Telecopy Ao:Msiv 2-203-1A,B & C Exceeded Leak Rate Tech Spec Limits.Further Info to Be Provided in AO 50-265/74-32
ML20084U904
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 12/31/1974
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084U899 List:
References
NJK-74-445, NUDOCS 8306290366
Download: ML20084U904 (1)


Text

I i

1

(~~

Q C mmchaalth Edis:n

( ')

I [e s _,3 Post Off.ce Box 216

?

Quad Cib dencrat:ng Stat.on

~

% M.f/

Cordovc. llhnois 61242 p

Telephone 309/654-2241 y

W

/. dh NJ K-74-445 Telecopy:

Region lit, Attention:

Mr. C. Feierabend JAN6 Jg73,,,, y Li

/

December 31, 1974

?\\

/

hyt$.:E?L

,*.N

~

J. Keppler, Regional D.irector w

' 9.-

Directorate of Regulatory Operations Region 111 U. S. Atomic Energy Commission 799 Roosevelt Road

\\

Glen Ellyn, Illinois 60137

Reference:

Quad-Cities Nuclear Power Station, Unit 2 Docket No. 50-265, DPR-30 Appendix A, Sections 1.0 A.2, 4.7.A.2.1.2.B, 6.6.B.l.A

Dear Mr. Keppler:

The purpose of this letter is to provide you with notification of an Abnormal Occurrence as required by Technical Specification 6.6.B.I.a within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.

the colbhutdown condition for the current refueling outage, With Unit 2 in main steam jsolation valves were leak rate tested.) The following results were determined from the tests:

Within leak rate limitations:

2-203-1C, 2-203-10, 2-203-20 exceeded leak rate limitations:

2-203-1A, 2-203-1B, 2-203-2C Due to water leaking through tv.o of the leaking inboard MSIV'S, an accurate numerical leak rate value could not be determined for 2-203-2A and 2-203-28.

In accordance with our previous reporting agreement of April 4, 1974, this notification also fulfills the Ten Day Reporting Requirement of Technical Specification 6.6.B l.B.

Details of repairs necessary to correct these deficiencies will be reported at a later date when the work is complete.

This occurrence was discussed by telephone with Mr. Feierabend of your of fice on December 30, 1974 Further information will be provided by Abnormal Occurrence Report A0 50-265/74-32.

no Very truly yours, ts n o

COMMONWEALTH EDISON COMPANY M

QUAD-CITIES NUCLEAP,POWERA TATION f

/G

{?"

~'

o n-N. J. Kal ivianaki s "

$b Station Superintendent NJIULDR/vr.m 83 cc:. Directorate of Licensing J. S. Abel