Proposed Tech Specs Re 4 Kv Loss of Voltage & Degraded Voltage Conditions Tables 3.3-3,3.3-4,3.3.5 & 4.3-2
ML20086B075
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/14/1995
From:
DUKE POWER CO.
To:
Shared Package
ML20086B035 List:
References
NUDOCS 9507050153
Download: ML20086B075 (8)


Text

. +

is u.

4 9

4 4

e 4

b i

+

ATTACHMENT 2 UP-TO-DATE PROPOSED TS PAGES f

3 9507050153 950614 PDR ADOCK 05000369 P

PDR

_n y e, co TABLE 3.3-3 (Centinued)

]

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM-INSTRUMENTATION E..

~

E MINIMUM E

TOTAL NO.

CilANNELS CHANNELS APPLICABLE Z

FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION m

[

7.

Auxiliary Feedwater (continued) 2 f.

Station Blackout (Note 1)

Start Motor-Driven Pumps and Turbine-Driven Pump #

3/ Bus 2/ Bus 2/ Bus-1,2,3 19 l

6 s$g Either Bus f3/Ar

[.h g,,,.

O' Fe dw ter Pu Start Motor-4 Driven Pumps 2-1/MFWP 2-1/MFWP 2-1/MFWP 1, 2 27 s

T 8.

' Automatic Switchover to N

Recirculation RWST Level

-3 2

2 1,2,3 15 9.

Loss of Power Lur o/Vo 4-kVE::r;ncy&c S

3/ Bus 2/ Bus 2/ Bus' 1, 2, 3, 4 15a e

'Jr.dervaltoge G.-id FE Cagraded "cita a 1-kV 1%y-4) ?4/Q 5/Ber

.7/ Bas A/$nt I, L, 5 aW

/51 88 6.

1 e e 10.

Engineered Safety Features

@8 Actuation System Interlocks ee 22 a.

Pressurjzer Pressure, 3

2 2

1,2,3 20

?

P-11 m %m b.

Low-Low Tavg, P-12 4

2 3

1,2,3 20

((

c.

Reactor Trip, P-4 2

2 2

1,2,3 22 d.

Steam Generator 3/stm gen.

2/stm gen.

2/stm gen. 1, 2, 3 20 SC Level, P-14 in any in each operating operating stm gen.

stm gen.

^

p.

^

9 u

m m

.,,-o w.,.

.4 w

.4-TABLE 3.3-4 (Crntinued) 2 n

O5 ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS' 5

h FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES, z

d 7.

Auxiliary Feedwater a.

Manual Initiation N.A.

N.A.

g b.

. Automatic Actuation Logic N.A.

N.A.

and Actuation Relays m

I c.

Steam Generator Water Level--Low-Low 1)

Start Motor-Driven Pumps 2 12% of span from 0 to 1 11% of span from 0 to 30% of RATED THERMAL POWER, 30% of RATED THERMAL POWER, increasing linearly to increasing linearly to 140.0% of span at 100%-

1 39.0% of span at 100%

w}

of RATED THERMAL POWER.

of RATED THERMAL POWER.

Ty 2)

Start Turbine-Driven Pumps 12% of span from 0 to 2 11% of span from 0 to 30% of RATED THERMAL POWER, 30% of RATED THERMAL POWER, increasing Jinearly to increasing linearly to 1 40.0% of span at 100%

139.0% of span at 100%

of RATED THERMAL ~ POWER.

of RATED THERMAL POWER.

d.

Auxiliary Feedwater 1 2 psig 1 1 psig gk Suction Pressure - Low gg (Suction Supply Automatic gg Realignment) 55 e.

Safety Injection -

See Item 1. above for all Safety Injection Trip Setpoints yp Start Motor-Driven Pumps and Allowable Values f.

Station Blackout - Start 215" o 173 : lt: with :

L 3200 ;;1t:

Motor-Driven Pumps and 0.5 i 0.5 cecend tf e No gg Turbine-Driven Pump d !:y S. S.

s (Note.1)

[

g.

Trip of Main Feedwater Pumps -

N.A.

N.A.

Start Motor-Driven Pumps vv f

u See. Jund A cu med yye _m m

r' a

W, l

y h h,-

Unit 1 i) 4 kV Loss of Volcage 3174 45 volts with a 8.5 1 0.5 2 3122 voJts second time delay 2)4 kV Degraded Voltage 2 3678.5 volts with 5 11 second 2 3661 volts with SI and s 600 second without SI time delays Unit 2 i')4 kV Loss of Voltage 3157 A 45 volts with a 8.5 0.5 2 3108 volts second time delay 2-) 4 kV Degraded Voltage 2 3703 volts with 5 11 second 2 3685.5 volts with SI and 5 600 second without SI time delays L

h f

..... ~.

4x

. 7 4

f

-'I 5,,

g TABLE 3.3-4 (Ccntinued) c,.

C ENGINEERED Sjfjmf FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS-m h FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES a

g 8.

Automatic Switchover to Recirculation w

RWST Level 1 90 inches 1 80 inches E

9.

Loss of Power y

h 7pfer[8) - 0 k'/ Emcr;;ncy "":

'J ~* -"?:l t ; -

MCO i 173 ;;lt: Jith :

1 3200 J:It; g.f-g,

--C.-id 0:gaded V:lt:;

y 0.5 _:::nd tin 10.

Engineered Safety Features Actuation System Interlocks w1 a.

Pressurizer Pressure, P-11

$ 1955 psig 5 1965_psig b.

Tavg, P-12

-> 553'F

> 551*F c.

Reactor Trip, P-4 H.A.

N.A.

d.

Steam Generator Level, P-14 See Item 5. above for all Trip Setpoints and Allowable Values.

[ [ Note 1: The turbine driven pump will not start on a blackout signal coincident with a safety. injection signal.

sa

<D to e t+

??

22 S. S.

ee i

NH vv l

1

~

}MW W

Unit 1 g.

4 kV Loss of Voltage 3174 45 volts with a 8.5 0.5 2 3122 volts second time delay

1. 4 kV Degraded Voltage 2 3678.5 volts with 5 11 second i 3661 volts with SI and s 600 second without SI time delays Unit 2 4 kV Loss of Voltage 3157 45 volts with a 8.5 0.5 2 3108 volts second time delay b, 4 kV Degraded Voltage 2 3703 volts with 5 11 second 2 3685.5 volts with SI and s 600 second without SI time delays

y_

{

a.

q. ; '.. * -

4 :.

l TABLE'3.3-S'(Continued)

L ENGINEEREO SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL'AND FUNCTION RESPONSE TIME IN SECONDS-7.

Steam Generator Water Level Lowlow a.

Motor-driven Auxiliary Feedwater Pumps

< 60 b.

Turbine-driven Auxiliary Feedwater Pumps 5 60 1

- 8.

Negative Steam Line Pressure Rate - High l

~

t Steam Line Isolation 5 10 9.

Start Permissive Containment Pressure Control System N.A.

l 10.

Termination Containment Pressure Control System N.A.

t 11.

Auxiliary Feedwater Suction Pressure - Low Auxiliary Feedwater Pumps (Suction i

Supply Automatic Realignment)

_ 13 12.

RWST Level Automatic Switchover to Recirculation

< 60-

'{

13.

Station Blackout a.

Start Motor-Driven Auxiliary Feedwater Pumps

< 60 b.

Start Turbine-Driven Auxiliary Feedwater Pump (6)

$ 60 14.

Trip of Main Feedwater Pumps Start Motor-Driven Auxiliary Feedwater Pumps 5 60 e

15.

Loss of Power

' PY Sergency But l'ndervel ta ge-5 11 Crid Degraded Voltage i

4 kV Lou d Valf e a.

z,,

h. 4 kV b rded Vol e

i 9

z ;a w;g g.,,,,,

4 Goo a:% & S 1 l

/

t McGUIRE - UNITS 1 AND 2 3/4 3-32 Amendment No.

(Unit 1)

Amendment No.1 2 (Unit 2)

E

~

TABLE 4.3-2 (Cintinued)-

I

_x-ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ~

N

~

7y SURVEILLANCE REQUIREMENTS

~

5

- TRIP e

ANALOG ACTUATING MODES ~

c CHANNEL

' DEVICE MASTER ~ SLAVE - ' FOR *'HICH' 3

CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION RELAY RELAY -SU8vEILLANCE' d

FUNCTIONAL UNIT CHECK CALIBRATION TEST TEST

]

7. Auxiliary Feedwater LOGIC TEST TEST TEST IS' REQUIRED" E

a.

Manual Initiation N.A.

N.A.

N.A.

R N.A.

N. A'.

N.A.

'1, 2,I3 b.

Automatic Actuation N.A.

N.A.

N.A.

H. A.

M(1)

M(1)'

Q l1, 2, 3.

Logic and Actuation

' Relays c.- Steam Generator Water S R

M N.A.

N.A.

N.A-N.A.

. 1,2,$3; Level--Low-Low t.2 d.

Auxiliary Feedwater N.A.

R N.A.

R N.A.

N.A.

N.A.

-1, 2. 31 1

Suction Pressure-Low Y

e.

Safety Injection See Item 1. above for all Safety Injection Surveillance Requi_rements f.

Station Blackout N.A.

N.A.

N.A R

N.A.

N.A.

N.A.

1, 2, g.

Trip of Main Feedwater N. A.

N.A.

N.A.

R N.A.

N.A.

N.A 1, 2 Pumps

8. Automatic Switchover to yg Recirculation RSWT Level S

R M

N. A.

N.A.

- N.A.

N.A.

1,2,3 aa

!8

9. Loss of Power 4 kV ).::ew of W Nr; =j ";;$t

=*

N.A.

R N. A.

M N.A.

N.A.

N.A' 1, 2, 3, 4 '

<t.

E_&

"..d:rt:? t2;:-CrM

~~

C:gr:d:d Y:1t:;:

h, 4 /cV nelel N b e N A NA.

M W. k.

N.A.

WA.

I, 2, 3 i f.

j i

OC L

4 9

-e.ne-

--n,,----s-w~,

- - - - - -