Monthly Operating Rept for Mar 1984
ML20084A890
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/31/1984
From: Blatt M, Otoole J
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To: Mcdonald W
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8404260009
Download: ML20084A890 (7)


Text

-

OPERATING DATA REPORT DOCKF.T NO.

DATE 4-5-84 C05fPLE11 D HY M.

Bln t t TELLTilONE (o1 AT 426-5127 OPERATING STATUS Notes Indian Point Unit n?

1. Unit Name:

March 1984

2. Reporting Period:

2758

3. Licensed TFermal Power (51Wt):

1013

4. Nameplate Rating (Gross SIWE):

S. Design Electrical Rating (Net 31We): _873 000

6. Staximum Dependable Capacity (Gross 51We):.

N

7. Sf aximum Dependable Capacity (Na 5fWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power LeselTo Which Restricted. II Any (Net SIWE):

h

10. Reasons For Restrictions.If Any:

1 This 5fonth' Yr.-to-Date Cumulative

.o 7AA 9196

' n9690

11. Hours in Reporting Period 744 1741.46 57688. 6L
12. Number Of Houn Reactor Was Critical 0

0 2119.73

13. Reactor Reserve Shutdown Hours 744 1717.50 55913.20
14. Hours Generator On Line 0

0 0

15. Unit Resene Shutdown Hours 701R161 461701R 169670s17*
16. Gross Thermal Energy Generated (51WH)
17. Gross Electrical Energy Generated (MWil) 648422.__,

1461680 45119256 625008 1400387 43027479

18. Net Electrical Energy Generated (MWif) 100.0 78.6 65.4
19. Unit Senice Factor 3

100.O 78.6 65.4

20. Unit Availability Factor 47.?

74.?

ms.6

21. Unit Capacity Factor tUsing SIDC Net)
22. Unit Capacity Faetor(Using DER Net) 46.?

71.4 57.7 0

21.4 9.6

23. Unit Forced Outage Rate
24. Shutdown
  • Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

1984 TN 9ERVTCE TNSPECTION/REFUET INC OUTAGE SCHEDUT ED TO BEGIN JUNE 2.

10 VFAR

25. If Shut Down At End Of Report Period. Estimated DJte of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed

'NA NA INITIAL CRITICALITY

, INITI \\l. Fl.FCTRICITY Cont \\ll RCIAL OPI'R A l'lON 1934152.

  • September 1983 Cross Thermal Energy Cencrated (MWH) corrected to WI77I 8404260009 840331

_PDR ADOCK 05000247 R

PDR-

l AVERAGE DAILY uni r POWER LEVEL DOCKET NO.

UNIT I.P. Unit No. 2 DATE 4-5-84 COMPLETED BY

!!. Blatt TELEPil0NE 914-526-5127 MON 111 MARCil 1984 s

DAY AVERAGE DAILY POWER LEVEL IJAY AVLR AGE DAILY POWER LEVEL (MWe-Net)

(MWe NeO I

834 l7 842 2

840 18 844 3

844 19 845 4

845 20 843 5

R45 21 844 6

843 22 Rao 7

845 23 844 834 24 846 844 25 845 844 10 26 846;'

842 II g -

840 12 841 28 Ra7 13 845 39 gy 14 749 30 845 15 841 845 3g 16 -

845

.INSTRtlC110NS

~

~

' r. -

. + o r.

..m.

i,,...

.u,.,

4 e

m..1

.. m.

-.L

.- 4

-[I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-247 i

t, NIT NAME I. P. I'n i t il 2._

DATE 4 ' 84 s.

COMPLETED BY M-

"1

0, REPORT MONTri March 1984 TELEPilONE (o u) 5 5!'"

5 1

9 1

~

w.

i E

E 4

i

.! E 3

$.E h Licensee 5-r, K'd Cause & Currective j

No.

Date

(

3g s

jg&

Event g'!

o.

Action to l-f5 5

5 ;5 c Report #

wU Present Recurrence t

u

?

i 6

f i

f N/A 3-14-84 F.

N/A A

N/A ED Elecon Reduced load due to high temperature ISOPIIASE BUS "B".

i i

s l

f i

I 2

3 4

i F: Forced Reason:

Methixt:

Exlubit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data l

B Maintenance of Test 2-Manual Scram.

Ei.try Shects for Licensee C-Refueling 3-Automatic Scram.

Esent Report (LERI File (NUREG-l D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examinatism l

F-Adninistrative 5

G-Operational Error (Explain)

Eshrbit I - Same Source (177)

H-Other (Explain)

+

n m

SUMMARY

OF OPERATING EXPERIENCE MARCli 1984 At the beginning of the report period Unit 2 was' operating at 100%

reactor power.

During the month, four brief deratings occurred as follows:

On March 8,

a 20 MWe reduction resulted from a turbine runback caused by an apparent intermittment failure of the Dropped Rod Turbine Ruphack citcuit.

Following the runback, one of two pressurizer spray valves stuck partially open.

A containment entry was rude and the spray line serving that valve was isolated.- The unit was then returned to full power.

On March 11, an electrical ground resulted in a loss of moisture separator reheater heating steam supply and a

25MWe load reduction.

The ground was located and isolated and the unit was then returned to full power.

On Match 14,_

reactor power was reduced to 75% due to high temperature indication on isophase bus "B".

Investigatfons found no problem and the unit was returned to full power.

On March 27, a signal spike on the overpower delta T instrument resulted in a turbine runback and reduction of reactor power from 100% to 94%.

The cause of the spike was found to be a failed resistor in the NIS input to #23 loop overpower delta T.

The resistor was replaced.

The unit was returned to full power and remained there for the rest of the month.-

8

.ms.

e e-.-

~

4

  • - - +

gma,,wq.mgwe a

m-7 dune 4-e-

-N*

.m

t MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWR. NO SYSTEM COMPONENT DATE CORRECTIVE ACTION 11384*

CVCS 23 Charging Pump 12/13/83 Rebuilt Seals 11422*

CVCS 22 Charging Pump 12/15/83 Replaced Packing 1207 ELEC CRD/RPI Con-1/6/84 Changed Connectors nectors 1244 CYW City Water 1/5/84 Installed Valve Isolation Valve 1813 CS Condenser 1/5/84 Completed Leak Response Modification 7464 EDG 22 EDG 1/28/84 Replaced 4 Lube Oil Heaters 7471-7474 VC 80+95' El Airlock 1/7/84 Adjusted Inner and Outer Door Limit Switch 7708 IA

PCV 1216 1/5/84 Replaced Regulator 8682 EDG 22' Jacket 1/28/84 Replaced JW Heaters Water Heater 9311 ELEC Battery 22 1/13/84 Charged Cells cells L9-20-21 9371 SW SWN 44-3A 1/11/84 Adjusted Limits 9504 SW SWP 0031-009 1/26/84 Overhauled Pump 10063 HPS 24 HP Blower 1/20/84 Install New Blower and Motor 10326 ACS Valve 791 1/9/84 Adjusted Limits 11516 CYW PCV-ll89 1/16/84 Changed Microswitch 11537' MRS Valve MS-1-24 1/7/84 Lubricated Valve 11538 MRS Valve MS-1-23 1/7/84 Lubricated Valve 11568 EDG 22 EDG 1/20/84 Cleaned JW Coolers 11569 EDG 23 EDG 1/23/84 Cleaned JW Coolers 11761 WCCPPS**

SOV-1278 1/6/84 Repaired Valve k

. - - ~ - -

MAJOR SAFETY RELATED CORRFCTIVE MAINTENANCE MWR. NO SYSTEM COMPONENT DATE CORRECTIVE ACTION 11804 WCCPPS Valve 1110-4 1/7/84 Replaced Valve 11820 MRS Valve MS-1-22 1/7/84 Lubricated Valve 11821 MRS Valve MS-1-21 1/7/84 Lubricated Valve 11828 MRS Valve MS-2A 1/7/84 Lubricated Valve

-11829 MRS Valve MS-2B 1/7/84 Lubricated Valve 11830 MRS Valve MS-2C 1/7/84 Lubricated Valve

.11831 MRS Valve MS-2D 1/7/84 Lubricated Valve 12017 CVCS 23 Charging Pump 1/18/84 Replaced Seals 4

12018 RM R 13 Particulate 1/18/84 Replaced Pump / Belt Compressor 12057 IA Valve 876B 1/19/84 Changed Regulator 12077 EDG

21 EDG 1/19/84 Cleaned Coolers-Previously called WCCP Connection to February MOP e

4

/r i

w

John D.'O'Toob Vice Presx2ent Consolidated Edison Company of New York. inc.

4 (f ving Place, New York. NY 10003 Telephone (212) 460 2533 April 16, 1984 Re Indian Point Unit No. 2 Docket No. 50-247 Mr. William G. Mcdonald, Director Office of Manag9 ment Information and Program. Control c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Mcdonald:

Enclosed you will find two copies of,the Monthly Operating Report for Indian Point Unit No. 2 for the month of March 1984.

Ver truly yours,

/

f']%ti V

Encl.

[

cc:

Mr. Richard DeYoung, Director (40 copies Office of Inspection and Enforcement c/o Distribution Services Branch, DDC, ADM U.S. Nuclear Regulatory Commission Washington, D.C. 20555:

. Dr. Thomas E. Murley, Regional Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Ave.

King of Prussia, Pa. 19406 Mr. Thomas Foley, Senior Resident Inspector U.S.. Nuclear Regulatory Connaission P.O. Box 38 Buchanan, New York 10511

\\