ML20084Q791
| ML20084Q791 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 09/26/1973 |
| From: | Stephenson B COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084Q697 | List: |
| References | |
| NUDOCS 8306140138 | |
| Download: ML20084Q791 (2) | |
Text
__
l l
I l
l
,e,
~ ~. ~.
L" E LE L
mestern union Tele ram ~
_vv C
VEE 148(1512)(2-153336 69 Pd Q5G2h bo9. 3@
ICS IPMBNGE CSP To te nuini or AHm_.
_./ho LI k..
AttesM @yat pqpg04 ut M) 4 3096542241 TDBN CORDOVA IL_101, 09-S6_0102P,EsT _
PMS J KEPPLER DIRECTOR OF REGIA,AT040PERATIgN, FONE j
IS ATOMIC ENERGY COMMISSION 799! ROOSEVELT-RD iLEN ELLYN IL 60137
,. ) f ~ g i
~
tEFERENCE QUAD CITY NUCLEAR POWER STATION DOCKETT NUMBERS 50-nsgAND 50-265 DPR 29 AND 30 APPENDIX A SECTIONS 1 0. A.2 AND 3 8.B.3. A AND 6 6.B AT 1500 ON 9-25-73 IT WAS DETERMINED FROM THE 48 COUNT R@ OF LONGLIVED PARTICULATES THAT THE RELEASE RATE FROM oulLDING VENT STACK WAS ABOUT 120 PERCENT OF THE TECHNICAL SPEC mor 58 IOws LIMIT 3.8.B.3. A ON 9-22-73 ANAYLSIS OF THE 9-23-73 PARTICULATE f@
SAMPLES REVEALED THE RELEASE ON THAT DAY WAS 71 PERCENT OF T 8" "8 LIMIT THE VENT SYSTEM WAS ISOLATED FOR A PERIOD OF ABOUT 6 H EACH DAY SEP 2 8 1973
~,
o B STEVENSON SUPERINTENDENT SF.1331 (R5 49) l l
i
<s.
~7Q, l
.1..;
O O
l
/
UNITED STATES
[7[
- f. j ATOMIC ENERGY COMMISSION l
c-DIVISION OF COMPLIANCE b,
f REGION Ill hagg, e 799 ROOSEVELT ROAD GLEN ELLYN. lLLINOts 60137 (382) ass.zeso A.
RO Inspection Report No.
Transmittal Date Distribution:
Distribution:
R0 Chie f, FS&EB R0 Chief, FS&EB RO: LIQ (5)
RO:HQ (4)
DR Central Files L:D/D for Fuel & Materials Regulatory Standards (3)
DR Central Files Licensing (13)
B.
RO Inquiry Report No.
Transmittal Date Distribution:
Distribution:
RO Chie f, FS&EB R0 Chie f, FS&EB RO:llQ (5)
RO: LIQ DR Central Files DR Central Files Regulatory Standards (3)
Licensing (13)
C.
Incident Notification From: Commonwealth Edison 50-254/50-265 (Licensee & Docket No. (or License No.)
Transmittal Date
- September 28, 1973 Distribution:
Distribution:
R0 Chie f. FS&EB R0 Chie f, FS&EB RO: LIQ (4)
RO: LIQ (4)
Licensing (4)
L:D/D for Fuel & Materials DR Central Files DR Central Files R0 Files
,e 1f
/
a v(
t<' \\i+
I'
/
(c l