ML20086H908

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Section 3/4 2-10 Re Quadrant Power Tilt
ML20086H908
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/05/1991
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20086H907 List:
References
NUDOCS 9112100155
Download: ML20086H908 (1)


Text

-

o EDWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION (Continued)

ACTION:

(Continued) d, With the QUADRANT POWER TILT determined to exceed the Maximum Limit specified in the CORE OPERATING LIMITS REPORT, reduce THERMAL POWER 10 115% of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

I e.

.The provisions of Specification 3.0.4 are not applicable.

l SURVEll, LANCE RE0VIREMENTS 4.2.4 The QUADRANT POWER TILT shall be determined to be s the steady state limits specified in the CORE OPERATING LIMITS REPORT at least once every 7 days i

during operation above 15% of RATED THERMAL POWER except when tha QUADRANT POWER TILT monitor is inoperable, ti.en the QUADRANT POWER TILT shall be calculated at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l 4

l l

i i

l i

CRYSTAL RIVER - UNIT 3 3/4 2-10 Amendment No.

oli 100:55 911205

.PDR ADCCK 05000302 p

PDn I