o EDWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION (Continued)
ACTION:
(Continued) d, With the QUADRANT POWER TILT determined to exceed the Maximum Limit specified in the CORE OPERATING LIMITS REPORT, reduce THERMAL POWER 10 115% of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
I e.
.The provisions of Specification 3.0.4 are not applicable.
l SURVEll, LANCE RE0VIREMENTS 4.2.4 The QUADRANT POWER TILT shall be determined to be s the steady state limits specified in the CORE OPERATING LIMITS REPORT at least once every 7 days i
during operation above 15% of RATED THERMAL POWER except when tha QUADRANT POWER TILT monitor is inoperable, ti.en the QUADRANT POWER TILT shall be calculated at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
l 4
l l
i i
l i
CRYSTAL RIVER - UNIT 3 3/4 2-10 Amendment No.