ML20086J641

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-OSC-1 Re Emergency classification,EPIP-OSC-8 Re Medical Assistance & EPIP-OSC-14 Re Emergency Duty Officer
ML20086J641
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/15/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20086J640 List:
References
LIC-83-317, NUDOCS 8401250022
Download: ML20086J641 (2)


Text

~

~

Omaha Public Power Districs 1623 Harney Omaha, Nebraska 68102 402/536-4000 December 15, 1983 LIC-83-317 Mr. J.

T.

Collins, Administrator U. S.

Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Reference:

Docket No. 50-285

Dear Mr. Collins:

Pursuant to 10 CFR 50, Appendix E, Section V, five (5) copies of changes to the Fort Calhoun Station Emergency Plan Implementing Procedures are being provided to the Commis-sion.

Three (3) copies (for control copy numbers 154, 155, and 156) are provided for your office.

Two (2) copies (for control copy numbers 165 and 166) have been provided to the g

Document Control Desk in Washington, D.C.

A transmittal sheet is provided for each ' copy to confirm receipt of the serialized document.

It is requested that these sheets be completed and returned within five (5) days of receipt.

Sincer ly,

&) { " (l42)

Y W. C. J nes Divisio. Man' age r ProductAon Operations WCJ:jmm Enclosures cc:

Document Control Desk U.

S. Nuclear Regulatory Commission Washington, D.C.

20555

(

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 Mr.

L. A. Yandell, Senior Resident Inspector

[

8401250022 040118 A M i

PDR ADOCK 05000205 lk F

PDR 3' US'"gfrb"a'[e " *"'N c'

-y-----,-------.r,yy-e g, ww y-,.

ey ym

--y.-my 9-w

---,,-,y.-------,m m m

-v-y.w

--c.-.

w.

... _. - =

r OMAHA PUBLIC POWER DISTRICT CONFIRMATION OF TRANSMITTAL EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIP)

Name be ene it4 Ca Mt n [

Def_k9 ate December 9, 1983 Holds and maintains Copy No. I b The following procedures are provided for your use:

Hemove Insert Procedure No.

Page No.(s)

Procedure Ho.

Page No.(s)

Table of Contents i (8-30-83),

Table of Contents i, ii, iii, iv, v, ii (8-23-83),

& vi (11-18-83) 111 (8-16-83),

iv (5-13-83),

v (8-30-83), &

vi (8-30-83)

OSC-1 1-1 thru l-14 OSC-1 1-1 thru l-6 (R3 7-12-83)

(R4 11-18-83)

OSC-8 8-1 & 8-2 (R1 OSC-8 8-1 thru 8-3 11-10-83)

(R2 11-18-83)

OSC-11 11-1 thru 11-3 OSC-11 11-1 thru 11-3

( R1 8-31-82)

(R2 11-18-83)

OSC-14 14-1 thru 14-5 OSC-14 14-1 thru 14-5

-(R1 05-05-83)

(R2 11-18-83)

EOF-1 1-1 & 1-2 (R1 E0F-1 1-1 thru l-3 1-31-83)

(R2 11-18-83) j (Continued on page 2)

/ ff Manager - Radiological Health

& Emergency Plannino I hereby acknowledge receipt of the above copy or numbered pages. The additional i

or revised pages have been included in my assigned copy of the EPIP and/or super-li seded pages have been removed as required.

!i Signed Date L

(Please sicn and return this fem within 5 days to the Adninistrative Services Departrent, Attention: Jane florfeld, Otaha Public Power District, 1623 Harney Street, Omaha, Nebraska 68102.)

l Note:

If EPIP copies have been transferred to another person or address, please fill out the spaces below.

i Name of Holder Address Ti tle/' epa r '.nent i

_. _ _