AO 50-265/74-13:on 740711,low Reactor Water Level Switch LIS-2-264-72D Failed.Switch Lightly Tapped & Special Weekly Surveilance Will Continue Until New Switch Installed.Further Info Will Be Provided by AO 50-265/74-19
ML20084K171
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 08/02/1974
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084K165 List:
References
AO-50-265-74-13, NJK-74-195, NUDOCS 8305190194
Download: ML20084K171 (1)


Text

.Q

~

8

\\

C:mmo calth Edissn 3

O,q)

Quad Cities Generatin0 Station f,

lo+,

3 Post Office Box 216 e

l

-*,f,-

f Telephone 309/CS4 2241

{ g

'{' g

~

Cordova. lilinois 61242

  • ;'~;c,a, NJK-74-195 T

~

Q%?

}yl y >.(.

Telecopy:

Region III, Attention: Mr. C. Feierabend

.?%

.\\

' N 'Q. $ !', -

August 2, 1974

^

J. Keppler, Regional Director Directorate of Regulatory Operations Region III

~

U. S. Atomic Energy Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

Quad-Cities Nuclear Power Station, Unit 2, Docket No. 50-265, DPR-30, Appendix A, Sections l~. 0. A. 2, 3.2.B, Table 3. 2. 2, 6. 6 ~.B. l. a and AO-50-265 /74-13.

Dear Mr. Kepples:

The purpose of this-letter is to provide you with notification of an Abnormn):necurronca M raqui vad by Tachnical S~cific?tien G.6.L.l.a wii.hin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or une occurrence.

While doing the special weekly surveillance test on LIS-2-263-72D as per o'ur letterc of July 11, 1974, the switch failed to actuate.

The switch was lightly tapped and sdbsequently operated normally.

Special weekly surveillance of this switch will continue until a new switch is received and installed.

The switch has functiened normally on two previous special tests performed since July 11, 1974.

'This obcurrence was discussed by telephone with Mr.' Jordati of your office on August 2, 1974.

Further information will be pro' tided j

by Abnormal Occurrence Report AO 50-265/74-19.

This report is submitted in accordance with our representative agreement of l

receipt and installation of the new switch.

Very truly yours, Commonwealth Edison Company I

Quad-Cities Nuclear Power Station f

I L r,p nv f -.

!{

. Kalivianakis

(.f g]/(,

Station Super.intendent L

NJK/LDR/SAA

'l MU L

/

r J

cc: Directorate of Licensing J.

S. Abel gnr p D.EGION SQy4M e

f s