ML20084Q766
| ML20084Q766 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 10/11/1973 |
| From: | Stephenson B COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084Q697 | List: |
| References | |
| NUDOCS 8306140053 | |
| Download: ML20084Q766 (1) | |
Text
. --
i i
- r
(_
^
ItaLa E.s Telenram mestern union U
w VEC225(1624)(2-227281 E284)PD 10/11 W6ho ICS IPPENGI CSP 4 niis;,;
EUM5 (L;;... ;; a,
O
.g f
3096542241 TDBN CORDOVA 11t'83 fl0.11 Ohk'l573ted2 E"
' ) '
t JAMES KEPPLER, REGIONAb gT gJONE b-5t)'
""JM PMS US ATOMIC ENERGY COMMISS10'N,79918005EkitDIdMff 12Sfd@0 ;
h GLEN ELLYN IL 60137
[ pts to coug g WaSg_
58 REFERENCE QUAD CITY NUCLEAR POWER STATION DOCKET.. NUMBER 50254 h
AND 50265 DPR 29 AND 30 APPENDIX A, SECTION 1.0.A.2 AND UTB.T.'A ~ -
$8 AND 6.6.8 ON OCTOBER 10 1973 THE VENT STACK RELEASE R ATE WAS 268 PERCENT OF THE LIMIT OF SPECIFICATION 3.8.B.5.A. THIS WAS S$m ATTRIBUTED TO A SEAL RING LEAK ON A CLEANUP SYSTEM HEAT EXCHANGER ISOLATION VALVE. THIS SAME CONDITION HAS CAUSED THE REACTOR BUILDING VENT STACK RELEASE RATE FOR OCTOBER !! 1973 TO EXCEED OCT INE DIAIT OF SPECIFICATION 3.8.B.5. A BY 76 PERCENT.
B. B. STEPHENSON SUPERINTENDENT SF-1201 (R549)
,<.g l
l l
l
v 9 '[.
.,0
- l b
gotar c, g*i UNITED STATES
/1 ATOMIC ENERGY COMMISSION f/
g j
DIVISION OF COMPLEANCE t,
g REcION lli t/args e 799 ROOSEVELT ROAD TmW GLEN ELLYN, ILLINols 60137 (312) ess-2eso
^_
A.
RO Inspection Report No.
Transmittal Date Distribution:
Distribution:
R0 Chief, FS&EB RO Chief, FS&EB RO:HQ (5)
RO:HQ (4)
DR Central Files L:D/D for Fuel & Materials Regulatory Standards (3)
DR Central Files Licensing (13)
RO Inquiry Report No.
Transmittal Date Distribution:
Distribution:
R0 Chief, FS&EB R0 Chief, FS&EB RO:HQ (5)
RO:HQ DR Central Files DR Central Files Regulatory Standards (3)
RO Files Licensing (13)
R0 Files C.
Incident Notification From: Co:::monwealth Edison Company, 50-254 & 50-265 (Licensee & Docket No. (or License No.)
Transmittal Date
- November 9, 1973
?
Distribution:
Distribution:
R0 Chief. FS&EB R0 chief, FS&EB RO:HQ (4)
RO:HQ (4)
Licensing (4)
L:D/D for Fuel & Materials
_~
DR Central Files DR Central Files f
~
f b,pO.' y{'
pii
-