Telecopy AO 74-33:on 741204,main Steam Line High Flow Switch DPIS-3-2-116C Failed to Trip During Surveillance Test.Caused by Slight Mechanical Binding.Face & Scale Removed from Instrumentation to Watch Linkage
ML20086J197
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/05/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J196 List:
References
AO-74-33, NUDOCS 8401230298
Download: ML20086J197 (1)


Text

.... _ _.......

,/

r.

Pg.ADELPHIAELECTRICCOMPANY Kb" '

PeabpBottom Atomic Power Station (/g g, (tJ A L't M O b

..MeltAr.. Pennsylva ni m_

= = * - -

--=2

_n=1731t=E ussia==- -

j:-

c

_.__r.-

-a 1 -

Dwcrh d d974.-

". 32 re-E -4'sa111y,-Diractor

' W United States Atomic Energy Coeraission

R Q Directorate of Regulatory Operatfons

%/

631 Park Avenue

[D King of Prussia, Pennsylvania 19406

w W.

+

Subj ec t :

Abnormal Occurrence 24-Ilour Notification CO M

{gf L

Confireing V. T. Ullrich's phone conversation with Mr. Walt Baunack, A.E.C. Region 1 Regulatory Operations Office on December 5, 1974.

/

Reference:

License Number DPR-56 lechnical Specification

Reference:

Table 3.2.A J.Q um Roport No.:

50-278-74-33 ME s

lf; Report Date:

December 5, 1974 Occurrence Date:

December 4, 1974 p,

Fecility:

Peach Botton Atomic Power Station Ty

=

Delta, Pennsylvania 17314 t F.J M

Identification of Occurrence:

4"b; Failure of Main Steam Line High Flow Switch dPIS-3-2-116C to trip during a 4%

surveillance test.

].I; a

. :q '

Conditions Prior to Occurrence:

g.,

Unit 3 at approximately 75% power.

QA

,g,

Description of Occurrence:

During a routine surveillance test, dPIS-3-2-Ll6C failed to trip.

Designation of Apparent Cause of Occurrence Probably a clight mechanical binding.

The Linding cleared during visual examination of the switch linkage.

Analysis of Occurrence:

There are no safety implications since its con:panion switch in a one-of-two-twice logic was operable and would have tripped at the prescribed setpoint.

4 Co r rec t ive Ac tion :

Following the failure to trip, the f ace and scale were removed from the instrument in order to watch the linkage during an operation to try to determine the type of f ailure.

The switch was again tested and this tima and each succeeding time it worked properly.

It was then reassembled, tested and continued to work successfull Failure Data:

Previous occurrences on theos type switches have been reported as dPIS-2-2-119D on 9/7/ 7 3, 50-277-74-28, 50-277-74-48, and 50-278-74-20.

Very truly yours, WYW W. T. Ullrich, Superintendent Pach Bottom Atomic Power Station 8401230298 741205 i

PDR ADOCK 05000278 S

pop u v&h -:.jpR f- %.6 9 h., +.f;; "ky6. : p * ; _s v.

.% ;.' ; %:;Y.+li + (Ngv

?.h.h)

.f h

$? k.h'

.h.

h.

y 6:: f;. O q 3. m A. y. J e 9 7 y. l ? ; s.. '- & :.d;.9 :~: