f[5 Southem Califomia Edison Company P, O. BOX 128 SAN CLEMENTE. CALIFOANIA92674 0128 MaceAor n op enx,L MFeo HY APF AtHS (71 )
501 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Twelfth Edition of the Integrated Implementation Schedule (IIS)
San Onofre Nuclear Generating Station Units 2 and 3 1
Reference:
Letter from W. C. Marsh (SCE) to Document Control Desk (NRC),
i dated December 29, 1994; Eleventh Edition of the Integrated Implementation Schedule (IIS).
Enclosures 1 through 3 provide the Twelfth Edition of the Integrated i
Implementation Schedule (IIS) for the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3. updates the Schedule A, B, and C projects listed in the Eleventh Edition of the IIS (referenced) for SONGS 2 and 3. provides the current Schedule A, B, and C projects for SONGS 2 and 3 for Cycles 8 and 9. lists the ongoing evaluations for major issues for SONGS 2 and 3.
The Westinghouse Analytical Ranking Program (WARP) was not used to rank the relative safety significance of each Schedule A and B modification because their implementation schedules have been established in separate correspondence.
If you have any questions on the Twelfth Edition of the San Onofre Units 2 and 3 IIS, please let me know.
Very truly yours, 9alb8 Enclosures l
I cc:
L. J. Callan, Regional Administrator, NRC Region IV A. B. Beach, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 9507200102 950717
$O[
lh
i ENCLOSURE 1 SCIIEDULE A, H, AND C UPDATES (11th Edition IIS dated 12/29/94) l
l Enclosure.1 - lith Edition IIS Schedule Updates Schedule A Updates 1
Update Unit Ibe Date IX'P Descripion Comments Number
-mmm No Change C
2/29/96 7044 Vehicle Security Barriers Rule change affecting 10 CFR 73 1
Schedule B Updates 4
Update Unis Due Date IX'P Desaiptism Comments Number M
M M
Complete 2
Cycle 8 2005.00 In-containment Post Accident hfonitoring Instrumentation Improvements Complete 2
Cycle 8 6910 Upgrade Target Rock Solenoid Generic Letter 9115 i
Valves 1
l Complete 2
Cycle 8 6988 Addition of Valves and Drains Generic letter 8944 for In Service Test Complete 2
Cycle 8 2060.00 Degraded Grid Voltage PCN 429 submittal to NRC Sepember 30,1993 l
No Change 3
Cycle 8 2005.00 Inantainment Post Accident hionitoring Instrumentation Improvements l
No Change 3
Cycle 8 6910 Upgrade Target Rock Solenoid Generic letter 9115 Valves
(
No Change 3
Cycle 8 6988 Addition of Valves and Drains Generic letter 8944 for In-Service Test I
f i
2-Schedule C Updates Update Unis Duc Date DCP Description N a ber Complete 2
Cycle 7 6191.00 Turbine fluilding Sump Radiation hionitor Low Flow Alarms From Cycle 7 2
Cycle 7 6869 Auxilary Feedwater Overspeed Trip Setpoint to Cycle 8 l
l From Cycle 8 2
Cycle 8 6683.04 Snubber Reduction l
to Cycle 9 Complete N/A Cycle 8 2066.00 EOF Diesel klodification Complete 2
Cycle 8 6716.00 hiodify E1 ant hionitoring System and core Operating Limit Supervisory System Back-up Computer System Complete 2
Cycle 8 2012.00 F020 Filter Replacement Complete 2
Cycle 8 2061.00 Component Cooling Water Fuses I
Complete 2
Cycle 8 2063.00 Steam Generator Distribution Box Replacement Complete 2
Cycle 8 2067.00 hiain Steam Isolation Valve Bypass Line blodification Complete 2
Cycle 8 6605.08 Control Room llaman Factors No Change 2
Cycle 8 6735.03 Ladders and Platforms No Change 2
Cycle 8 6851.00 Replace loose Parts and Vibration hionitoring System No Change 2
Cycle 8 6855.00 Install Removable Digital Polar Crane Controls No Change 2
Cycle 8 6864.00 Install Removable Refueling hiachine Controls From Cycle 8 2
Cycle 8 6876.00 Containment Purge and Plant Vent Stack Radiation hionitor to Cycle 9 No Change 2
Cycle 8 6885.00 Replace Turbine Plant Secondary System Chemistry Instrumentation Complete 2
Cycle 8 6914.00 Turbine Governor Valve hiodifications
' Schedule C Updates Update Unit Duc Date DCP Description Number No Change 2
Cycle 8 6946.00 Automatic Veltage Regulator Replacement Complete 2
Cycle 8 6974.00 lead Center Transformer Replacement Complete 2
Cycle 8 6984.00 Ex-core Neutron Detectors I rom Cycle 8 2
Cycle 8 6990.00 Reactor Coolant Pump Design Changes to Cycle 9 No Change C
Cycle 8 6913.00 Toxic Gas Isolation System Instrurnent Replacement No Change C
Cycle 8 7032.00 Replace llP1000 Computer and Meteorological I:quipment Enclosure I rom Cycle 8 C
Cycle 8 7041 800 Milz Cabinct Replacement to Cycle 9 No Change C
Cycle 8 2071 Instrument Air Modifications l' rom Cycle 1 3
Cycle 7 6605.08 Control Room iluman fractors to Cycle A Complete 3
Cycle 7 6191.00 Turbine Inuilding Sump Radiation Monitor low Ilow Alarma I rom Cycle 7 3
Cyde 7 6869 Auxiliary l'cedwater overspeed Trip Scipoint to Cycle 8 No Change 3
Cycle 8 2012.00 1020 l'ilter Replacement No Change 3
Cyde8 2061.00 Component Cooling Water l'uses No Change 3
Cycle 8 2061.00 Steam Generator Distribution IL)x Replacement No Change 3
Cyde8 2067.00 Main Steam Isolation Valve liypass Line Modification No Change 3
Cycle 8 6683.04 Snubber Reduction Complete 3
Cycle 8 6716.00 Modify Plant Monitoring System and Core operating Limit Supervisory System itack-up Computer Systems
l
' Schedule C Updates Update Urst Due Dese DCP Description Number mmm No Change 3
Cycle 8 6735.03 1 adders and 11atibrms No Change 3
Cycle 8 6851.00 Replace loose Parts and Vibration Monitoring System No Change 3
Cycle 8 6855.00 Install Removable Digital Polar Crane Controls No 'hange 3
Cycle 8 6864.00 Install Removable Refbcling Machine Controls l' rom Cycle 8 3
Cycle 8 6876.00 Containment Purge and Plant Vent Stack Radiation Monitor to Cycle 9 No Change 3
Cycle 8 6885.00 Replace Turbine Plant Secondary System Chemistry Instrumentation No Change 3
Cycle 8 6914.00 Turbine Governor Valve Modifications No Change 3
Cycle 8 6946.00 Automatic Voltage Regulator Replacement No Change 3
Cycle 8 6974.00 load Center Transformer Replacement No Change 3
Cycle 8 6984.00 Ex-core Neutron Detectors No Change 3
Cycle 8 6990.00 Reactor Coolant Pump IMaign Changes Add 2
Cycle 9 2057.00 Repair Amertrap Vault Add 2
Cycle 9 2064.00 Modify II. P. Turbine No Change 2
Cycle 9 6683.05 Snubber Reduction - Phase VI No Change 2
Cycle 9 6926.00 Replace Nuclear Monitoring Corporation Radiation Monitors Add 3
Cycic 9 2057.00 Repair Amertap ia tt Add 3
Cycle 9 2064.00 Modify 11. P. Turbine No Change 3
Cycle 9 6683.05 Snubber Reduction Phase VI No Change 3
Cycle 9 6926.00 Replace Nuclear Monitoring Corporation Radiation Monitors
i O
f ENCLOSURE 2 BYELFTII EDITION IIS (SONGS 2 AND 3) i l
SONGS 2 & 3 Integrated Implementation Schedule Twelfth Edition l
Schedule A l
tinit the Date DCP Number Descrignm Commcuts l
C 2/29/96 7044 Vehicle Security llarrhrs Rule change affecting 10 CI'R 73 I
l Schedule B Unit Ibe Date IX'P Numbcr Description Commcass 3
Cycle 8 6910 Upgrade larget Rak Solenoid Valves Generic letter 91-15 3
Cycle 8 6988 Addition of Valves and Drains for in-Scryice Generic letter 894)4 Test 3
Cycle 8 2005.00 In-Containment Post Accident Monitoring SCE to NRC letter March 28,1994 Instrumentation improvements Note i Note 1:
This modification willlie completed by the end of the Cycle 9 refueling outage, as committed in the March 28,1994 letter.
IMison's internal schedule is to complete this nnhfication in Cycle 8.
a i
-.,. ~. _
Enclosure, 2 Schedule C timt Duc Dese DCP Nunder Desuiption 2
Cycle 8 6869 Auxiliary Feedwater Overspeed Trip Setpoint 2
Cyde8 6735.03 ladders and 11atforms 2
Cycle 8 6851.00 Replace loose Parts and Vibration Monitoring System 2
Cycle 8 6855.00 Install Removable I)igital Polar Crane Controls 2
Cyc!c 8 6864.00 Install Removable Refbcling Machine Controls 2
Cycle 8 6885.00 Replace Turbine Plant Secomtary System Chemistry lastrumentation.
2 Cyde 8 6946 M j \\utomatic Voltage Regulator Replacement C
Cyde 8 6933.00 Toxic Gas Isolation System Instrument Replacement C
Cyde8 7032.00 Replace IIP 1000 Computer and Meteorological Equipment Enclosure C
Cycle 8 2071 Instrument Air Modifications 3
Cycle 8 6605.08 Control Room iluman Factors 3
Cyde 8 6869 Auxiliary I'ecdwater Overspeed Trip Setpoint 3
Cycle 8 6683.04 Snubber Reduction 3
Cyde8 2012.00 F020 Illter Replacement 3
Cyde8 2061.00 Component Cooling Water Fuses 3
Cycle 8 2063.00 Steam Generator Distribution flox Replacement 3
Cycle 8 2067.00 Main Steam Isolation Valve Bypass Line Modificaticn 3
Cyde 8 6735.03 ladders and 11atforms 3
Cycle 8 6851.00 Replace Loose Parts and Vibration Monitorig System
' Schedule C Unit Duc Date DCP Numhee Demiption m
3 Cycle 8 6855.00 Install Rernovable Digital Polar Crane Controls 3
Cycle 8 6864.00 Install Removable Refueling Machine Controls 3
Cycle 8 6885.00 Replace Turbine Plant Secondary System Chemistry Instrumentation 3
Cycle 8 6914.00 Turbine Governor Valve Modifications 3
Cycle 8 6946.00 Automatic Voltage Regulator Replacement 3
Cycle 8 6974.00 I oad Center Transformer Replacement 3
Cycle 8 6984.00 Ex-core Neutron Detectors 3
Cycle 8 6990.00 Reactor Coolant IMmp Design Changes b
2 f'ycle 9 2057.00 Repair Amertap Vault 2
Cycle 9 2064.00 Modify II. P. Turbine 2
Cycle 9 6683.04 Sm:bber Reduction 2
Cycle 9 6683.05 Snubber Reduction - Phase VI 2
Cycle 9 6876.00 Containment Itrge and Plant Vent Stack Radiation Monitor 2
Cycle 9 6926.00 Replace Nuclear Monitoring Corporation Radiation Monitors 2
Cycle 9 6990.00 Reactor Coolant Pump Design Changes C
Cycle 9 7041 800 MIII Cabinet Replacement 3
Cycle 9 2057.00 Repair Amettap Vanit l
3 Cycle 9 2064.00 Modify 11. P. Turbine 3
Cycle 9 6683.05 Snubber Reduction - Phase VI
i
.d Enclosure, 2 Schedule C linit Duc Date IX'P Number thaziption 1
m 3
Cycle 9 6876.00 Containment Ibrge and 11 ant Vent Stack Radiation Monitor l
3 Cyde 9 6926.00 keplace Nuclear Monitoring Corporation Radiation Monitors i
i I
D
e ENCLOSURE 3 ONGOING EVALUATIONS OF MAJOR ISSUES (SONGS 2 AND 3)
t l
ONGOING EVALUATIONS OF MAJOR ISSUES (SONGS '2 and 3) l GL 88-20, SUP 4 Individual Plant Examination of External Events (IPEEE), to be completed by.12/31/95.
GL 89-10 The initial safety related Motor Operated Valve (MOV) Testing and Surveillance will be completed for Unit 3 by the end of its Cycle 8 -
refueling outage. Unit 2 was completed during its recent refueling outage. Periodic verifications of MOV operability will follow.
t e
[
1 h
a s
m -
a s
.m
--.m