JMOSS D M P,N I; II EC.fJ
&, N o,% 0*WX* W *
[
i-PIIIL/.DELPr!IA ELECTRIC CDMPMa*
i; Peach Botton Atomic Fover Station 1(
Delta. Pennsylvania L i 17314 Deccabor 19, 1974 f?
s j
Mr. James P. O'Reilly, Director b
17nited States Atomic Encrgy Cor=ission Directorate of Regulatory Opetations j
631 Park Avenue j
King of Prusela, Pennoylvania 19406 p
- i. i:
Subject:
Abnormal Occu-rence 24 '{our_ No,t,1,flyjttlan
- y Contirming R. S. Fletschmann's phene convere:ation with Mr. Walt 11aunack, H
A.E.C. Region 1 Regulatory Operationo Office on December 19, 1974.
Q s-
Reference:
License Number DPR-36 Technical Specification
Reference:
3.5.C g
[
Report No.:
50-270-74-18
,k/
'#21 I
i
[.I[
[
Report Date:
December 19. L974 j
occurrence Date:
December it!,1974 1
O.
A
?
Facility:
Pench Botton Aconic Power Station fd 6-
'O, f
R.D. 1 Delta, Pennnylvanin 17314 r\\.^
?
f-
\\(.\\
.t s -
A-r identif hat 101 of Occurrence:
0
.Y' Manual isolat ion valve f rem the "B" Core Spray Dischargo !!mtder tic "[ II N the " Stay Full" system accuculator was found cloacd; this valve o
f should be open.
-l i
Condittens Petce to Occurrence:
y Unit 3 at approximately 7L* power.
p Description of Occurrence:
4 lihile conducting ST 1.5, the "B" Core Spray Logie System Funct tenni Surve tLLance Tent,- it was nnt posn tbic to pressur t:c between MOV-3-l'+-110 j
and MOV-3-L4-L2B to s troke the.later valve.
Investigaticu determined
{
that the ntay full systen vont solenold, SV-5224, uhteh opens on low g
level, v.as open.
Further investigation found that the "S:ay Full"
(
accumulo'.or vau volved out of acrv tec.
The " Core Spray Line Vent
]
.Accvaulater Lew Level" alarm was alno found to bn inoperrible.
i
~
V Designatton of Apparent Cnuae of Occurrence:
)
Because the last checkoff lint shown that the valve waa open,*4 and becuuno the innt Lab calibration on this ' accumulator van prior to the l
checkof f lies t, the reason for the vntve being closed in unknown and is bein6 investigated.
8401230206 741
~ >
gDRADOCM03000 8
Analysis of Occurrence:
TOR l
'The fact that thin valve una cloned - has, very lit t'le safety tmpt tent ton becnune the synten in prenurited continuouniy by the condensate _
l tranefer systen?
'a1 ion the pyntes van returned to service it van judged j
A j
l that. the pipin:;; system vaa full except for. t he accumulator.
%pyg I
z A
-w
~.
n
(
)
3 Corrective Action:
The Unit 3 Coro Spray System Volve check-off Lint una redone; no othe.c valvits wer i found to be "off-nortwl".
The " Stay Full" synten valving on both Unit 2 nnd UnLt 3 PJIR and Core Speny syntoms were verified to be aligned properly.
The icvel annunciator ratcranwltch which failud to alam the low icvel vill be repaire d.
Fa11urc Dnta:
None previoun on the " Stay Tull"nyntem.
(
\\
Very truly youro,
.-r
/ '-h Plc
. a../d' -
w.
W. T. Ullrich, Super totondent Peach 13otton Atomic Power Station i