Text
((G db Cuad Cit es Gr C:ma.c 1w:alth Edison amostahon
'. Ped C1' n-
~
)
a.
i Cc:Cc.8:D.cc.. - ; &2 p
~.,N
- ,Q--/
Tcicphor:6303/654-2241
/'f, ~" k/.- N,
/ r.
O (f,ff 0
T\\
I. i O
fp '
p
\\
J s.
-s NJK-74-264
.,ffe-
-T.
e
',; 9;.' y ~-
4 s c:.w c,-
September 6, 1974 h
s y D/
s',-
Mr. J~hn P. O' Leary, Director o
Directorate of Licensinc; Regulation A l },ji ~ -
U. S. Atomic Energy Co~:nission
'Tashington, D. C.
20545
Reference:
C.uad-Cities Nuclear Power Station, Docket No. 50-265, DPP.-30 App 7ndix A, Sections 1.0.A.2, 3 2.A, Table 3 2.1, and 6.6.B.1.a.
Dear "r.
O' Leary:
Enclostd please find Abnormal Occurrence Report No. A0-50-265/74-20 for Quad-Cities Naclear Tower Station. This occurrence van previously reported to Hecion III, Directorate of Hernlatory Operations by telephone on Aup:st 29, 1974 and to ycu and Region III, Directorate of Heculatory Operatiens by tclecopy on August 29, 1974 This report is cubmitted to you in accordance with the requiren;cnto of Technical Spcification Section 6,6.B.1.n.
Very Truly Yourc, CO:!NOMALTH EDISCN C0"PI.ITI CUAD-CITIES I'UCUUdt FO'.GR STATION F
l
//
/
/
/
N. J. Knlivianakic Station Superintendent NJK/itR/rhh Region III, Directorate of Regulatory Operationc ec:
J. S. Abel b
'( 0 )-
.7 i
LA'l' i
fll 9305190172 5
COPY SENT REGION
\\
nElwP tarter: A0-50-265/74-20 REPORT DATE: 9-6-74 t
CCCintRE7:CE LATE: 8-28-74 P!.CII,ITY: Cuad-Cities Nuclear Power Station Cordova, Illinois 61242 ID377PIPICATIO'? 0? OCCI9'1E"CE:
Unit 2 Iain Steam Line Hich Flow Group Cnc leolation switch failure.
COUnlTIC, Fiscit To CCCUItE;:CE:
Run Mode 2400 TO t 732I'4e DESCRTPTIO?I 0F OCCURRE!'CE:
~..hile doing routine quarterly surveillance at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on August 26, 1974, it was discovered that FIS-2-261-2G would not trip when a differential pressure in excess of that corresponding to a flow of 1PO% of rated flow was applied. Tnis was in violation of Section 3.P.A, Tabic 3 2.1 of the Technical Specifications. No protective system or operator actiona were required to bring the situation under control.
DESIG?IATIO:! 0F APPARRI'P C/,USE OF OCCURRENCE:
(Other - instrument drift)
The instrument was inspected and no physical problems were detected. The calibration records for the first two quarters of the year were checked and no larre !>etpoint adjuntments were made. This ruled cut any personnel error during a previous calibration. Since no other factors could be discovered, the apparent cause of the occurrence was attributed to instrument drift.
s
t b
ANALYSIS O? OCCIGRIC M :
There were no safety implications from this instrument failure. There are three additional hich flow sensors in the same sub-channel as FIS-2-261-2G and each would have functioned properly if a high flow condition had occurred.
CORRFCTIVE A*, TION:
The immediate corrective action was to recalibrate and functionally test the switch in accordance with Surveillance Test //21.
- s was stated in the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> uritten notification, the switch was examined during an outace on September 6, 197h. No defects were observed during this examination. 3 This switch will be functional 3y tested weekly for one month to demonstrate its reliability. Nomal scheduled survcillance will be resumed following this period if the recults are satisfactory. The first weekly functional test proved the switch perfor.ance to be satisfactory.
FAIL 1RE DATA:
FIS-2-261-2G is a Barton Model 278 with a 0-200 PSID rance. There have been previous instances where the setpoint has drifted, but thic is the first tiac that a Barton Model 278 has failed to trip at all; thus, there are no safety implications related to cu=2ulative experience with these switches.
DATE EPN RANO3 D3UT (PSID) 11/9/73 1-261-20 0-200 l'SID
+3
-r
+2h
-2M 2/24/73 2-261-2C 0-200
+3
-2G
+2 11/18/72 1-261-2a 0-200
+5 2-261-2G
+3
-2L
+5
-2N
<5
.