ML20085D089

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Sept 1991 for Point Beach Nuclear Plant,Units 1 & 2 & Revised Rept for Aug 1991 for Unit 2
ML20085D089
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/07/1991
From: Zach Jk
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085D094 List:
References
CON-NRC-91-117 VPNPD-91-348, NUDOCS 9110150237
Download: ML20085D089 (1)


Text

._. _

Wisconsin Electnc POWER COMPAIN

.y w M.cwon eo wu aw. vwm ve3x1 Im!M N VPNPD-91-348 NRC-91-117 October 7, 1991 U. S.

NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.

C.

20555 centlemen:

i IRCEETs 50.1M_ Alm 50-3Q1 MONTitLY OPERATIllILJ1EM1TS POINT 11EACll NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of September 1991.

very truly yours,

)

?_

\\ up, ut/s)

Jamed J.

Zach l-l Vice President l

Nuclear Power l

I Attachments Copies to L.

L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector

[

pas noocg osooo m>

jr R

PDR

\\g i\\

J ubnk,9 dIlimwdainrm Geparkw

. -.