Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
! ! i \ J ;J IIi l flj)l l l
a S 2729 04737
. . N E O V 51 22790911 431
. .S I 1 65234 47 8877 T
. .AE A 2,2,6 3,8 0,5,8 L
. .R U 31 85 8
4 29 4 5 A E M 1 1 1 5, n, 7,
. .V U I C 7 06
. .G 076 7 2 7
. . , 9 n
o s
1 2
. .TR O 1
r 3 . .P 2 e 2 E N 2 t - . .R 6060 77884 W e 5 E O R P 5 . . T T 13 0804 0922 200 : D E 1 7 S A 59 1 5 63 8888 ) T B 9 . / . . A D 54, 4, 3, 1, 8, H J i z
9 C 4 L .
C W r.
A S a 6 1 1 . . O 65 5 571 -
6 . 4 E T 353 E r 2 , D . . C 1
, 7, 6, T E
- 3 N R F O S 0 . . I E Y 822 O N 5 r Y E S L D -
e B N . . B !
E -
. b O ) A O : T O o u. H . . 7 C I P A N t r. P I T U D c A E . . H L A T T O t. L G P 0000 R R R E
K E L
P E
T
. . U O
P A
H T 000002030097OD 00620.U A T da C T M 5 .R N 22 2 5 04 0099 S O A O c H T O 7 7 7 9,9,6,1 1 D s D D C . . .
T O M N F L v N 4 37 A O
.N . 3 S 8 64 C E I 0, 3 3 , E R
. . . . . . . . R : L H E T N E } B T 1 T A B EA A D N M WC D I
. U MI D 1 9 N L , E _
0 . TP E T m T 55 S EP P A i I 8 M NA Y M N . 4E ( T I h U 7 : T T { T U 9 ) I YO ) S Q 4 E : ( NN H S E E T
N 58 W)
MES A
L )
W)
MH ) )
H T ,
R A 83 : WG F : A TT N D S L 1 2 ) SMN I ) .
C H(
W 91 EE O O A T P 55ES I Y I MD( NN M I R 1 1 WOTT ,N T ( E R D O R9 MREA DA I TD CR 6 E E P A9 GNR E RS DAE DE P T E E1 : : T( ( TF CR ERT MD T A R L ) ) E Y CI U TEA I T L CRTENYYT I ( .S O SANR GG E R U A UEWW( TTI R AH RREE NN N O C T NBMM I I C T , DW UEGN I I P L A M( GCCA SS O N ON E RSS R E A D HE SNAAP EN I RWEHEYG OUUEE P C CTRSI PPA RO ROON GG T( ( TV G APEOTAAC I ETDI N RY C AO F S N .EEWRACC HT PCTLWYEG ARRR O R I BSOGR~ NECC AJ OGNRRFOO D O T
A T:
P(
LLL EEI LI I BHR GEWNDREEO NRSOTE NTYCCGL TTEE D N
T C
R NDLGABBRAWT I UNLECTAAAU. E A E I OANCAA*T C S TSERHEA AI FFTD F P OI MII DDCI OE RRVOS CLFL UE T O PRRTRNNCLTR OURT LI A I YYOH A D S EEATEEOP POEAEARCEBTT C N A
U PHRCP P PLR EHSRVMTI CAI I DSE N T : T EEESAEO R EERRCRI LCCE N W A EG ELDDE VF FRNEEETVI AACSO O D T MNDTE GTE NO ESHLCRAPPRNN D E S AI EA MMNOLS I RGETEEEVAAOW T T
.NTS LNUUAN N RO R LSACCFO U R G RNPGMMH RO SE TS SSE D H O N TOEEI I I C E S RBCRTS S TTTTTT S P I I PCMSXX WA UMAUI OOTI I I I I U E T NEI AEAAF OE OUEONRRENNNNNH F R A URLNDMMI PR HNRHUGGNUUUUUS I R A E . . . . . . . . . . . . . . . . . . . . . . . . T P l234S678 90 1234 567 8901 234 5 A N 1 11 1 11 1 1 1 1 22222 2 D Q M S g 6 MW $ {] > "
7) il i l I !
1
~
POINT BEACil NUCLEAR PIANT - DOCKET NO. 3)-2M -
- 'J AVERAGE D AILY UNIT ITMVER LEVEL UNIT NAME Point Beach. Uniti MONTH SEITEMBER - 1991 DATE October 3.1Mi .
COMPLETED BY D. C. Petenen TELEPilONE 414n5SK1 3
AVERAGE AVERAGE AVERAGE 4
DAILY DAILY DAILY t POWER. LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET ,
i, i 1 442 11 49 21 47R ,
i 2 485 12 4'W 22 477
.l 3 4W 13 187 23 4N ;
4 AS5 14 455 24 471 5 137 15 As3 25 478 i 6 493 16 49 ?h 478 i
a i 7 447 17 492 27 477- j 8 437 18 493 28 477 ;
1 4 L i 9 4W 19 493 29 4'N j
.; i i 10 494 20 AM 30 457-l 6 r
.d (03 "M)
i POINT BEACH NUCLEAR PLANT Dociet No. _J2XA .
Unit Name Peint Beacit tJnit 1 tiNIT SIIUTDOWNS AND POWER REDUCTIONS Date .. Octt+ct 3 WM -
~
. .l l
Completed By D. C. Petersen -
REPORT 510 NTH SEPTESTBER - 1991 Telephone No. 414n55-232L Ext _ _VI 1
Method of i
< Shuttag i Cause and Correctwe Actm Na Date Type Duratkm Reaum Dowit 1xensee Ewnt Sprem Cori pnnent 4
u 4
m I
. i
! 4 I
J
] )'
I 2
'F: Forced Reason: .
'Stethod: ' Exhibit G - Instructions i S: Scheduled A - Equipment Failure (explin) 1 - Stanual for preparation of B - 51aintenance or Testing 2 - Atanual Scram data entry sheets
. C - Refueling 3 - Automatic Scram LER file (NUREG-0161) j D - Regulatory Restriction 4 - Continuation of j E - Orcrator Tra:ning & Previous Shutdown 1 Liccasine Esan 5 - Reduced Lead F- Administrative 6 - Other (explain) ' Exhibit 1 - Same Source G - Operational Error (explain) 3 H - Other (explain) i g
j 4
(03-%)
s q- 4y 3,- ry , * -g - cr.-o -w- ~ y-+ - , . - - - - - ---,. - w. w,- -a---m-e w-
t DOCKET NO. 50-226 UNIT NAME Point Beach Unit 1 DATE October 4,1991 COMPLETED BY D. C. Peterson TELEPHONE 414/755-2321, Ext. 361 Unit 1 operated at approximately 483 MWe not throughout this report period with no significant load reductions.
During this period, Unit 1 experienced three reportable events in accordance with 10CFR50.73: LER 91-010, containment hydrogen monitors inoperable for greater than 30 days in violation of technical specifications LER 91-011, turbine runback due to nuclear power range instrument channel spike; and, LER 91-012, turbine runback caused by the loss of the yellow cha. nel instrument buses.
Safety-related maintenance included the following: installed a new mini-recirc line for the electric auxiliary feedwater pups ,
inspected and replaced solenoid valve spring in the electric auxiliary feedwater pump mini-recirc valve, charged one station battery cell, replaced seal to correct Jilnor oil leak on governor of the emergency diesel gwerator G01, replaced blown drive fuse on yellow channel inverter, replaced bellows in the safety injection pump discharge line flw L.tansmitter, replaced the service water supply piping to the glycol cooler on emergency diesel generator G01.
Oy -
. ~
S 576 2 57961 _
. . N E _
O V 05602801 6 '- 1 01
. . S I 061 008558888 .
A T 0,5,2 4,3 2,1,5, E A ,
P L 87 5 653 _
. . U 6 4 4 23 2 E M 1 1 1 9, 6, 3, .
. . V J .
I C 707
. . G 07 6 7 .
2 7
. . , 9 n T 1 _
o 1 .
t
. '- 1 s 2 O 9 ,
r 3 . . P 9 2 e 2 E 1 2 t - . . P 0000 99400 e 5 E , R 1 P d . . T T 1 1 01 090588080 8 E 9 7 A 58 8 7 9 89909 ) B .
9 . ./ . .
C #" D 5, 4, 4, 8, 8, 4, 1 H r _
1 C 4 %g C A
e b
M T
1 1 . ' . O 66 6 1 71 .
0 , .
4 E T 63 9 E m P r 3 3 D . . C 7,3,1, e E N R F v S 0 r . . I E Y 933 O o -
5 e Y E S L N D b B N . . B N E
. o O ) A O : T o t c u H . . 7 C I P A N r. P I T U D O A.
E . . H L A T ,
T P R R E.
K E L
P
. L E
T
. . U G
O P
A H
T 0000 000000060086OD 33650.UR A T
s A
- T M .S . R N 25 5 77 99988 S 4 O A O E H T O 7 6 6 2, 0, 3, D c .
D D C . T . T O M N F L O i
? 3 59 A O _
.N . 3 S 5 2 0 C E I 933 , E R
. . . . . . . . R : L H E T N E ) B T T A S EA A D N -
WC D M I
-_ . U MI D ,
2 9 N L , E 0 . TP E T T
I 55 S 8 M EP NA P
T A
M E
S N . 4 F ( T I E U 7 : T T ( T U
- 9) T TO ) S Q .
4E : l NN H S E E T
N 58 W) A W)
MH H
T R
MES L ) ) ) ,
A 83 : WG F : A H( W TT N D S L 1 2 ) SMN I) C W M EE '
O A T P 55 ES I Y I MD( NN M I R 1 1 WOTT , N T ( E R D CR E E
- O R9 MREA DA I TD 6 P A9 GNR E RS DAE DE P T ,
E E1 : : T( ( TF CR ERT MD T A R
A L
CRTENYYT
) )
UEWW( TTI E Y CI I (
R ,
SO AH U TEA SANR RRE E GG NN X
E N
T R
O L
U C
T NBMM T DW UEGN P L I I C I I A M( GCCA SS O N ON E RSS R E A D HE SNAAP EN I RWEHEYG OUUEE R C CTRSI PPA RO ROON GG T( ( TV .
G APEOTAAC I ETDI N RY C AO F S m N
I EEWRACC BSOGR NECC HT PCTLNYEG AU X GNRRFOO ARRR D
O R O
T P( EEI LI I GEHNI REEO TTEE D T
_ A T : LLL BHR NRSOTE NTYCCGL N C R NDLGABB. RAWT I UNLECTAAAU E A E I OANCAAUC S TSERHEA AI FFTD F #
P OI MI I D DCI OE RRVOS CLFL UE T ,,
O PRRTRNNCLTR OURT LI A I YYOH A D S ELATEEOP POEAEARCEBTT C N U PERCPP PLR EHSRVMTI CAI I DSE N A
- T : T EEESAEO R EERRCRI LCCE N W A EG ELDDE VF FRNE r ETVI AACSO O D T MNDTE GTE NO ESHLCRAPPRNN D E S AI EA MMNOLS I RGETEEEVAAOW T T
_ NTSLNUUAN N RO R LSACCFO U R G RNPGMMH RO SETS S SE D H O N TOEEI I I C ES RBCRTS S TTTTTT S P I I PCMSXX WA UMAUI O vTI I I I I U E
_ T NEI AEAAF OE O J' EONRRENNNNNH F R .
A URLNDMMI PR HNRHUGGNUUUUUS
- I R A
_ E . . . . . . . . . . . . . . . . . . . . . . . . . T
_ P 1 234 5678 90 1 23 4567 8901 2 3 4 5 A _
O 1 1 1 1 1 1 1 1 1 1 22222 2, D
- f!! l; !!fd1" ! llI 3 il 11l)1# ; l[1 ;j 1 i
- I:1
l- M POINT BEACII NUCLEAR PLANT DOCKET NO. S 301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. LMt 2 MONTil SEPTEMBER - 1991 DATE Ocickwer 3.1W1 4
COMPLETED BY D. C Petersen TELEPIIONE _4J4/7552321 l
1 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL l MWe NET DAY MWe NET DAY MWe NET i DAY 11 4M 21 473 1 492 133 22 470 2 4W 12 4R2 23 468 3 494 13 14 45 24 465 4 459 15 442 25 463 5 491
- 44) 16 490 26 4/4 6
492 27 JIM 7 491 17 18 470 25 -11 8 491 19 A 29 -14 9 405 20 475 30 -10 10 493 Pftr-crnsa (0190)
4 -
DOCKET No. 50-301 UNIT NAME Point Beach Unit 2 DATE October 3, 1991 COMPLETED BY D. C. Potorson TELEPil0NE 414/755-2321, Ext. 361 Unit 2 operated at approximately 430 Hwo not throughout this report period, completing 313 days of unintorrupted oporation with no significant power reductions. At 0158 on September 28, Unit 2 was taken off lino and at 0435 the reactor trip breakers were opened.
On September 29, with approximately 50 psi in the ntoam generators and the primary syston on residual heat removal, the main steam isolation valvos MS1Vs failed to close unassisted. An investigation is in progress.
Safety-related maintenanco included the following: Cleanod, reapplied scalout, and rocharged to 15 psi olectrical penetration E-5; replaced bellows in thr, safoty injection pump dischargo lino flow transmitter; and replaced service water supply piping to the glycol cooler on omorgency diosol generator G02.