ML20085D102

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1991 for Point Beach Nuclear Plant,Unit 2
ML20085D102
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/31/1991
From: Peterson D
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20085D094 List:
References
NUDOCS 9110150240
Download: ML20085D102 (1)


Text

. _ _ _.

POINT BEACH NUCLEAR PLANT Docket No.

9)-301 Unit Name Point Beach. Unit 2 UNIT SilCTDOWNS AND POWER REDt'CTIONS Date October 3. P?>l o

Completed By D C. Peterson REPORT NiONTH AUGUST - 1?>I Telephone No.

414R552321. Ext M1 htho3 of Shuttmg 2

W.

Date Tme' Duratm Reaum Ihn lacensee Isrnt System Compm: t Caase and Cerrectm Actm 3

f fimni Recor Rewm W G.xte' Cd Te Iht Reevmt ce t

910923 S

79 C

1 Scheduled refwimg and numtenance cwtage. (*2Rt7. Wja wortt riems include mspectm and e&*y current testmg of steam g-nerators ir.sta3atre of full flow test haes for rmdual heat remwal. safety myectm and creta:nment spray pe;u, and increase of the steam <frrven suutta-v feedwater pump mim-recrculata line.

-siW, f: I orced

" Reason:

'N1cthod-

' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Nianual for preparation cf B - N1aintenance or Testing 2 - Nf anual Scram data entry sheets C - Refueling 3 - Automatic Scram LER Tde (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Predeus Shutdown Licensing Exam 5 - Reduced lead F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain)

H - Other (cxplain)

Par.co2st, 9110150240 91i T (o_tvra FOR ADOCK 05000266 R

ppp