ML20084E514
| ML20084E514 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/29/1971 |
| From: | Plant C ROCHESTER GAS & ELECTRIC CORP. |
| To: | James O'Reilly US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20084E442 | List: |
| References | |
| NUDOCS 8304150099 | |
| Download: ML20084E514 (2) | |
Text
.
l v
Dele ram b:
E M LEWJstem union w
1216P EDT SEP 29 71 PA129 SYA225 SY'.RHA115.BR PDF RX ROCHESTER.NY 29 1145A EDT JAMES P 0REIILY, DIR REGION ONE DIVN'0F COMPLIANE USAEC 970 BROAD ST NEVARK NJER n
THIS IS TO CONFIRM MY CONVERSATION AT 118% THIS DATE VITH E0 MIQQINBOTHOM IN REGARDS TO AN ABNORMAL OCCURENE AT.GINNA
'~
STATION LABCRATORY ANALYSIS OF THE CHARC0AL FILTERS FROM THE PLANT VENT MONITOR.HAS INDICATED THAT APPROXIMATELY SEVEN MILLICURIES 0F 10 DINE 151 VAS REEASED TO THE ATM0 SPHERE FROM $15 HOURS R
$,f 0N SEPT 27TH TO M20 HOURS ON SEPT 2BTH 1971.
1
'h THE PLANT VENT 10 DIE MONITOR WAS.IN OPERATION AND INDICATED
[8 A RELEASED RATE VITHIN.ALLOVABE LIMITS. FROM LABORATORY ANALYSIS q
g$
IT IS ESTIMATED THAT THE AVERAE REMASE. RATE VAS APPR0XIMATELY 88 THREE TIMES.THE LIMIT.OF OUR TECHNICAL SPECIFICATIONS 5 9 2.1.
SINM.THIS PERICD EXEEDED FIFTEEN MINUTES 1HE REEASED.WAS ~
kj j(8u2 8
IN EXESS OF 5 9 2 2 0F OUR TECHNICAL SPECIFICATIONS. THE SOURM
[
, Copy sent PDR
=mm
e I
l.
l i
l i
l
@ tern unionLE 4
belegrard 1
(
HAS. MEN DETERMINED AND CORRECTIVE ACTION HAS MN.TAKENGM l,
SUBSEQUNT LAPORAT0Y ANALYSIS INDICATE HAT M ARE MLOW THE
~ ;
5 9 2.1 LIMIT CHARLES E PLANT SUPR GINNA STATION l C.
Ol 114161512515 27TH 120 28TH 1971 592 5922'.92.1
(-
l
( 1156 )-
4 i
(.
e r.
1
?
t h
k 8F.1201 (R549) l
_ _ _ _ _ _ _ _. _ _. _