Interim Deficiency Rept Re Reactor Coolant Pumps 11,12,13 & 14 Connection to Reactor Coolant Piping.Pump Mountings Created Mismatch Between Pump Discharge Nozzles & Reactor Coolant Cold Leg Piping
ML20086C598
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/29/1973
From: Betz J
Public Service Enterprise Group
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086C587 List:
References
NUDOCS 8311290022
Download: ML20086C598 (2)


Text

._ .- . .- -- - .

., e '

O O

~ ,

J d

a John F. Betz Pubhc Service Electric and Gas Company 80 Park Place Newark, N.J 07101 201/622 7000 '

vice President in Charge of Electnc Operation -

May 29, 1973

! U.S. Atomic Energy Commission Director of Regulatory Operations 7920 Norfolk Avenue Bethesda, Maryland 20014 Attention of Mr. Frank E. Kruesi.

, Director Gentlemen: '

NO. 11, 12, 13 AND 14 REACTOR COOLANT PUMPS MODIFICATION TO VOLUTE N0ZZLES i SALEM NUCLEAR GENERATING STATION I

No. 11, 12, 13 and 14 Reactor Coolant Pumps could rot be connected to the reactor coolant piping because embedded '

pump mountings created a mismatch between the pump discharge nozzles and reactor coolant coldrleg piping. The volutes were ,

returned to Westinghouse, Tampa Division where the nozzles were built up in accordance with field measurements to permit an accurate fit-up. This work was not reported at the time ~

and during' subsequent discussions with.~the Directorate of -

Regulatory Operations, Region,1, Jit:was agreed to report. this item to complete the recordT g. ^

+

3 _

The procedure followed was to modi'fy the pu'up support::

for alignment in accordance with approved-Electric Engingering '

Department drawings. Each pump was.placed-on its support, making adjustments to foot seating areas.as necessary.to provide forfproper .

seating and: thermal expansion.- With t'ae pumps firmly mounted, accurate measurements were taken to ' determine- the amount of.

^

weld build-up that would be required to obt.ain; proper; fit-up to the reactor coolant. cold leg piping. The volutes were-then

' shipped to Westinghouse, Tampa Division for modification.

Weld and NDT proc.edure s , qualifications of operators-and procedures used .by Westinghouse .-were reviewed and ap' proved by PSE&G. Quality Assurance surveillance 6fathe work.at Westinghouse', -

Tampa Division was followed continuously..by PSE&G Quality Assurance Engineers and/or'QA Engineers \from Southwest-Research _

' Institute. Representatives cof _ the PSE&G Electric Engineering -

. Department performed frequent inspections ofLthe welding activities.

'y 5,

]Wmyagg, PDR- B aJy'v y ~

, gg ,

s a ,

J ...I s' s

p' , f- ,

U t;

~

< b . 'S . Atomic Energy 5 73 Commission All modifications to these volutes have been com-pleted snd the four volutes have been returned to the Salem plent s f.te . The records of this work, audits, etc., are available for your review at the Salem site.

If you have further questions, we will be pleased to discuss them with you.