Forwards Rev 17 to Unit 1 Pump & Valve Inservice Testing Program & Rev 13 to Unit 2 Pump & Valve Inservice Testing Program, Consisting of Relief Request 91-03
ML20086H649
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 12/02/1991
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086H651 List:
References
NUDOCS 9112090273
Download: ML20086H649 (7)


Text

__-_____ _ - __ _ _ - - _ _ _ _ _ _ _ _ _ _

11 I tw n.uro ccmray 1eumm M1 Guve % le av Cr rr r ctan (!*partmad i n t In ud, *,t llltU nam itin 10uliMGVl4) (Iv4H i 4 W =

nwauna se:w:s nu 1:.~1,c ; i vno g*:%

Q .

DUKCPOWCH December 2, 1991 U. S. Nuclear Regulatory Commission ATT!J: Document Control Desk Washington, D. C. 20555 Subject McGuiro Nuclear Station Dcchet Hos. 50-369 and 50-370 Pump and Valvo Inservico Testing Program Program revision 17 (Unit 1) and Revision 13 (unit 2)

[ Relief Request 110. 91-03]

Gentlement Pursuant to 10 CFR 50.55a(g)5, please find enclosed for NRC staff review, a copy of Revision 17 (Unit 1) and Revision 13 (Unit 2) to the McGuiro Nuclear Station Pump and Valvo (IWP/IWV) Inservice Testing Program (IST).

These revisions to the IST program are the result of enhancements identified by the McGuiro Design Study MGDS-0106, recently issued Design Basis Documents (DBD), recent station modif1 cations and to address issues raised within the NRC Saiety Evaluation Report (SER) issued September 12, 1991 for the McGuire Units 1 and 2 IST Program Rollef Roquests - Revision 16 (Unit 1) and Ravision 12 (Unit 2). A summary of the changes provided by those revisions are discussed in attachment 1.

Expeditious NRC review and approval of two relief requests provided by this submittal is requested by January 6, 1992. The two rollef requests requiring prompt staff action are:

1) RR-CA1; Valves 1,2CA-165,166
2) RR-NS3; Valves INS-83 through -88 and 2NS-110 through 115 For the other items provided by this submittal, it is requested that the NRC review and approval be provided by March 1, 1992, since the revisions include relief requests which are outside the scope of Generic Letter 89-04.

+m- mm- _ . FDn

%4, ,

\

w ,s en.

l Document Control Desk {

December 2, 1991 4 Page 2 '

If you have any questions regarding the enclosed material, ploose t contact P. F. Guill of my staff at (704) 373-2844.

Very truly yours, r ,

f T. C. McMookin, Vico Prosident McGuire Nucioar Generating Department pfg/ist16-12.nre xc (with attachments / enclosures)

Mr. S. D. Ebnter Regional Administrator, Region II Mr. T. A. Rood ONRR Mr. P. K. Van Dooran McGuire Senior Resident Inspector l

Mr. C. R. Ransom

- EG&G Idaho, Inc

- Idaho Nstional Engineering Laboratory

! 1520 Sawtello Street Idaho Falls, Idaho 83402 (CN12) l l

l l

l-l l

l 1

  • -, , w e g, ,. .re-, +- ---.,.-p-ryv- ,eme -nr~,,--,w.y--=v.r-,-,-,.---c,-m..-ny,,w,$ ,,,.-rw,,,,.-- ,3,--,--v-w-,.,,cv----w-,.-r--- ..ve-y-ww-, w--ww-,

t Document Control Desk '

December 2, 1991 i Pago 3 P

h bec (with attachments /enclosuros)

P. F. Guill R. O. Sharpo J. G. lief f ner D. W. Gwyn-M.-K. Nazor W. E. Galbroath -

R. W.-Revels R. L. Gill, Jr.

Coporato Records File: MC-801.01  :

P h

i f

t 1

i f

l l:.

I i-l l

l I i

,-,- . . - , , , . . _ . . . . . _ . _ , _ - , , . ~ - - _ _ . _ . . - . _ , _ . - , _ . . - - - - - . . . - , _ . - . . . . , . , _ . . . . . - . -

l ATTACllMENT 1 McGUIRE UNITS 1 AND 2 IWV AND IWP PROGRAM REVISIONS Holos kovisions are for both unite unless indicated otherwise.

1. Table of Contents a) Added Dienel Lube Oil (LD) System b) Changed page numbers appropriately
2. Section 1.4 Specific Rollei Requesta (IWP Section )

a) Relief Request F: Updated dates to reflect modificatioon schedule.

3. Section 11.4 Data Sheets a) IA-5'50, IA-5270, IA-5280, IA-5290, IA-5300, IA-5310, IA-Sa.), IA-5330 Valveo identified in the program. Identified during drawing review. Valves were already in the testing procedures, but not individually listed in the testing program. These valves provido check function for the airlock door tanks and are leak tested with the door seal leak test.

b) IA-5360, IA5370, IA53BO, IA5390 Deleted relief request IA-1. Testing method modified to allow testing chock valves individually, c) KC-0897, KC-0903, KC-0958 (Unit 2 only)

Valves added to the program. Identified by Design Study MGDS-0106.

d) LD-0108, LD-0113 New valvoo added to the program. NSM MG1-2154 and MG2-2154 installed these valves.

e) NS-0083, NS-0084, NS-0085, NS-0086, NS-0087, NS-0088 (UNIT 1)

NS-0110, NS-0111, NS-0112, NS-0113, HS-0114, NS-0116 (UNIT 2)

Valves added to the program. Identified by NS system design bases document.

f) NV-0261, NV-0263 Valveo added to the program. Identified by the NV system deoign basou document.

g) HV-0204 Added Movement Test Closed to valve. Identified by Design Study MGDS-0106.

h) RN-0994, RN-1006 New valves added to the program. Modificatione NSM MG1-1887 and MG2-0006 installed these valven.

1) RV-0126, RV-0130 (Unit 1 only)

Deleted valves from program. NSM MG1-2247 removed thene valves, j) RV-044$, RV-0446 (tInit 1 only)

New valves added to the program. Modification NSM MGl-2247 installed these valves.

k) SA-0005, SA-0006 Re-activated relief requent RR-sal. As identified in ravision 14 to the IST Manual, the method of quarterly testing those valvou did not verify proper closure. Valves were novec taken out of the sample disassembly program, and the open vorification tests were not changed. During Unit 1 EOC7, dinascembly of 1SA-0005 revealed a cracked seat, and the valvo was replaced. ISA-0006 was also disassembled as required by the relief request. The methed of testing identified in reviolon 14 would not have indicated a cracked coat. As a result of this work, modifications to the piping syotem have been written.

1) VI-0372, VI-0374 Valvos added to the program. Identified by Generic Letter 90-06. These valves serve as class boundary breaks between the VI system and the Nitrogen overpressure on the accumulatore.

m) VI-0368, VI-0373 Valven added to the program. Identified by Generic Letter 90-06. These valves serve to check air flow from VI into the accumulators. They must open to allow Nitrogen supply to the PORVa.

i n) VI-0135, VI-0136, VI-0137, VI-0138, VI-0139, VI-0140, VI-0141, VI-0142 (Unit 1 only)

Deleted valveo from program. Thepo valves serve to check instrument air from the main steani isolation valve accumulator tank. In the NRC Safety Evaluation for Program revision 16, it was identified that a means to test the valves individually uhould be developed. Testing results during Unit 1 EOC7 outago indicated that the MSIVs are capable of closing within the curront Tech Spec limit of $ seconds without the air aseist feature. Since part of this air asuist was not selomically qualified, it was decided to eliminate this feature and thereby eliminate the need to test these VI valves.

Refer to MEVN-2985 for change. A revision to increase the Toch Spee closure tine f or the MSIVs is being submitted. At the start of Unit 2 EOC7 outage, similar testing of the MSIVs wirl be done and it is anticipated that the air assist feature of those valves will be deleted.

o) YC-0016A, YC-0017D, YC-0027B, YC-0029A, YC-0030A, YC-0040B, YC-0099B (Unit 1 only)

Deleted valveo from the program. Modification NSM MG5-2065 eliminated the electric operation of these valves.

4.Section II.5 General Relief Requests
4) General Relief (IV)

New general relief request. Relief is being requested for Electric Motor Operated (EMO) valves which do not have an automatic actuation in one or both directions but still serve a safety function in that direction (s). Licensee requests to otroke time and trend the valve in the direction of automatic actuation but only verify proper operation in the other direction. Recent Design Bason Documente are identifying EMOs which fall into this category, respond to an automatic uignal in one direction but require operator action to reposition valve.

5.Section II.6 Specific Relief Requests a) RR-CA1 Modified relief request as requested per NRC Safety Evaluation to Program Revision 16. Indicated the open and close function of these valves.

1 i

b) RH-lh1 Duleted relief request from program. Test method modific. to teot valvou individually.

c) RR-NS3 How roliot roquent added as a result of adding valvos to program, d) RR-RV1 Deleted relief request. Valvon removed by modification NSM M01-2247. Unit 1 only.

e) RR-SA1 Ro-activated this rollef request. Alternate tuoting methods did not verify proper cloouro. See Data Sheet sect. ion f or description.

f) RR-VI3 Deleted relief requent Unit 1 only. Air assist feature of the MSIVs wan deleted by modification MEVN-2985. See Data shout section for deceription.

6.Section II.7 Cold Shutdown Justifications.

a) CS-NV11 Modiflod justification to add clocure testing to valve.

b) CS-NV17 Now chutdown justification for NV-261, NV-263. These valves were added to the program by the NV system Design Bases Document, c) CS-VII New shutdown justification for VI-368, VI-372, VI-373, I-374. Valves are tested with the stroke timing of the PORVs using Nitrogen pressure. Reference CS-NC1 for PORV justification.

. . . .