ML20086H343

From kanterella
Jump to navigation Jump to search
AO 50-271/72-05:on 720921,supply Valve to Offgas Sample Chamber Found Closed.Offgas Activity Measured at 5 Mrm/Hr & Grab Sample of Air Ejectors Showed 145 Uci/S.Review Being Conducted
ML20086H343
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/22/1972
From: Rosalyn Jones
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H319 List:
References
AO-50-271-72-05, AO-50-271-72-5, VYV-2253, NUDOCS 8401170031
Download: ML20086H343 (1)


Text

1

'- :. Q. L t+. M

. y l ;r. [. & p./.-T W.: M N h 5 3 f."; k W X ';).' L 1 e L--

. Tl Q

l

?..

n vi

'.,c VICRMONT YANKEIC NUCLEAR POWICR CORPOR ATION

{

SEVENTY GCVCN Uff 0VC STftCCT i

a RUTLAND,Vimb10NT 03701 1

VYV-2253 y

P.O.DOX 157 VERNON. VERMONT 05354

-. m Septeuber 22, 1972

.n United States Atomic Energy Cot =nission Directorate of Regulatory Operations, Region I 970 Broad St reet Newark, New Jersey 07102 REFERENCB : Operating License DPR-28 Docket No. 50-271 Abnormal Occurrence No. AO-72-05 Gentlemen:

An defined by Technical Specifications for the Vermont Yankee i

Nuclear Power Station, Section 6. 7. A.c, we are reporting the following Abnormal Occurrence as 40-72-05 and confirming our telephone conversation with your off ice on this date.

~

=

During the af ternoon of September 21 with the reactor operating at approximately 151 power, the supply valve to the Off-Cas Sample Char:bar

[

was f ound to be c!nced.

This prevented monitoring of the air ejector off-gau and constituted a violation of Technical Specifications, Section 3.8.A.1.

After discovery of the mis-pooitioned valve, it was-opened immediately and a tmnaurement was made using the installed cystem which ' indicated an

_I of f -ga.9 nctivity of 5 mr/hr. Additionally, a grab sample was taken which showed 145 yc/nec at the air ejectoro. The flow at that time was 15 cfm corresponding to a hold-up time of 300 minutes.

The stack monitor during thin period indicated essentially at background.

i The of f-gan monitoring nystem is currently operable in accordance with Technical Specif ications.

A review of this incident is beirg conducted.

Very truly yours, EM 01 1 / OO31 721101 rTI< ADOCK 05000271 VERMONT YANKEE NUCLEAR POWER CORPORATION PDR

~ /

~-

i f

p. L-,

RobertF.J[nes Plont Supd iutcadent 2

~

DWE/kbd E

... _...