121 402982 PERFORM IPE ANALYSIS OF EXTERNAL EVENTS FOR SEVERE ACCIDENT VULNERABILITIES.

l 92-95 REL 122 328148 O.C. PLANT LIFE ASSURANCE & EXTENSION DEVELOP 3-PHASE PLEX PLAN. PHASE 1 TO DETERMINE FEAStBtLITY AND COST /

ANALYSIS OF PLEX.

ISH 92-96 CONFIGURATION MANAGEMENT-DBD 92-96 123 402980 DEVELOPMENT OF OC SYSTEM DESIGN BASES PERFORM 4 TO 5 DBD'S PR YE.AR OVER 5 YEARS.

NRR 93 124 409y3E REPLICA StMULATOR MOOS UPGRADE 1HE StMULATOR TO MATCH PLANT MODS AS APPLICABLE NRR 94 REPLICA SIMULATOR MODS 125 409948 UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE

ABC Classifications a) lim. 3C Reautrementi (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an HRC non compliance even though the specific activity is not required by the NRC.

b)

Meet Environmental Reauirements (ERR)

Activities that a) are specifically required by environmental regulatory agencies 1

(State and Federal) or b) have been tommitted to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non compliance even thoJgh the specific activity is not required by an environmental regulatory agency.

c) lint Other Reauirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company-is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.

d)

Jncrease Safety Marains (ISM) - Activities that, if implemented, e ll improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.

e)

Decrease Environmental Ef fects (E) - Activities that, if imp;emented, will result in an improved env';onmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.

f)

Imorove Radioloaical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by radiological regulations, codes or guidance.

g' Maintain Re,liabilit dCapabjltt_y (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment.

Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear ind:istry high unavailability equipment data without which the plant could not operate prudently.

h)

Imorove Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by 'mproving availability or capacity factor to maximize energy output.

i)

Imorove Operational Effectiveness (10E) - Activities that, if implemented, will improve staff efficiency or provide a direct ecbnomic payback in terms of reduced operating / maintenance costs.

C3112918.LET

l i

o j)

JEftDve Personnel F.arilities (FAC) - Activities that, if implemented, will improve working conditio" and the usefulness of personnel far,ilitics.

k)

Provide Continaency/Blanke_t. (CUI) - Activities that, if implemented, will provide management flexibility tc respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

1) h! proves Heat Rate Performance (HRP)

Activities, that, if implemented, will increase power production by enhancina the heat rate ef ficiency.

C3112118.LET

hUhCllMEpT B DISTER CREEK NUCLE 1Jt Gr,NEPATING STATION I

NRC Ik".'EGRATED SCHEDULE SEl'IANNUAL UPDATE CATEGORY "A"

PROJECTS ADDITIONS:

None COMPLETIONSt None DELdTIONS:

B/A 402AEI, ATWS (Ari Mod.)

Exemption fro.a 10CTR 50.62(c)(3) granted on Septem% r 26, 1991.

SCHEDULE CHANGES:

B/A 402011, Replica rimulator certification.

The simulator development schedule alternatives are discussed in GPUN Letter C321-91-2293 to the NRC.

All of the acceptance testing necessary to certify the simulator's performance will not be completed by December 31, 1991. The primary reason for extending the schedule is due to technical problems with the NSSS model. GPUN will meet with NRC in Decetaber 1991 to finalize what exemptions or NRC approvals will be required. C120703

. - _ ~. -.... - -..

= - -. - -.. - -.. _ - -.. - - - - _

- - =.. - - ~. - - -.

CATEGORY

  • D' PROJECT 6 ADDITIONS:

As denoted by

  • next to the project title in Attachment A.

COMPLETIONSs J /A __

TITLE 323613 cont. Isolation Valve Instr. Air System Inspection 323635 Reactor Building Delta Pressure Indication System 328100 CRD Nosrie Etternal UT Inspection 328204 RCS Aug. IGSCC Inspection 328279 Core Spray Booster Pump Logic Revision 328298 Reactor Manual control System Mod.

402859 ESW Flow Indication (Control Room) 402872 Torus 0 SamP e Line Isolation l

2 402879 RPS/ESG Instrument Upgrade 402900 Isolation Condenter Piping Mods.

402927 Upgrade Power Supply to Isolation Cond. Valves 402938 RWCU Penetration Piping Replacement 402946 Containment Isolc. tion Valve Replacement (13R) 402950 Drywell Corrosion Control (13R) 408815 EDG Fuel Oil Tank Replacement 408820 Rosemount 1153 Transmitter Replacement DELETION:

328284 - Closure Head Welds Replacement This project is deleted due to 14R outage workload and cost-benefit analysis.

IGSCC inspections will continue to be

-performed in accordance with technical specifications.

Piping will be replaced as IGSCC la identified.

SCHEDULE CHANGES: 328226 - SQUG walkdowns will be performed in the 15R outage, to coincide with the walkdowns required for the IPE External Events analysis.

328280 - RCS stress improvement inside the drywell is deferred from the 14R outage to the 15R outage due to priority and effective use of GPUN resources.

328312 - The schedule extension from 1992 to 1994 does not adversely impact the requirements of GL 89-10.

This schedule is reflected in the GPUN Hotor-Operated Valve Program. C120703

_ _.. _... _. _ _ - -. _ _, _ ~,. - _

402808 - Conversion of the SIGHA computer room to a CSS office will be completed in two phases.

Phase 1 will remove the existing computer and provide i

office space for operations personnel. This work I

will be done in cycle 13.

Phase 2 will be done in refueling outage 15R, and will convert this area into a permanent GSS office, including security requirements in order to maks it an integral part of the control Room.

402910 - Replacement of Control Poom Recorders is scheduled over two catages based on priority and available GPUN resources.

Five of the more critical recorders will be replaced in the 14R outage, and the remaining ten recorders will be replaced in the 15R outage.

402AGA - The schedule change for deferring the Reactor Overfill Protection System (ROPS) modifications from the 14R to 15R outage was accepted by NRC in a letter dated September 27, 1991.

OTHER CHANGES:

PREVIOUS NEW QDg_f TITLE B/A RfA 21 RG 1.97 Power Supply scope 402AGP 402AGO 25 Reactor overfill Protection 402AGA 402974 System N/A cleanout of Stored Radwaste 323641 N/A*

  • This activity will be completed under the plant functional budget during Cycle 13.

i e

l C120703 T

w.

9

-yyr 4y

.+m e

-~

gwm-y M

y-w

r g

CATEGORY

  • C" PROJECTS ADDITIONS:

As denoted by

  • next to the project title in Attaciunent A.

COMPLETIONS:

D/A TITLE 322024 Drywell Scaffolding and Insulation 323457 Check Valve Monitoring / Inspection Program 323476 Diesel-Generator Improvements 323577 Recirculation Valve Maintenance 323580

'B' LP Turbine Ins}*ction 323592 Containment Isolation Valve Maintenance 323593 CRD Hydraulic Control Unit Module Rebuild 323605 Valve Maintenance and overhaul 323612 Asbestos Abatement Program 326201 Outage ISI 328203 Reactor Internal Insiection 328230 RCS Piping Repair contingency 328265 Chemical Decontamination 402088 Other Outage Related Activities 40.860

'B' LP Turbine Diade Replacement 402869 Cable / Conduit Repair - Circulating Water Pump Pit 402901 Feedwater System Improvements 402915 Remove Main Steam Safety Valves 402939 Orywell Exposure Reduction Hods (4 line items) 402945 New Feedwater Flow Element 402952 Chemical Decontamination Support Systems 408844 condensate Storage Tank Bottom Replacement DELETIONS:

None SCHEDULE CHANGES: The following projects have been rescheduled from the 14R outage to the 15R outage due to priority and available GPUN resources: B/A Numbers 402736, 402939 (three drywell exposure reduction modifications), 402957, 402961, 402966, 402973, and 408825.

The following projects have been rescheduled from the_15R outage to the 16R outage due to priority and available GPUN resources:

B/A Numbers 402636, 402819, 402948, and 402973.

402896 - Roof replacements will be completed over two operating cycles; the Old Machine Shop Roof during cycle 13, and the Upper Turbine Building Roof l i during cycle 14.

402925 - Generator Protection Upgrade will be completed in two phases.

Phase I will install cable trays and j

cables in the control Room during the 14R outage.

l Phase 2 modifications to protect the generator will be completed in the 15R outage.

402ABQ - Modifications resulting f rom the SQUG walkdowns in 15R will be implemented during the 15R and 16R outagos. l

~-

., - _ ~. - -

o

,,'OTHER CHANCES: The following Budget Activity (B/A) nund>ers have been changed:

PREVIOUS Nevi OBS #.

TITLE B/A Rfh 35 Spent Fuel Pool cleanup 323Aco 323638 41 Spent Fuel Pool cleanup 408AER

- 408838 50 Turbine - Generator Systems Inspection - 14R 323AcJ 323646 51 cont. Isol. Valve Maint.-14R 323ACV 323648 52 Asbeste,s Abatement - 14R 323ADC 323651 53 Refuel Floor - Rx. Disassembly /

Peassembly 323AGF 323659 54 Drywell scaffolding &

322024 326L13 Insulation SS Outage ISI - 14R 32691E 326213 91 Recirc. Flow Scram 402AEV 402966 Electronics Replacement 92,110 TBCCW Heat Exch. Replacement 402AFJ 402973 118 Replica Simulator Mods.

409920 409244 Life of System Maintenance Plan changed from cycle 323594 12-14 to years 1989-1994.

Configuration Management DBD 92-96 combines B/A 402980 Numbers 402Arv, 402AFW, and 402AFX from the last ILS submittal.

'A' LP Turbine Inspection has been combined with 323LPA D/A 323AcJ, Turbine-Generator System Inspection.

l 1 c120703