ML20084P712

From kanterella
Jump to navigation Jump to search
Requests Expansion Test to Prove Movement of Auxiliary Piping Sys Connected to Reactor Vessel Be Regarded as Startup Test.Telex Requesting Action Should Be Regarded as Official Request
ML20084P712
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/26/1970
From: Pratt M
NIAGARA MOHAWK POWER CORP.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19289B377 List:
References
02265, 2265, NUDOCS 8306130008
Download: ML20084P712 (1)


Text

{{#Wiki_filter:., o, ,,i o Y NI AGARA MOH AWK POWER CORPORATION

  • NIAGARA MOHAWK /gv g M/f.

q.

                                                                                                                                       '7 y3,/ 4 @r~
                                                                                                                      ~

aoo enic soutevano west g: V g '(, sva.euse. visaoa

                                                                                                                   .       43
                                                                                                                             ' g)d 4&, '~~

June 26, 1970 5 4. Q

                                                                                                                                        ' A   '\b/)

b ,f m_f' Dr. Peter A. Morris, Director Division of Reactor Licensing United States Atomic Energy Commission Washington, D. C. 20545

Dear Dr. Morris:

Re: Docket Number 50-220 Provisional Operating License #DPR-17 This morning at 10:00 a.m., you were forwarded a TWX from Mr. P. A. Burt, Station Superintendent of our,Nine Mile Point Nuclear Station. It requested that an expansion test to prove the movement of auxiliary piping systems connected to the reactor vessel be regarded in the same category as start-up testing. The TWX is to be considered an official request. A copy of the TWX is enclosed for your convenience.

f. ?fbfld Very truly yours, s

M' ot 11. Pratt 4 Vice President and ' Executive Engineer JUN 3 01970 .

                  "5'
                                                                                                                                    ~

C0py SENT REGION _ Enclosure Subscribpd and sworn to before me this 26th day of June, 1970. 4' Notary )/ Public

4. & '

03q-{,6 <

                                                                                                                                                               'j r30613OOOO 711028                                                                  <                   .                                                      -

tof ; r.t. w:cmet PDR ADOCK 05000220 -* s fM inf ery l'utloc In the State of New York ,, f Quattfied tre Onon. c2 No. 341,65450 My Committien Lupt,'s March 30.19' l

                                                                                                                                                     +7
         =^                             -__                  -l       r  -      -   .'      L_b    _-_     'E           __ x A- w __' i_      , l . % s _LZ}}