ML20086J197
| ML20086J197 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/05/1974 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086J196 | List: |
| References | |
| AO-74-33, NUDOCS 8401230298 | |
| Download: ML20086J197 (1) | |
Text
.... _ _.......
,/
r.
Pg.ADELPHIAELECTRICCOMPANY Kb" '
PeabpBottom Atomic Power Station (/g g, (tJ A L't M O b
..MeltAr.. Pennsylva ni m_
= = * - -
--=2
_n=1731t=E ussia==- -
j:-
c
_.__r.-
-a 1 -
Dwcrh d d974.-
". 32 re-E -4'sa111y,-Diractor
' W United States Atomic Energy Coeraission
- R Q Directorate of Regulatory Operatfons
%/
631 Park Avenue
[D King of Prussia, Pennsylvania 19406
- w W.
+
Subj ec t :
Abnormal Occurrence 24-Ilour Notification CO M
{gf L
Confireing V. T. Ullrich's phone conversation with Mr. Walt Baunack, A.E.C. Region 1 Regulatory Operations Office on December 5, 1974.
/
Reference:
License Number DPR-56 lechnical Specification
Reference:
Table 3.2.A J.Q um Roport No.:
50-278-74-33 ME s
lf; Report Date:
December 5, 1974 Occurrence Date:
December 4, 1974 p,
Fecility:
Peach Botton Atomic Power Station Ty
=
Delta, Pennsylvania 17314 t F.J M
Identification of Occurrence:
4"b; Failure of Main Steam Line High Flow Switch dPIS-3-2-116C to trip during a 4%
surveillance test.
].I; a
. :q '
Conditions Prior to Occurrence:
g.,
Unit 3 at approximately 75% power.
,g,
Description of Occurrence:
During a routine surveillance test, dPIS-3-2-Ll6C failed to trip.
Designation of Apparent Cause of Occurrence Probably a clight mechanical binding.
The Linding cleared during visual examination of the switch linkage.
Analysis of Occurrence:
There are no safety implications since its con:panion switch in a one-of-two-twice logic was operable and would have tripped at the prescribed setpoint.
4 Co r rec t ive Ac tion :
Following the failure to trip, the f ace and scale were removed from the instrument in order to watch the linkage during an operation to try to determine the type of f ailure.
The switch was again tested and this tima and each succeeding time it worked properly.
It was then reassembled, tested and continued to work successfull Failure Data:
Previous occurrences on theos type switches have been reported as dPIS-2-2-119D on 9/7/ 7 3, 50-277-74-28, 50-277-74-48, and 50-278-74-20.
Very truly yours, WYW W. T. Ullrich, Superintendent Pach Bottom Atomic Power Station 8401230298 741205 i
PDR ADOCK 05000278 S
pop u v&h -:.jpR f- %.6 9 h., +.f;; "ky6. : p * ; _s v.
.% ;.' ; %:;Y.+li + (Ngv
?.h.h)
.f h
$? k.h'
.h.
h.
y 6:: f;. O q 3. m A. y. J e 9 7 y. l ? ; s.. '- & :.d;.9 :~: