ML20084H155
| ML20084H155 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/16/1984 |
| From: | Chiangi N CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 167, MQAH-84-168, NUDOCS 8405070463 | |
| Download: ML20084H155 (1) | |
Text
.
CP&L Carolina Power & Light Company P. O. Box 16 ina 27562 April 16, 1984 FILE:
SH N-2/18 MQAH 84-168 Item 167 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 MINIMUM WALL FOR SAFETY RELATED PIPING
Dear Mr. O'Reilly:
This is to confirm the April 13, 1984 telephone conversation between Mr. K. V. Hate' (CP&L) and Mr. A. Hardin (NRC).
Mr. Hardin was informed that the March 14, 1984 potentially reportable item, pertaining to the conflict between the pipe wall thickness specified on the Ebasco stress isometrics and that shown on the piping line list to which mcterial is manufactured / installed, has been evaluated and considered not to be reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21.
Thank you for your consideration in this matter.
Yours very truly, l$
/AD s
NJC/mt f klfff cc:
Mr. R. C. DeYoung N. J. Chiangi - Manager Mr. G. Maxwell Quality Assurance / Quality Control Mr. R. L. Prevatte Harris Plant i
_.,l0 1
zear
.