Second Interim Deficiency Rept DDR 2209,Item 149 & Part 21 Rept Re Transamerica Delaval Engine Mounted Fuel Oil Lines Emergency Diesel Engine Generator Sets.Insp of Fuel Oil Clamps & Brackets Will Be Made.Next Rept by 841031
ML20083K214
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/06/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-DDR-2209, CON-NRC-206, REF-PT21-84-220-000 149, DDR-2209, PT21-84-220, PT21-84-220-000, NUDOCS 8404160102
Download: ML20083K214 (4)


Text

'

7 .,

Carohna Powe &, L Company

-g m-,

P. O. Box 101, New Hill, N. C. 27562 April 6,1984 Mr. James P. O'Reilly NRC-206 United States. Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30303 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT 1 ENGINE MOUNTED FUEL OIL LINES EMERGENCY DIESEL-ENGINE GENERATOR SEIS PURCHASE ORDER NY-435879, ITEM 149

Dear Mr. O'Reilly:

Attached is our second interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21, on November 18, 1983. CP&L is pursuing this matter, and it is currently projected that corrective action and submission of

^ the final report will be accomplished by October 31,1984.

Thank you for your consideration in this matter.

Yours very uly, V)r R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/bk Attachment cc: Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC)

IOIAL (;6py 8404160102 040406 PDR ADOCK 05000400

^

[E7'1

- s.. . S. . ,__ PDR L - I g

r- a .e - ;

s,. . ,

. w. -

y ; < , y

~ ~

3

.s x

- CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR-POWER PLANT UNIT NO. I f'

. INTERIM REPORT APRIL 6,'1984 f

POTENTIALLY' DEFECTIVE ENGINE-MOUNTED MIEL OIL LINES 4

EMERGENCY DIESEL ENGINE CENEPATOR SET-f f

L . .

x;; ' ITEM 149-

,  :(DDR 2209) f .

s s- . . . . . .

, j. ' REPORTABLE UNDER 10CFR50.55(e) 'AND 10CFR21

.:._i ee a 4

?

r <

l' ~.. ,

I ((. -.

Y r

w , j s

,y ~ -

4

~

l

,a 'e 7

,cd, r , .

k.. : ~

a . . ' . V) i p

v"( .,'-

j .f_. 9 3 e :.1 : . ,

, \ ', ~ " - ~ >k =. 'i s s,.. < '

i,~

i , - . " "

~ .

9 SITJECT: Shearon Harris Nuclear Power Plant Unit No. I 10CFR50.55(e) and 10CFR21 Reportable Deficiency Potential defect with engine-mounted fuel oil lines

- on the emergency diesel-engine generator sets.

ITEM: Engine-mounted fuel oil lines of the emergency diesel-engine generator sets.

-SUPPLIED BY:

Transamerica DeLaval, Inc. , Oakland, California under CP&L Purchase Order NY-435079.

4 NATURE OF DEFICIENCY: Transamerica DeLaval, Inc. shipped two diesel engines to

- the Shearon Harris site in May and June 1981.

,a In September 1983, Transamerica DeLaval notified CP&L that a potential problem existed with the engine-mounted fuel oil lines of the emergency diesel generator engines.

Excessive line vibration due to improperly balanced fuel injection equipment could cause the fuel oil lines to

. rupture,- resulting in engine nonavailability and possibly r fire in the Diesel Generator Building, p - <

DATE PROBLEM -

OCCURRED
- Refer to the above section.
DATE - PROBLEM i

REPORTFD: J0n 0ctober 24, 1983, CP&L (Mr. N.- J. Chiangi). notified

. .g E thel NRC (Mr. A. Hardin) . that this

  • item was : potentially reportable:perf the. provisions of 10CFR50.55(e) and a _
10CFR21. -

_ L0n November- 18,' 1983, CP&L'(Mr. N.'J.-Chiangi)' notified the -NRC. (Mr. A. Hardin) that' this item is reportable per

,X theLprovisions of.10CFR50.55(e) and 10CFR21. '

,17. -= 1 . ',

" d

,4 ._c

' ' ' SCOPE OF,

.s SThepotential;defectaffectsybothemergencydieselengines

~

iPROBLEM:,

purchased ,on NY-435079.;

s o

& 4 .; <

- ~,'

..  %. e ,

SAFETYI -

a i IMPLICATION: 4 (The Jdiesel-engine ; generator ' sets . supply power to the T ESFJ M' .

, , - , buses .in the event
that both normal on-site .and off-site . .

t:x , s power sources are slost.

m.s

s. -

i -

ye , ._

?

~'

?< . . 'g9 '

' I

- 1 4 ,

]' t ,

  1. Y'  ; _;. , . ,

? ' n,

.l..  :

h_ l ,, , _

^

  • M . g'

~

,i 9; Y: ,

is k

n ,r-

.- . p-

?.o -

The potential defect of excessive vibration in the fuel oil lines could affect engine operation and possibly present a safety hazard.

REASON D EFICIENCY IS REPORTABLE: If lef t uncorrected, rupturing of the fuel oil lines could result in the loss of emergency on-site AC power.

CORRECTIVE ACTION: A complete inspection of fuel oil line clamps and brackets will be made using vendor-supplied drawings. Engine balance is to be checked and maintained. Fechanical Engineering will evaluate the fuel oil lines' ' installation and make a decision concerning the necessity of adding a spray shield as a fire preventive reasure in the event of a fuel oil line rupture.

FINAL REPORT: Evaluation of the fuel oil lines shows that Engine IA-SA has the clamp and shield per the latest TDI drawing sent November 4,1983. The shield and clamp for Engine IB-SB will be installed by June 15, 1984. The engine vibration will be checked during start-up to determine properly balanced fuel injection equipment. The engine start-up is projected to 1xt October 31, 1984, at which time a

. final report will be submitted.

t 9

- k,

a ~ ,

~

  • e u~

t' s. .

-t

, .4--

ro ts

..y ,

4 .

, -N .. ,

i,- '-?r '

t ' m l

i-t-

r

' :N . , w n Y

J

-]i

." I #

r r  :+ ,

l 8 f j { Y