Suppls AO 50-265/74-13 Re Present Status of Low Reactor Water Level Switch LIS-2-263-72D.Surveillance Interval Changed to Monthly on 760901 & New Switch Installation Delayed Pending Forthcoming Analog Trip Sys
ML20084K162
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/05/1976
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084K165 List:
References
NJK-76-369, NUDOCS 8305190192
Download: ML20084K162 (2)


Text

-

T-Co nwealth Edison O

3 'MMff',

  • ~

d Qua

s Nucl;ar Pow;r Station Post c2 Box 216 Cordova. Ilknois 61242 Telephone 309/654-2241 IE FILE COPY NJ K-76-369

\\M 4

T Q

6 October 5, 1976

<f..

8 N. Cfg0 2

-Q

'2 79 7,%~

J. Keppler, Regional Director

.%M Office of Inspection and Enforcement h

4 [3'/

Region ill hp"# I#

U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

1) Quad-Cities Nuclear Power Station Docket No. 50-265, DPR-30, Unit 2 Appendix A, Section 3 2.B, Table 3 2.2
2) Quad-Cities Station Abnormal Occurrence Reports 0 50-26504-3, A0 50-265/74-13, A0 50-265/74-16, and A0'50-265/74 g The purpose of this letter is to provide you with information concerning the present status of Unit Two Low-Low Reactor Water Level Switch LIS-2-263-72D. This Yarway Model 4418C switch had experienced several failures in 1974, and these occurrences were reported in the referenced Abnormal Occurence Reports.

Details regarding corrective actions to be taken were itemized in report A0 50-265/74-13 These proposed actions consisted of replacing the defective switch, and performing the functional surveillances weekly instead of quarterly.

By agreement with your representative, the failures given by occurrences A0 50-265/74-16 and A0 50-265/74-19 would be reported with written followup after the new switch was installed.

Following the ordering of a new switch, a lengthy time period was required to obtain the necessary parts.

Since an outage was required to install the switch, it was decided to schedule this installation during the Unit Two Fall, 1976 Refueling Outage.

In reviewing the performance of LIS-2-263-72D over the last 26 months of continuous weekly survelliance testing, this switch has not failed to properly actuate at its required setpoint.

The last failure of this switch was reported on August 2, 1974.

Based on this reliable performance over the past two year period, the surveillance interval for LIS-2-263-72D was changed to monthly on September 1, 1976.

0305190192 761005 PDR ADOCK 05000265 S

PDR OCT 121976

O

.. I. * ~ -

Additionally, installation of a new switch has been deferred pending the forthcoming installation of a new analog trip system for ECCS initiation and, Reactor Protection System level Instrumentation. The Commonwealth Edison Co. Station Nuclear Engineering Department is presently designing this system. Action item 4-75-25 was issued to Engineering to assure completion of this project. The Station has recently begun.similar investigations regarding the Unit One EHC Low Oil Pressure Switches. An experimental analog trip setup has been constructed and data are being gathered to determine the reliability of such a system. This experiment is documented by'Special Test No.

1-21.

The replacement of the existing Yarway level switches with the analog type system will be documented by Modification Packages M-4-1-76-34 and M-4-2-76-34, and Special Project Request No. QC-Il9 Very truly yours, COMMONWEALTH EDISON COMPANY QUAD-CITIES NUCLEAR POWER STATION

/

[