ML20084K101
| ML20084K101 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 09/03/1974 |
| From: | Kalivianakis N COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20084K071 | List: |
| References | |
| NJK-74-258, NUDOCS 8305190146 | |
| Download: ML20084K101 (1) | |
Text
- _ _ _ _ _ _ _ _ _ _.
O O
c me siseemenoroesassam Postonceanesige Cordove,Ilanets5124E TesophoneJoste54mor-FUK-74-258 Telecopyt: RegiorIII,, Attention:. Nr C.Feierabomi' September-3. 1974 J Keppler,- Regional Director Directorate of Regulatory Operations Region.III IT. S. Atomic Enerar Coannission.
799 Roosevelt Road Glen. Ellyn, Illinois-60T37 Refereneet Quad-Cities-Nuclear Power-Station, Unit 2 Donket h. 50-765, D7R-30 Ap==rmife. A,. Sections 1.0.A.4, %.1.a, Table-4.1 1, 6.6.B,.t.a Dear-Mr. Kapplert
'Ihe purpose of this letteris _toprayide you-with. natification. of an AbststPtal Occurrence as required-by Technical. Specificatiom 6.6. Bit.a7wTthin 24 houYWIbf '
the occurrence.
With..tinit 2. reactor-in the. Cold Shutdown Conditiort at 4:30 AK on..Se N a 3',.
197%, during monthly surveillanoe. testing on IGIV closure, a half serme-and anmmoiste alarm-were not. received when_ ftsse 590-102F was pulled mui valven A0-2-P03-1D:was closed. The test was: 24peated three times at 10tOO AM: and!'a half scram and alarm were received each time. Electrical Maintenanee personnel.
an in the process of investigating circuitry
'Ihis occurrence: was discussed. by telephone with. Mr Peierabend of yow office l
on September 3,.197%.
Furthern infonnatien.will be provided. by" Abstormal l
Occur 2* nee Report AO 50-265/74-23 which. will be submitted within.10 days or the date of this oscurrener.
Very truly yours, 1
i COMTHf4EAIllW. EDISON COMPANY" l
QUAD-CITIES NUCIJLM PCT 4ER STATION-
/ W-W N. J. Kalivianakis.
Station Superintendent ruK/IPG/rhb ont Direct e.-
at
- 3. S. D ei i
SEP 3 E e305190146 740913
/P,
PDR ADOCK 05000265 f
s ma
.