ML20084Q756
| ML20084Q756 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 10/12/1973 |
| From: | Stephenson B COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084Q697 | List: |
| References | |
| NUDOCS 8306130561 | |
| Download: ML20084Q756 (3) | |
Text
.
M M
' Telegram
.IELD(( p :.,
j a.
l VEDPPI(1607)(P-Ola40agpg5)PD 10/12/73 1607
- mp 08 ICS IPP99G7 CSP 3/2 ' h [c9 ~
Nod 3096542P41 TD9N COR,D,00A I(lh8 10 @ 0407P E
'If DPS J VEPPLER, REGI0tML-DIRECTORyeFQMEdic.ae u.a. or un (g
tfR ATOPIC ENERGY COMPISSION 799 ROOSEVELT-RD M N O
GLEN ELLYN IL 60137 REFERENCE QUAD CITIES NUCLEAR POWER STATION UNITS ONE AND TWO s. ;,,
m$$
DOCKET NUMBER 50-954 AND 50-265 DPR 29 AND 30 APPENDIX A SECTIONS
~
i 10a? AND 10A5 3RB3A AND 669 ON OCTOBER 11 1973 THE RESULT OF
$8 THF EFFICIENCY TEST OF OFF GAS HIGH EFFICIENCY FILTER IB SHOWED THE EFFICIENCY TO 9E A900T 70 PERCENT THIS IS CONCERNED AN ABNORMAL
$8 DEGREGATION OF A RADIOACTIVE PATE9I AL BOUNDRY SECTION 10A5 THE S
STa*1D9Y OFF gas FILTER IA WHICH IS WITHOUT THE CATCHER HAS REEN 85 PLACED IN SERVICE DELIVERY OF NEW OFF GAS FILTERS IS EXPECTED
'JITHIN DAYS WHICH WILL ENABLE US TO INSTALL A NEW FILTER WITH
, n,,,,,, 4 {ATCHER ON OCT08ER 12 1973 THE VENT STACK RELEASE RATE WAS
.,~g j
W30CT I2 p;; (; gg i
196 PERCENT OF THE LIMIT OF SPECIFICATION 3833A THIS WAS ATTRIBUTED To a FAILU9E OF A SEAL COILING WATER PIPE NIPPLE ON THE IB CLEANUF DUPD TuF VENT SYSTEP HAS BEEN ISOLATED AND REPAIR OF THE PIPE IS IN PROGRESS 99 STEPHENSON SUPERINTENDENT OCT 1 6 1972 srDo
~ ~
O O
/
g UNITED STATES
~
. ?
g.
ATOMIC ENERGY COMMISSION DIVISION OF COMPLI ANCE b,
$g REGION lli f
tsygg gg 799 ROOSEVELT ROAD t
TELEPHONE GLEN ELLYN, ILLINOls 60137 (s z> ess-zaso A.
RO Inspection Report No.
Transmittal Date Distribution:
Distribution:
R0 Chie f, FS&EB R0 Chief, FS&EB RO:HQ (5)
RO:HQ (4)
DR Central Files L:D/D for Fuel & Materials kegulatory Standards (3)
DR Central Files Licensing (13)
RO Inquiry Report No.
Transmittal Date Distribution:
Distribution:
R0 Chief, FS&EB R0 Chief, FS&EB RO:HQ (5)
RO:HQ DR Central Files DR Central Files Regulatory Standards (3)
RO Files Licensing (13)
R0 Files C.
Incident Notification From: Cocmonwealth Edison Co., 50-254 & 50-265 (Licensee & Docket No. (or License No.)
Transmittal Date
- October 30, 1973 Distribution:
Distribution:
RO Chie f, FS6EB RO chief, FS&EB RO:HQlQ RO:HQ (4)
Licensing (4)
L:D/D for Fuel & Materials DR Central Files DR Central Files RO Files RO Files j
e 'gs(', 7,V $
l y
r N'_
y x_
,