NUREG-0580 Vol.12, No.11
=
- =
- 2 x_==
=; ;= _-_ _ - __
REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS
[ BLUE BOOK?
NOVEMBER 1 - NOVEMBER 30,1983 UNITED SfATES NUCLEAR REGULUORY COMMISSION s ** "'%q p
84 l i]
3 831?al 0580 R PDP
I\\l 0
S E
U S
M S
A I
R EG 2
RO 1
NI2 F
S 5 M
EF0 ON ES5 A
MF4 O
IE5 R
UO0 SI PL0 M G C
R DN.
IC F
I' OB GG E S ON L
E ID CU N/D B
L TR P
IC N
SR A
A NP L
S E
N OS HN I
DTO II F O A
S NNT TH OMT V P EEG PT OG A G TMN I
ERN
/
NNI RR HFI C
IRH CO C H R
RES SF IES N
EVA B
FLA POW U
OBW UG S
RA S
CL S
II R
MA A
V E
A Y
A 2
Lllll ll
NUREG-0580 Vol.12, No.11 REGULATORY LICENSING STATUS
SUMMARY
REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)
NOVEMBER 1 - NOVEMBER 30,1983
$ e"IuI$ished? ece be 19 3 Prepared for: 0FFICE OF NUCLEAR REACTOR REGULATION Prepared by- 0FFICE OF RESOURCE MANAGEMENT U.S. NUCLEAR REGULATORY COMMISSION
)
WASHINGTON, D.C. 20555
/* **%,
hY a
. _ - ~
1 F0REW0RD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS
SUMMARY
REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF NUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR. OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIONAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE NANAGEMENT IN THE IMPLEMENTATION OF THE REGUL ATORY INFORMATION SYSTEM.
SECTION I 0F THIS EDITION CONSISTS OF THE THREE
SUMMARY
OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AND CP'S, AND AN ABBREVIATION KEY.
SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A NON-POWER REACTOR
SUMMARY
EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW, AND TARGETED AND ACTUAL COMPLETION DATES FOR ALL KEY MILESTONES IN THE REVIEW.
LICENSING 0F NUCLEAR REACT 0RS THE U.S. NUCLEAR REGULATORY COMMISSIGH REQUIRES TWO SEPARATE LICENSES - OHE TO BUILD THE FACILITY AND ANOTHER TO OPERATE IT.
LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.
THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AHD ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AHD THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATIONS.
THE HRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM.
TECHNICAL EXPERTS AHALYSE THE APPLICATION, AHD PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSO MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.
4 THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AHD HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS.
THE ACRS FINDINGS ARE REPORTED TO THE NRC AHD MADE PUBLIC.
A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPOSED SITE, BY AN HRC APPOINTED ATOMIC SAFETY 8 LICENSING BOARD.
PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.
AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.
THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER HUCLEAR REGULATORf COMMISSION.
IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISION OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT.
AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TD BE SUITABLE BY THE NRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTION BY THE OFFICE OF INSPECTION AND ENFORCEMENT.
AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE NRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.
IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTIGH PERMIT REVIEW PHASE, A HEARING IS HELD OHLY IF INTERVENTIFi IS GRANTED. FINAL ISSUAHCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THL DIVISIDH OF LICENSING AND OF THE COMMISSION.
TABLE OF CONTENTS PRINTED IN THE ORDER LISTED SECT ION I
SUMMARY
OF ACCOMPLISHMENTS OL
SUMMARY
OF ACCOMPLISHMENTS CP
SUMMARY
OF ACCOMPLISHMENTS COMBINED HUMERICAL
SUMMARY
OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE HEXT FIVE YEARS TARCET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS NEW APPLICATION FORECAST
- OPERATING LICENSE REVIEWS SPECIAL REVIEWS COMMON ABEREVIATIONS USED WITHIH THE PUBLICATION SECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS SECTION III EXAMPLE REVIEW
q
.._.m
._m__.
_._m.mm._...m_m. -..... _ _ -
__m~._
_-m_..
a___._.____.
'i e
I 1
S I
I i.
f I
i I
i-J I
1 i
J t
1 4
t z
n O
]
M
.1
>=
0 UJ to 1
,1
)'
I i
l i
I i
}
1 I
t i
4 l
(
I i
c e
t
?
i i
i i
l i
l
0L
SUMMARY
0F ACC0MPLISHMENTS AS OF NOVEMBER 30, 1983 NOVEMBER EJSCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL SER ' S S ER ' S HARRIS 1 8 2 11/30/83 11/30/83C HARRIS 182 11/01/83 11/30/83C SSER ' S SSER ' S COMANCHE PEAK 1 &2 11/23/83C COMANCHE PEAK 1 82 11/23/83C LASALLE 2 11/21/83 11/21/83C DIABLO-CANYON 1 8 2 10/14/83C LASALLE 2 11/21/83 11/21/83C MIDLAND 182 11/17/83 11/17/83C PALD VERDE 1,2,3 11/28/83 11/28/83C MIDLAND 1 82 11/17/83 11/17/83C PALO VERDE 1,2,3 11/28/83 11/28/83C DES ' S DES 'S NONE NONE FES ' S FES 'J NONE HARRIS 1 &2 10/31/83 10/31/83C l
' S ISSUEDM 0L ' S ISSUEDM QL M
FULL POWER
(
L A
U T
C A
D E
E T
L A
U D
D E
O H
T C
S R
A E
Y S
L A
T C
S N
I F
E D
N Y
T E
H I
L U
S I
C S
I A
F S
L S
I P
3 3
E S
E E
S E
S E
E M
9 N
N N
N H
N 1
O O
R O
O D
S O
0 N
N N
N N
N R
E S
S C
0 3
E S
E E
P C
R S
S D
F C
A E
B M
E F V O
0 N F
O Y
S L
R A A
U A
T C
M A
M U
S D
E L
U P
D E
C H
R C
E S
B M
E V
O N
D Y
T E
I L
I C
S A
F S
S I
E S
E E
S E
S E
E N
N N
N N
N O
O R
O O
O S
O N
N N
N H
N R
E S
S E
S E
E P
S S
D F
C
SUMMARY
0F ACC0MPLISHMEH TS AS OF HOVEMBER 30, 1983 NOVEMBER FISCAL YEAR TO DATE 1CjifpjllfD ACTUAL SCHEDUL(D ACTUAL 5ER ' S( 0L )
1 1
SER'S( 0L )
1 1
0 0
0 0
' S( 0L )
3 5
SSER ' S( 0L )
3 4
SSER SSER ' S( CP 3 0
0 SSER ' S( CP )
0 0
DES'S( 0L )
0 0
DES ' S ( 0L) 0 0
DES' S( CP )
0 0
DES ' S( CP )
0 0
FES' S( 0L) 0 0
FES ' S( 0L )
1 1
' S( CP )
0 0
FES ' S( CP )
0 0
FES t
i 0L'S ISSUEDM 0
0 0L'S ISSUEDM 0
0 CP'S ISSUED 0
0 CP'S ISSUED 0
0 l
M FULL POWER l
(
i
l LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS OF 11/30/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1985)
(LISTED IN ORDER OF FACILITY HAME) i SER SSER EST.
STAFF TECH STAFF TECH ASLB COMM*
APPL.
DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE S1 ART INITIAL DEC.
CONST.
PLANT (MONTHS) D11 TO DL 113 d,T Q
[11 TO DL 111R OF HRJ DECISION DALE COMPL.
BEAVER VALLEY 2 0
07/84 07/84 09/84 10/84 12/84 11/84 12/84 05/85 11/85 12/85 12/85 BELLEFONTE 1 0
12/83 06/84 08/84 09/84 05/84 10/84 12/84 N/A N/A 04/85 05/85 BRAIDWOOD 1 0
01/84 11/83C 12/83C 02/84 06/84 04/84 05/84 10/84 03/85 04/85 04/85 BYRON 1 0
11/8?C 01/82C 02/82C 03/82C 04/82C 08/82C 01/8 3C 03/33C 01/84 02/84 02/84 BYRON 2 0
11/81C 01/82C 02/82C 03/82C 04/82C 08/82C 02/84 03/83C 01/84 C4/85 05/85 CALLAWAY 1 0
09/81C 09/81C 10/81C 11/81C 01/82C 02/84 02/84 11/81C 10/83C 03/84 04/84 CATAWBA 1 0
08/82C 01/83C 02/83C 03/83C 01/83C 04/83C 05/83C 10/83C 04/84 05/84 05/84 CLINTON 1 0
12/81C 12/81C 02/82C 03/82C 05/82C 06/82C 05/83C 12/83 N/S 12/85 01/86 COMANCHE PEAK 1 7
05/81C 07/81C 07/81C 11/81C 09/81C 02/84 04/84 12/81C 07/84 07/84 12/83 COMANCHE PEAK 2 0
05/81C 07/81C 07/81C 11/81C 09/81C 02/84 11/84 12/81C 07/84 11/84 12/84 DIABLO CANYON 1 0
12/72C 01/75C 10/74C 07/76C 05/76C 06/83C 12/83 12/76C N/S DIABLO CANYON 2 0
12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C N/S ENRICO FERMI 2 0
04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/82C 10/82C 06/84 06/84 GRAND GULF 1 0
05/81C 08/81C 09/81C 10/81C 10/81C 12/83 01/84 N/A N/A 01/84 06/82C HARRIS 1 0
04/83C 11/83C 11/83C 01/84 10/83C 03/84 04/84 01/84 05/85 05/85 06/85 LASALLE 2 0
03/78C 02/81C 03/81C 04/81C 11/78C 12/83C 11/83C N/A N/A 12/83 12/83 LIMERICK 1 7
06/83C 08/83C 08/83C 10/83C 03/84 11/83C 12/83 12/83C 03/85 03/85 08/84 MIDLAND 1 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 11/83C 11/82C 10/85 10/85 02/85 MIDLAND 2 0
02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 11/83C 11/82C 10/85 10/85 10/84 MILLSTONE 3 0
04/84 05/84 07/84 08/84 11/84 10/84 11/84 N/A N/A 11/85 11/85 PALO VERDE 1 0
10/81C 10/81C 11/81C 12/81C 03/82C 09/83C 02/84 04/82C 12/82C 04/84 05/84 PALO VERDE 2 0
10/81C 10/81C 11/81C 12/81C 03/82C 09/83C 12/84 04/82C 12/82C 01/85 02/85 PERRY 1 0
02/82C 05/82C 05/82C 07/82C 08/82C N/S 01/84 05/83C 06/84 11/84 12/84 RIVER BEND 1 0
01/84 12/83 12/83 01/84 06/84 04/84 05/84 10/84 03/85 04/85 04/85 SEABROOK 1 O
05/82C 12/82C 03/83C 04/83C 12/82C N/S N/S 08/83C 09/84 09/84 09/84 SHORENAM 0
03/77C 03/81C 04/81C 10/81C 10/77C 12/83 09/83C 05/82C N/S 05/84 05/84 SUSQUEHANNA 2 0
03/81C 03/81C 04/81C 08/81C 07/81C 02/83C 01/84 10/81C 04/82C 02/84 02/84 WASHINGTON NUCLEAR 2 0
07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 05/83C N/A N/A 12/83 12/83 WATERFORD 3 0
05/81C 05/81C 07/81C 08/81C 09/81C 05/83C 07/84 08/83C 05/83C 04'84 05/84 WATTS BAR 1 0
06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 12/83 N/A N/A 03/84 04/84 WATTS BAR 2 0
04/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/85 N/A N/A 09/85 10/85 WOLF CREEK 1 0
01/82C 03/82C 04/82C 05/82C 06/82C 10/83 05/84 01/84 06/84 07/84 08/84 ZIMMER 1 0
10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C N/S 11/84 12/84 WLICENSING SCHEDULES AND DECISIDH DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.
n 1985 LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSUED AFTER CY ISSUE APPL. CONST.
PLANT life COMPLETE BELLEFONTE 2 03/86 05/86 BRAIDWOOD 2 02/86 04/86 CATAWBA 2 08/86 10/86 GRAND GULF 2 N/S N/S HARRIS 2 N/S 06/89 HOPE CREEK 1 02/85 01/86 LIMERICK 2 N/S 07/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 N/S 12/87 HINE MILE POINT 2 01/85 02/86 PALO VERDE 3 03/86 05/86 PERRY 2 H/S 11/91 N/S RIVER BEND 2 SEABROOK 2 N/S 12/86 SOUTH TEXAS 1 01/86 t2/86 SOUTH TEXAS 2 N/S 12/88 V0GTLE 1 09/85 09/86 03/88 V0GTLE 2 WASHINGTON HUCLEAR 1 N/S N/S WASHINGTON HUCLEAR 3 12/84 06/87 kJ
+
6 LICENSING SCHEDULES FOR ALL PENDIHG CP APPLICATIONS REPORT AS OF 11/30/83 (LISTED IN ORDER OF FACILITY HAME)
SER SSER STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.
PLANT RE1 TO DL LF2 tilQ ffd TO DL 11B 0F HRG DECISION RA_T E CLINCH RIVER 02/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83C 08/82C 04/84 06/84 i
i
NEW APPLICATIOM F 0 R E C A S T --- 0 P E R A T I N G LICENSE REVIEW 5 (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)
AS OF WEEK ENDING 11/30/83 NONE
i NEW APPLICATION F0RECA5T-5PECIAL REVIEW AS OF WEEK ENDING 11/30/83 STANDARDIZA TION REVI EWS PROJ PROJECT TENDER EROJECT NO APPLICANT EN A GER D A_lf (NSS)WAPWR 668 WESTINGHOUSE G.NEYER 10/24/83C
C0MM0N ABBREVIAT IONS USED WITH IN THE PUBLICA TIDN l
ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:
LICENSING ASSISTANT I
AE:
ARCHITECT /ENGINEF4 LESR LIMITED EARLY SITE REVIEW (ALSO ABBREVIATEG LES)
AEB:
ACCIDENT EVALUA110N BRANCH LGB:
LICENSING GUIDANCE BRANCH ASB AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOMIC SAFETY LICENSING BOARD LQB:
LICENSEE QUALIFICATIONS BRANCH B8R:
BURNS 8 ROE MEB:
MECHANICAL ENGINEERING BRANCH B8V:
BLACK 8 VEACH METB: METEOROLOGY 8 EFFLUENT TREATMENT SYSTEMS BRANCH B8W:
BABCOCK 8 WILCOX MTEB: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE:
MEGAWATTS ELECTRIC BRRT: BROWN 8 ROOT MWT:
MEGAWATTS THERMAL BWR BOILING WATER REACTOR NSSS: HUCLEAR STEAM SYSTEMS SUPPLIER COMB: COMBUSTION ENGINEERING OL:
OPERATING LICENSE CMEB: CHEMICAL ENGINEERING BRANCH OLB:
OPERATOR LICENSING BRANCH CP:
CONSTRUCTION PERMIT CPB:
CORE PERFORMANCE BRANCH CSB CONTAINMENT SYSTEMS BRANCH CWE:
COMM0HWEALTH EDISON PDA:
PRELIMINARY DESIGN APFROVAL PG8E PACIFIC GAS 8 ELECTRIC DES:
DRAFT ENVIRONMENTAL STATEMENT PID:
PARTIAL INITIAL DECISION PM:
PROJECT MANAGER PS:
POWER SYSTEMS BRANCH EHEB ENVIRONMENTAL 8 HYDROLOGIC ENGINEERING BRANCH PSAR: PRELIMINARY SAFETY ANALYSIS REPORT EPA:
ENVIRONMENTAL PROTECTION AGENCY PTRB: PROCEDURES AND TEST REVIEW BRANCH EPLB EMERGENCY PREPAREDHESS LICENSING BRANCH FWR:
PRESSURIZED WATER REACTOR ER:
ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH l
RAB RADIOLOGICAL ASSESSMENT BRANCH l
l RM:
RESOURCE MANAGEMENT F.R.:
FEDERAL REGISTAR RRAB RELIABILITY 8 RISK ASSESSMENT BRANCH FDA:
FINAL DESIGN APPROVAL RSB:
REACTOR SYSTEMS BRANCH FES:
FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT SAL:
SARGENT 8 LUNDY S8W:
STONE 8 WEBSTER SABR: SITING ANALYSIS BRANCH G8H:
GIBBS 8 HILL SAR:
SAFETY ANALYSIS REPORT GHDRs GIBBS & HILL SDA STANDARD DESIGN APPROVAL GIB:
GENERIC ISSUES PRANCH SGEB STRUCTURAL 8 GE0 TECHNICAL ENGINEERING BRANCH GIL:
GILBERT COMMONWEALTH SER:
SAFETY EVALUATIDH REPORT GSB GEOSCIENCES BRANCH SIB SYSTEMS INTERACTION BRANCH SPC:
SPECIAL PROJECT
-HFEB HUMAN FAC? ORS ENGINEERING BRANCH SPEB SAFETY PROGRAM EVALUATIDH BRANCH HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSC:
SOUTHERN SERVICES COMPANY SSER: SUPPLEMENT TO SAFETY EVALUATION ICB INSTRUMENTATION AND CONTROL BRANCH TVA:
TENNESSEE VALLEY AUTHORITY UEC:
UNITED ENG. 8 CONSTRUCTORS UFB:
UTILITY FINANCE BRANCH WEST: WESTINGHOUSE
_.m..a-,.
4
,-An 4
2a--
a.
f I
1 M
M 2
O M
b U
laJ to J
4 a
I l
., =
. _.. - _ _ - - - - - ~ _. - _.. _. -..
PR0 JECT INDEX SECTION II OPERATING LICENSE REVIEW CONSTRUC110N PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS I
(
2-1 BEAVER VALLEY 2 2-35 CLINCH RIVER 2-36 (HSS)CESSAR SYSTEM 80 2-2 BELLEFONTE t 82 2-37 (NSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD t 82 2-4 BYRON 1 8 2
~
2-5 CALLAWAY t 2-6 CATAWBA 1 82 2-7 CLINTON 1 2-8 COMANCHE PEAK 1 82 2-9 DIABLO-CANYOH 1 82 j
2-10 ENRICO FERMI 2
[
2-11 GRAND GULF 1 82 2-12 HARRIS 1 82 l
2-13 HOPE CREEK 1 2-14 LASALLE 2 2-15 LIMERICK 1 82 2-16 MARBLE HILL 1 82 2-17 MIDLAND 1 82 2-18 MILLSTONE 3 2-19 HINE MILE POINT 2 2-20 PALO VERDE 1,2,3 2-21 PERRY 1 82 2-22 RIVER BEND t 82 2-23 SEABROOK 1 82 2-24 SHOREHAM 2-25 SOUTH TEXAS 182 2-26 $USQUEHANNA 2 2-27 V0GTLE 1 82 t
2-28 WASHINGTON NUCLEAR 1 2-29 WASHINGTON NUCLEAR 2 2 30 WASHINGTON NUCLEAR 3 2-31 WATERFORD 3 2-32 WATTS BAR 1 82 2-33 WOLF CREEK 1 2-34 ZIMMER 1 l
s
u
/
z NRR LICENSING SYSTEM PAGE NO 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REPORT REPORT AS OF 11/30/83 PLANT C H A R A C T E R I 5 T I C S:
KEY PERS0NNEL DOCKET NO 05000412 LIC. PM:
L. LAZO ASLB CHAIR: N/A APPLICANT:
DUQUESNE LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
LOCATION:
5 MI E OF E. LIVERP30L. DH LIC.
LA.'
E. HYLTON MEMBER 2:
REGIDH:
1 AE:
58W COUNSEL:
R.
PALLA CONST. INSP: S. FOLSON REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP:
DESIGN PWR: 2774 MWT/0852 MWE CONST: 58W RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-26-23.
The SAR was docketed on 05/18/83.
ER DOCKETED:
05/18/83 05/18/83C ER SITE VISIT COMPLETE:
09/29/83 09/29/83C INPUT TO DES TO PM:
05/25/84 ISSUE DES:
07/27/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
12/31/84 CURRENT ENV. STATUS:
The ER was tendered on 01-26-83.
The ER was docketed on 05/18/83.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
01/26/83 01/26/83C SAR DOCKETED:
05/18/83 05/18/83C SAR Q'S RECEIVED BY PM:
12/00/83 SAR APPL. RESPONSE TO Q'S RECEl'4ED: 02/10/84 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/27/84 Opportunity for Hearing was published in the Federal ISSUE DRAFT SER:
02/24/84 Register on June 1 1983.
INPUT TO SER:
07/27/84 ISSUE SER:
09/28/84 ACRS FULL COMMITTEE MEETING:
10/31/84 INPUTS TO SE SUPFLEMENT 1:
11/00/84 ISSUE SE SUPPLEMENT 18 12/31/84 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
The information for antitrust review of operating HEARING STARTED:
05/31/85 license application was tendered 12/15/82.
ASLB INITIAL D7 CISION:
11/29/85 COMMISSION EFFECTIVENESS DECISION:
ft/00/85 TECH SPECS COMPLETED:
12/00/85 COMMISSION DECISION:
12/00/85 LATEST AMENDMENT:
ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE
. CONSTRUCTION COMPLETION - APPL.:
12/31/85 07/30/82
.- =
. - _ - _ - _ _ ~
NRR L ICENSING SYST EM PAGE NO: 2-2 GELLEFONTE 1 82 0L CURR ENT STATUS REPDRT REPORT AS OF: 11/30/83 PLANT CHARACTER IST I C S:
K EY PER S O N N E L:
DOCKET NO:
043880439 LIC, PM:
. UNASSIGNED ASLB CHAIR: N/A APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E.
ADENSAM NEMBER 1:
N/A LOCATION:
6 MI NE OF SCOTTSDORD. ALA LIC. LA.
M.
DUNCAN MEMBER 2:
N/A REGION:
2 AF:
TVA COUNSEL:
- 3. PATON CONST. INSP:
R.
CRLENJAK j
REAC. TYPE: PWR NSSS: B8W ANTITRUST:
J. RUTBERG RESID. INSP:
J. WILCOX DESIGN PWR: 3760 MWT/1235 MWE CONST: TVA RM ANALYST:
8.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the staff review schedule has been delayed and the applicant has ER DOCKETED:
06/12/78 06/12/78C revised the fuel loading to 05/85.
The staff evaluated ER SITE VISIT COMPLETE:
02/20/82 06/17/82C the impacts of this delay on the safety and environmental INPUT TO DES TO PM:
11/04/83 l
review schedules and issued a new schadule or 01/25/83.
ISSUE DES:
12/16/83 RESPONSE TO COMMENTS ON DES:
03/05/84 ISSUE FES:
05/18/84 CURRENT ENV. STATUS:
As a result of applicant's construction delay, the environ-mental review schedule was re-evaluated and revised as SAFETY / HEARING MILESTONES:
indicated in the environmental milcstones. The environmental site visit was completed on 6/17/82.
APPLICATION TENDERED:
02/03/78 02/03/78C SAR DOCKETED:
06/12/78C SAR Q'S RECEIVED BY PM:
07/03/80 11/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/02/83 CURRENT HRG STATUS:
INPUT TO DRAFT SER TO PM:
01/20/84 No hearing is anticipated.
ISSUE DRAFT SER:
03/16/84 INPUT TO SER:
06/15/84 ISSUE SER:
08/17/84 ACRS FULL COMMITTEE MEETING:
09/28/84 INPUTS TO SE SUPPLEMENT 1:
10/05/84 ISSUE SE SUPPLEMENT 1:
12/14/84 i
FEMA LETTER RECEIVED:
e CURRENT ANTITRUST:
Pending determination HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
02/01/85 COMMISSION DECISION:
04/15/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
05/00/85 No. 23 (12/17/82).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
On 07/06/82 TVA revised fuel load date to 5/85.
Staff CONSTRUCTION COMPLETION - APPL.'
05/00/85 07/06/82 evaluated impact on safety and nnvironwental review schedules and issued new sched/le on Oi/25/83
HRR L ; CENSING SYSTEM PAGE NO 2-3 BRAIDWOOD 1 82 0L CUkRENT STA TUS REPOR T REPORT AS OF: 11/30/83 PLANT CHARACTERIS1 I C Sr KEY P E R S 0 N N E L:
t DOCKET NO:
045680457 LIC. PM:
J. STEVENS ASLB CHAIR:
M. MILLER APPLICANT:
COMMONWEALTH EDISON LIC. BC:
J.
YOUNGBLOOD MEMBER 1:
R. COLE LOCATION:
24 MI SSW OF JOLIET. ILL LIC. LA.
M.
RUSHBROOK MEMBER 2:
D. CALLIHAN REGION:
3 AE 58L COUNSEL:
E. CHAN CONST. INSP: J. NEISLER l
REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: L. MCGREGOR DESIGN PWR: 3425 MWT/1120 MWE CJNST CWE RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Final SER was issued on December 1,
1885.
ER DOCKETED:
11/30/78C ER SITE VISIT COMPLETE:
05/31/83 05/05/83C INPUT TO DES TO PM:
12/01/83 ISSUE DES:
01/03/84 RESPONSE TO COMMENTS ON DES:
04/15/84 ISSUE FES:
06/00/84 CURRENT ENV. STATUS:
Site visit was conducted during Msy, 1983.
Amendment 4 to ER submitted during October, 1983.
Public peeting neId SAFETY / HEARING MILESTONES:
during August, 1983.
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:
12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 05/06/83C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/01/83 06/15/83C Opportunity for Hearing was published in the Federal ISSUE DRAFT SER:
07/15/83 07/15/83C Register on 06/13/79.
There will be a contested hearing.
INPUT TO SER:
11/01/83 11/01/83C ISSUE SER:
12/01/83 12/01/83C ACRS FULL COMMITTLE MEETING:
02/00/84 INPUTS TO SE SUPPLEMENT 1:
04/01/84 ISSUE SE SUPPLEMENT 1:
05/00/84 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Applicant has submitted antitrust information pursuent to HEARING STARTED:
1C/00/84 Reg. Guide 9.3.
ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:
04/00/85 COMMISSION DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 FSAR Amendment No. 43; ER Amendment No. 4.
NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.:
04/00/85 04/14/82
HRR LICEHSIHG SYST EM PAGE NO: 2-4 BYRON 1 82 0L C U R R F. H T STATUS REPORT REPORT AS OF: 11/30/83 P L A N'T**'C*H A R A C'T E R I S T I C S:
KEY P E R S 0 N H E L:
DOCKET HO:
045480455 LIC. PM:
L. OLSHAN ASLB CHAIR:
I. SMITH APPLICANT COMM0HWEALTH EDISON LIC. BC YOUNGBLOOD MEMBER 1:
R. COLE LOCATION:
17 MI SW OF ROCKFORD, ILL LIC. LA.:
M. RUSHBROOK MEMBER 2:
D. CALLIHAN REGION:
3 AE:
58L COUNSEL:
R.
RAWSON C0HST. IHSP: M. RING REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP: J. HINDS DESIGH PWR: 3425 MWT/1120 MWE CONST CWE RM ANALYST:
S. HEDLUND ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:
SER and Supplements 1, 2. and 3 have been issued.
11/30/78C Several outstanding and confirmatopy issues remain to ER DOCFETED:
ER SITE VISIT COMPLETE:
05/31/81 05/31/81C be resolved prior to licensing.
INPUT TO DES TO PM:
08/15/81 08/15/81C ISSUE DES:
11/05/81 11/05/81C RESPONSE TO COMMENTS CH DES:
03/01/82 03/01/82C ISSUE FES:
04/05/82 04/05/82C CURRENT ENV. STATUS:
Environmental review completed and TES (HUREG-0848)
SAFETY / HEARING MILESTONES:
published in April 1982.
APPLICATION TENDERED:
06/26/78 06/26/78C SAR DOCKETED:
11/00/78 11/30/78C SAR O'S RECEIVED BY PM:
08/15/81 08/15/8tC SAR APPL. RESPONSE TO Q'S RECEIVED: 10/15/81 10/15/81C INPUT TO DRAFT SER 10 PM:
11/07/81 11/07/81C CURRENT HRG. STATUS:
Hearing began March 1, 1983.
Hearing c,oncluded on ISSUE DRAFT SER:
INPUT TO SER:
01/07/82 01/07/82C August 12, 1983.
ISSUE SER:
02/07/82 02/07/82C ACRS LETTER RECEIVED:
03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 28 08/20/82 08/20/82C ISSUE SE SUPPLEMENT 2:
12/10/82 01/31/83C FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
Applicant has submitted antitrust information pursuar.t HEARING STARTED:
03/00/83 03/01/83C ASLB IHITIAL DECISIDH 01/00/84 to Req. Guide 9.3.
COMMISSION EFFECTIVENESS DECISIDH: 02/00/84 TECH SPECS COMPLETED:
01/00/84 COMMISSION DECISI0H:
02/00/84 ISSUE LIC. WITH POWER RESTRICTIDH ISSUE FULL POWER LICENSE AMEND:
02/00/84 LATEST AMENDMENT:
FSAR - Amendment 43 SCHED. DATE RECEIPT DATE ER - Amendment 4 HEW SLIPS /HOTES:
CONSTRUCTIDH COMPLET10H - APPL.
02/15/84 09/23/83
~
NRR L ICENSING SYST EM PAGE NO:
2-S CALLAWAY 1 h L CURPLNT STATUS REPORT REPORT AS OF: 11/30/83 PLANT CHARA C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000483 LIC. PM:
J. HOLONICH ASLB CHAIR:
J. GLEA50H APPLICANT:
UNION ELECTRIC LIC. BC:
B. YOUNGBLOOD MEMBER 1:
G.
BRIGHT LOCATION:
10 MI SE OF FULTON. MO LIC.
LA.'
N.
RUSHBROOK MEMBER 2:
J.
KLINE REGION:
3 AE:
BECH COUNSEL:
B. PERLESS CONST. INSP:
J. KONKLIN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: J. NEISLER DESIGN PWR: 3425 MWT/ttS8 NWE CONST' DANIEL RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SAR was docketed 08/08/80.
The SER was issued by HRC on 10/07<81 and the SER Supplement N9.
I was issued on ER DOCKETED:
12/12/80 12/12/80C 01/1S/82.
SSER 2 was issued 6/28et.1 SSER 83 is ER SITE VISIT COMPLETE:
12/00/81 12/00/8tC tentatively scheduled for February 1984.
INPUT TO DES TO PM:
08/01/81 08/05/81C ISSUE DES:
09/29/81 09/29/8tC RESPONSE TO COMMENTS ON DES:
12/01/81 12/Ot/81C ISSUE FES:
01/29/82 01/29/82C CURRENT ENV. STATUS:
ER was docketed 12/ 12/80.
The DES was isrued by HRC on 09/29/81 and the FES was i ssued on 01/2 7/d2.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
10/2S/79 10/2S/79C SAR DOCKETED:
08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:
12/18/80 12/18/80C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Hearings were held on limited issues 18/81 A decision ISSUE DRAFT SER:
N/A was rendered by board 12/13/82. Joint intur6enors appealed INPUT TO SER:
09/11/81 09/tt/8tC the initial decision on 9/14/83.
ASIAB ruled for ISSUE SER:
10/07/81 10/07/81C applicants. Joint intervenors' motion for recensidaraticn ;
of that decision is pending before the ASLA8. Heaririq ACRS LETTER RECEIVED:
11/19/81 11/19/8tC on emergency preparedness was completed 9/13/83.
On INPUTS TO SE SUPPLEMENT 38 02/23/84 10/31/83 the Board ruled in favor of +.he applicant on ISSUE SE SUPPLEMENT 3:
02/00/84 emergency preparedness i ssues.
All hearings are completed.
FEMA LETTER RECEIVED 11/00/83 CURRENT ANTITRUST:
OL review is in progress.
HEARING STARTED:
11/17/81 11/17/81C ASLB INITIAL DECISION:
10/31/83 10/31/83C COMMISSION EFFECTIVENESS DECISION: 03/00/84 TECH SPECS COMPLETED:
02/00/84 COMMISSION DECISION:
03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 Snupps FSAR - No. 12; Callaway Site Addendum Rev. 12 NEW SLIPS / MOTES:
SCHED. DATE RECEIPT DATE
-.The Caseload Forecast Panel is reviewing construction CONSTRUCTION COMPLETION - APPL.:
04/00/84 09/12/83 progress in order to make a new cor,struction completion schedule estimate. April 1984 is astimated by the anolicant.
NRR LICEHSIHG SYSTEM PAGE HO: 2-6 CATAWBA 1 82 0t CURREHT STATUS REP 0RT REPORT AS OF 11/30/83 PLANT "CHARACT ER IST ! C St KEY PERS0HHEL:
DOCKET NO:
041380414 LIC. PM:
K.
JABBOUR ASLB CHAIR:
J. KELLEY APPLICANT:
DUKE POWER LIC. BC:
E. ADENSAM MEMBER 1:
P. PURDOM LOCATION:
6 MI NHW OF ROCK HIIL. SC LIC. LA.:
M.
DUNCAN MEMBER 2:
R.
FOSTER REGION:
2 AE2 DUKE COUNSEL:
G. JOHHSON CONST. INSP: P. VAND00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP P. SKINNER DESIGN PWR 3582 MWT/1145 MWE CONSf: DUKE RM ANALYST:
L.
LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTOHES:
SCHED. DATE ACTUAL DATE SER was issued on February 9, 1933.
SSER 01 vas issued on May 2, 1983.
ER DOCKETED:
06/11/81 06/11/81C ER SITE VISIT COMPLETE:
10/15/81 10/15/81C INPUT TO DES TO PM:
06/25/82 07/29/82C ISSUE DES:
08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:
11/30/82 11/30/82C ISSUE FES:
01/07/83 01/07/83C CURRENT ENV. STATUS:
DES was issued on 08/11/82.
FES was issued en 1/7/83.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
03/26/79 03/26/79C SAR DOCKETED:
06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:
12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATUS:
IHPUT TO DRAFT SER TO PM:
07/02/82 12/30/82C Combined hearing started on October 4, 1983.
ISSUE DRAFT SER:
11/f9/82 11/19/82C IHPUT TO SER:
01/09/83 01/19/83C ISSUE SER:
02/06/83 02/09/83C ACRS LETTER RECEIVED:
03/18/83 03/18/83C IHPUTS TO SE SUPPLEMENT 1:
04/12/83 04/12/83C ISSUE SE SUPPLEMENT 12 05/02/83 05/02/83C FEMA LETTER RECEIVED:
12/15/83 l
CURRENT ANTITRUST:
Operating license antitrust review is in progress.
HEARING STARTED 10/04/83 10/04/83C ASLB INITIAL DECISION:
04/00/84 COMMISSION EFFECTIVENESS DECISION: 05/00/84 TECH SPECS COMPLETED:
05/00/84 l
COMMISSIDH DECISION:
05/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICFNSE AMEND:
05/00/84 Revision 7 dated 03/22/83.
SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:
l CP Amend. issued 12/23/80 indicating change in ownership.
CONSTRUCTION COMPLETI0H - APPL.:
05/00/84 05/00/82 I
l
NRR L ICENS ING SYST EM PAGE NO 2-7 CLINTPN 1 0L CURR EN T STA TU$
R EPQR T REPORT AS OF: 11/30/83 P L ANT CHARA CTERI ST I C R:
K EY P ERS0NN E L:
DOCKET NO:
0$000461 LIC. PM:
G.
HARRISON ASLB CHAIR:
H.
CLARK APPLICANT:
ILLINDIS POWER LIC. BC:
A.
SCHWENCER MEMBER 1:
G.
FERGUSON LOCATION:
6 MI E OF CLINTON, ILL LIC. LA.
E.
HYLTON MEMBER 2:
O. PARIS REGION:
3 AE:
58L COUNSEL:
R.
GODDARD CONST. INSP:
F.
JABLONSKI REAC. TYPE: BWR NSSS: CE ANTITRUST:
B.
V0GL ER RESID. INSP:
H.
LIVERMORE DESIGN PWR: 2894 MWT/0950 MWE CONST: bat.9 WIN RM ANALYST:
8.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed 09/08/80.
SETt was issued 02/17/82.
Supplement No. 1 was issued 07/22/82.
SSER No. 2 was ER DOCKETED:
03/01/81 09/08/80C issued in May 1983.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
12/08/81 12/08/81C ISSUE DES:
12/18/81 12/28/81C RESPONSE TO COMMENTS ON DES:
02/22/82 03/25/82C ISSUE FES:
05/20/82 05/20/82C CURRENT ENV. STATUS:
The draft environmental statement was completed December 1981.
The FES was completed May 19?2.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/01/79 12/01/79C SAR DOCKETED:
09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
A third prehearing conference was neld June 2, 1983.
Five ISSUE DRAFT SER:
contentions are admitted.
Hearing estimated to start in INPUT TO SER:
12/05/81 12/05/81C late 1983 or early 1984.
Awaiting Board order.
ISSUE SER:
01/05/82 02/17/82C ACRS LETTER RECEIVED:
02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 2:
06/30/82 06/30/82C ISSUE SE SUPPLEMENT 2:
05/20/83 05/27/83C FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Operating license antitrust review campIsted HEARING STARTED:
12/00/83 March 18, 1982 (SECY-82-120).
ASLB INITIAL DECISION:
N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:
11/00/85 COMMISSION DECISION:
12/00/85 LATEST AMENDMENT:
ISSUE LIC. WITH PCWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
04/00/86 FSAR Amendment 827, 10/83.
~ NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE A two year slip in fuel load date t9 1/86 was announced by CONSTRUCTION COMPLETION - APPL.'
01/00/86 05/24/83 IPC on 05/24/83.
HRR L ICEHSIHG SYSTEM PAGE HO: 2-8 COMANCHE PEAK 1 &2 0L CURREHT STATUS REPORT REPORT AS OF 11/30/8' PLAHT CHARACTER ISTICS:
KEY P E R S 0 H H E L:
DOCKET NO:
044540446 LIC. PM:
S. BURWELL ASLB CHAIR:
P. BLOCH APPLICANT:
TEXAS UTILITIES GENERATING LIC. BC:
B. YOUNGBLOOD MEMBER 1:
W. JORDAN LOCATION:
4 MI N OF GLEN ROSE. TEX LIC. LA.:
M. RUSHBROOK MEMBER 2:
K. MCCOLLOM REGION:
4 AE2 G8H COUHSEL:
M. ROTHSCHILD CONST. INSP R.
TAYLOR REAC. TYPE: PWR HSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP D. KELLEY DESIGH PWR: 3411 MWT/1150 MWE C0HST: BRRT RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued 07/14/81 The staff deferred scheduling the Comanche Peak review by the ACRS until sufficient ER DOCKETED:
01/19/79 01/19/ 7 9C information was provided to resolve a large number of open ER SITE VISIT COMPLETE:
06/20/80 08/07/80C issues.
SSER 81 was issued 10/16/81.
Application was INPUT TO DES TO PM:
08/15/80 04/27/81C reviewed by the ACRS on 11/13/81.
SSER 82 responding to ISSUE DES:
04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 containing RESPONSE TO C0hMENTS ON DES:
07/19/81 08/28/81C emergency preparedness was issued 03/11/83.
ISSUE FES:
09/18/81 09/24/81C CURRENT ENV. STATUS:
The DES was issued on 05/22/81.
The EPA Federal Register Hotice was printed on 05/29/81 and the co*m9nt period SAFETY / HEARING MILESTONES:
ended 07/13/81.
The FES was issued on 09/24/81.
APPLICATION TENDERED:
03/01/78 03/01/78C SAR DOCKETED:
05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:
12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/13/79 03/11/81C Hearing began 12/02/81 Issues heard wece finaacial ISSUE DRAFT SER:
03/31/81 03/31/81C qualifications and operating GA program.
Further hearing INPUT TO SER:
05/22/81 07/08/81C sessions on QA/QC during construc. tion were held 06/07-11/82, ISSUE SER:
07/14/81 07/14/81C 07/26-30/82, and 09/13-17/82.
The fi 5b *nd sixth hearing session on QA/QC during construction and emergency ACRS LETTER RECEIVED:
11/17/81 11/17/81C preparedness were held 5/16-20 and 4/13-h/83.
The seventh INPUTS TO SE SUPPLEMENT 5:
02/00/84 hearing session on QA/QC during const, was haid 10/17 '8/83.
ISSUE SE SUPPLEMENT 5:
03/00/84 The emeroency preparedness contention w4s Ji* missed.
FEMA LETTER RECEIVED:
02/00/84 CURRENT ANTITRUST:
ALJ appointed on 02/23/82 to replaca ASL6.
Prehearing HEARING STARTED:
12/02/81 12/02/81C conference held 04/13/82 to determine s+
tos of parties.
ASLB INI'~4L DECISIDH:
07/00/84 Briefs filed 05/04/82 request immediate impasition of COMMISSIv.. EFFECTIVENESS DECISIDH: 07/00/84 settlement license conditions. A Nemorander and Order TECH SPECS COMPLETED:
12/00/83 approving settlement agreements 8 peoposed license COMMISSION DECISION:
07/00/84 conditions & dismissing proceedings was issued 05/06/82.
ISSUE LIC. WITH POWER RESTRICTION:
12/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/83 45 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
SSER-4 was issued 11/23/33.
CONSTRUCTION COMPLETION - APPL.:
12/00/83 07/08/83
i l
I I
l NRR LICENSING SYST EM PAGE NO: 2-9 l
DIABLO-CANYON 1 82 0L CUPRENT STA TUS REPORT REPORT AS OF: 11/30/83 PLANT CHARACTERISTICSt KEY PERS0NNELI DOCKET NO:
027580323 LIC. PM:
H.
SCHIERLING ASLB CHAIR:
J. WOLF APPLICANT:
PACIFIC GAS 8 ELECTRIC LIC. BC:
G. KNIGHTON MEMBER 1:
J.
KLINE LOCATION:
12 MI WSW OF SAN LUIS OBISPO LIC.
LA.+
J.
LEE MEMBER 2:
G. BRIGHT REGION:
5 AE:
PG4E COUNSEL:
L. CHANDLER CONST. INSP:
D. KIRSCH REAC. TYPE: PWR NSSS: NEST ANTITRUST:
J.
RUTBERG RESID. INSP J. CARLSON DESIGN PWP: 3338 MWT/1084 MWE CONST: PG;E RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Low power license for unit 1 was issued 09/22/81 cnd suspended on 11/19/81 as a result of design error.
Design ER DOCKETED:
11/09/71 11/09/71C verification program was concluded, campleted in November ER SITE VISIT COMPLETE:
1983, and SSERs 18 and 19 were issued. Conci ssion reinsta+ed INPUT TO DES TO PM:
10/09/72 10/09/72C authority for fuel load and cold system testing on 11/ 9 9/ A 3.
ISSUE DES:
12/12/72 12/12/72C Licensee completed fuel load 11/20/83.
Staff is to issua RESPONSE TO COMMENTS ON DES:
04/27/73 04/27/73C SSER regarding criticality and low power operation and ISSUE FES:
09/15/75 05/28/76C resolution of open items. Staff is evaluating numerous 1
allegations regarding construction and cesign of Units 1 and 2.
CURRENT ENV. STATUS:
Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
07/10/73 07/10/73C SAR DOCKETED:
10/02/73 10/02/73C SAR Q'S RECEIVED BY PM:
01/04/74 01/04/74C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/01/74 11/01/74C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/24/75 01/24/75C Favorable ASLB Initial Decision +or full power licenae was ISSUE DRAFT SER:
issued 08/31/83. However, in 4/63 ihe ASLAB reopened the INPUT TO SER:
01/24/75 01/24/75C record for the full power license to matters of design ISSUE SER:
10/04/74 10/16/74C quality assurance.
Hearings were crnducted October /
November 1983.
Evidentiary hearina on recnoninq +he record ACRS LETTER RECEIVED:
05/C0/78 07/18/78C on construction QA was completed 07/72/83; motion to reopen INPUTS TO SE SUPPLEMENT 9:
06/21/83 06/21/83C record on construction QA was danied.
ISSUE SE SUPPLEMENT 9:
12/00/83 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Not required HEARING STARTED:
10/29/75 12/07/76C ASLB INITIAL DECISION:
N/S COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
09/15/81 09/15/81C COMMISSION DECISIDH:
ISSUE LIC. WITH POWER RESTRICTION:
12/00/83 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/83 NEW SLIPS / MOTES:
SCHED. DATE RECEIPT DATE Additional SSERs are expected in support of criticality / low CONSTRUCTION COMPLETION.- APPL.:
power and full power authoriaation.
]
r HRR L ICEN5ING SYSTEM PAGE NO: 2-10 ENRICO FERMI 2 0t CURKEN T STATUS REPORT REPORT AS OFI 11/30/83
.a sti l
PLANT CHARACTERISTICS KEY P E R S 0 N N'E*Ee" DOCKET NO:
05000341 LIC. PM:
D. LYNCH ASLB CHAIR:
G. MILLHOLLIN APPLICANT:
DETROIT EDISDN LIC. BC:
J.
YOllNGBLOOD MEMBER 1:
P. MORRIS LOCATION:
LAGUNA BEACH, MICH LIC. LA.:
M.
RUSHBROOK MEMBER 2:
D. SCHINK REGION:
3 AE SSL COUNSEL:
C. WOODHEAD CONST. INSPs P. PELKE REAC. TYPE: BWR NSSS: GE ANTITRUST:
A.
H0DGDON RESID. INSP P.
BYRON DESIGN PWR: 3292 MWT/1093 MWE CONST: DANIEL RM ANALYST:
S. HEDLUND t
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
An interim SER was issued on 09-29-77 and a final SEk was issued on 07-10-81.
SSER No. I was issued 9-25-51.
ER DOCKETED:
04/04/75 04/04/75C SSER No. 2 was issued 1-29-82 with 7 prelicensing imsues ER SITE VISIT COMPLETE:
09/27/78 10/31/78C i
outstanding. SSER No. 3 was issued on 2-4-83.
The staff has INPUT TO DES TO PM:
07/31/81 04/24/81C i
requested that the standby liquid control system be ISSUE DES:
05/01/81 04/30/81C upgraded to conform to the Level 1 CA/QC program.
RESPONSE TO COMMENTS ON DES:
07/31/81 06/29/81C ISSUE FES:
08/31/81 09/04/81C i
CURRENT ENV. STATUS:
Addendum Ho. I to the FES was issueo 03-03-82.
SAFETY / HEARING MILESTONES:
l f
APPLICATION TENDERED:
10/22/74 10/22/74C SAR DOCKETED:
04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:
06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/24/75 03/08/76C l
A hearing on two issues began on 03+31-82 and ended on ISSUE DRAFT SER:
04-02-82.
Monroe County, Michigan petitioned for INPUT TO SER:
03/05/76 05/20/77C l
leave to reopen hearings on the ev.cuation issue cf ISSUE SER:
08/01/77 09/29/77C I
Emergency Prepardness; the Board denied this petitior..
ASLB issued initial decision on 10/29/82 authorizino ACRS LETTER RECEIVED:
08/20/81 08/11/81C operating license issuance. The Commission issued its INPUTS TO SE SUPPLEMENT 3 08/22/82 01/05/83C j
Immediate Effectiveness Decision on 12/22/82.
Ihe ISSUE SE SUPPLEMENT 38 09/01/82 02/04/83C i
Commi ssi on denied intervenor's appeal en 10/27/83 FEMA LETTER RECEIVED:
11/30/83 CURRENT ANTITRUST:
An ASLB decision on antitrust matters was issued on HEARING STARTED:
12/02/81 03/31/82C l
L 04-25-78.
ASLB INITIAL DECISION:
10/00/82 10/29/82C t
COMMISSION EFF%CTIVENESS DECISION: 12/22/82 12/22/82C l
TECH SPECS COMPLETED:
05/30/84 COMMISSION DECISION:
06/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/A
{
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/30/84 The latest final Safety Analysis Report Amendment ik number 1
51.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
06/00/84 11/29/83
+
1 4
h I
{
l NRR L ICENSING SYSTEM PAGE NO: 2-11 GRAND GULF t 82 LIC CURRENT STATUS RE"0RT REPORT AS OF: 11/30/83 PLAN I CHARACTER ISTIC5:
KEY PERS0N 1ELa DOCKET NO:
041680417 LIC. PM:
D. HOUSTON ASLB CHAIR:
J. LAURENSON APPLICANT:
MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:
A.
SCHWENCER MEMBER 1:
G.
BRIGHT LOCATION:
25 MI S OF VICKSBURG, MISS LIC. LA.:
E. HYLTON MEMBER 2:
J. HARBOUR 3
REGION:
2 AL:
RECH COUNSEL:
M. WAGNER CONST. INSP: R.
VANDORN REAC. TYPE: BWR HSSS: GE ANTITRUSf B. V0GLER RESID. INSP:
A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: DECH RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.
SSERs wers i s ved in December 1981, in June and July 19*2 and in May 1983.
ER DOCKETED:
06/05/78 06/30/78C The ACRS report on full power operation for Unit I was ER SITE VISIT COMPLETE:
t?/14/79C issued August 18, 1982.
Final FEMA letter was received INPUT TO DES TO PM:
04/30/81 04/30/8tc 06/29/83.
ISSUE DES:
05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:
08/15/81 08/tS/8tC NEW SLIPS (CONT.):
Also, FP delayed by Region II COA on the ISSUE FES:
09/15/81 10/09/81C recertification program for the operating staff.
CURRENT ENV. STATUS:
DES was issued in May 1981 FES 4ss issued October 9, 1981.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
04/28/78 04/28/78C SAR DOCKETED:
06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:
04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S Ho hearing. Petition was filed by the State of Lbaisiana on ISSUE DRAFT SER:
09/18/81C basis of Court of Appeals, District of Colembia, opinion on INPUT TO SER 04/01/81 08/14/81C S-3 Table issue.
Board denied petition for intervention on ISSUE SER:
06/00/81 09/10/81C 10/20/82. State of Louisianna filed an appeal to the Board's denial. Appeal Board upheld denial for in6ervention in &
ACRS LETTER RECEIVED:
07/08/81 08/18/82C decision issued 12/8/82. Intervenor filed peLition on INPUTS TO SE SUPPLEMENT 5 12/15/83 11/17/83 requesting hearing on Amendment to to the OL, whicn ISSUE SE SUPPLEMENT 5:
01/10/84 was issued 09/23/83.
FEMA LETTER RECEIVED:
04/00/83 06/29/83C CURRENT ANTITRUST:
OL review is in progress. No significant ch.c:qus have HEARING STARTED:
N/A occurred since the CP.
ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
09/01/81 06/16/82C COMMISSION DECISIGH:
01/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 NEW SLIPS /MOTF.S:
SCHED. DATE RECEIPT DATE Unit i OL for fuel load to 5% power iss. 6/16/82. FP delayed CONSTRUCTION COMPLETION - APPL.:
06/16/82C OL ISSUED by Region II COA on TS surveillance procedure dsficiencies 8 outst. Items, maint. 8 mods for tst refuel. outane. Licensee not readv to ao above S% until 1/84m (see Corr. Saf._ Status)
~
MRR LICENSING
$Y$ TEM PAGE HO 2-12 HARRIS 1 & 2 0L CURRENT STATUS REPORT REPORT AS OF 11/30/83
'u Liaon m
PLANT CHARACTERISTICSt KEY PERS0NHEL DOCKET H0:
0400-040i LIC. PM:
B. BUCKLEY ASLB CHAIR J. KELLEY APPLICANT:
CAROLINA POWER 8 LIGHT LIC. BC:
G. KNIGHTON MEMBER 1:
G. BRIGHT LOCATION:
20 MI SW OF RALEIGH, NC LIC.
LA.'
J.
LEE MEMBER 2:
J. CARPENTER REGION:
2 AE EBASCO COUNSEL:
C. BARTH CONST. INSP:
REAC. TYPE: PWR HSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP: G. MAXWELL DESIGN PWR: 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81. Questions were sent to the as plicant between 4/26/82 and 7/30/8?. Most of ER DOCKETED:
12/22/81 12/22/81C applican.'s responses were recei~cd b/ 08/31/82.
P-aft ER SITE VISIT COMPLETE:
04/08/82 04/08/82C SER issued 2/1/83.
Final SER was issued Novem4er 1983.
IHPUT TO DES TO PM:
01/14/83 02/08/83C ISSUE DES:
04/00/83 04/00/83C RESPONSE TO COMMENTS ON DES:
09'30/83 09/30/83C ISSUE FES:
10/31/83 10/31/83C CURRENT ENV. STATUS:
ER was docketed on 12/22/81 The site visit war complate on 04/08/82 and questions were sent to epolitani on SAFETY / HEARING MILEST0HES:
04/28/82. Most of the applicant's responsss were rec 6 ved by October 15, 1982.
Draf t Environmental Sta'.ement APPLICATION TENDERED:
06/26/80 06/26/80C was issued in April 1983.
Final Environmentsl Statement SAR DOCKETED:
12/22/81 12/22/81C was issued in October 1983.
SAR Q'S RECEIVED BY PM:
07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/08/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/15/82 12/22/82C Hotice for Opportunity for Hearino was published in the ISSUE DRAFT SER:
01/03/83 02/01/83C Federal Register on January 27, 1982.
Several petitions INPUT TO SER2 09/01/83 11/15/83C to intervene were filed.
Preheariaq corderence nn petitions ISSUE SER:
11/01/83 11/30/83C was held on July 13-14, 1982.
Board dweision en contentions issued September 23, 1982.
Furthee clarificalita isrued ACRS FULL COMMITTEE MEETING:
01/07/84 January 11, 1983.
A pre-hearing conference was held on INPUTS TO SE SUPPLEMENT 1:
03/01/84 February 24, 1983 on discovery and schedulin;q.
ISSUE SE SUPPLEMENT 1:
04/02/84 FEMA LETTER RECEIVED:
04/00/84 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
01/04/84 ASLB INITIAL DECISION:
05/01/85 COMMISSIDH EFFECTIVENESS DECISION: 05/00/85 TECH SPECS COMFLETED:
05/01/85 COMMISSIDH DECISIDH:
05/00/85 ISSUE LIC. WITH POWER RESTRICTION: 06/00/85 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/03/85 FSAR Ho. 10 ER Ho. 5 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:
Staff schedule based on fuel lord date of 66/02/85.
CONSTRUCTION COMPLETION - APPL.:
06/03/85 10/06/82
NR4 i ICEN$ING SYSTEM PAGE NO: 2-13 HOPE CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF: 11/30/83 PLANT CHARACTERISTICS:
KEY PERS0NNELa DOCKET NO:
05000354 LIC. PM:
D. WAGNER ASLB CHAIR:
M. MILLER APPLICANT:
PUBLIC SERVICE ELECTRIC 8 CAS LIC. BC:
A.
SCHWENCER MEMBER 1 P. MORRIS LOCATION:
18 MI SE OF WILMINGTON. DEL LIC.
LA.-
E. HYLTON MEMBER 2:
J. CARPENTER REGION:
1 AE:
PECH COUNSEL:
L. DEWEY CONST. INSP: W. BATEMAN REAC. TYPE: BWR NSSS: CE ANTITRUST:
RESID. INSP DESIGN PWR 3440 MWT/1067 MWE CONST: 8ECil RM ANALYST:
B.
ST MAJY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was tendered on March 2.
1983 and docketed on June 29, 1983.
ER DOCKETED:
06/29/83 06/29/83C ER SITE VISIT COMPLETE:
07/28/83 07/28/83C INPUT TO DES TO PM:
04/13/84 ISSUE DES:
06/15/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
11/16/84 CURRENT ENV. STATUS:
ER was tendered on March 2, 1983 and docketed on June 29, 1983.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/83 03/02/83C SAR DOCKETED:
06/29/83 06/29/83C SAR Q'S RECEIVED BY PM:
12/00/83 SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/23/84 Notice of Opportunity for Hearing was pus 11shed in the ISSUE DRAFT SER:
02/21/84 Federal Rooister on August 10, 1983.
INPUT TO SER:
08/20/84 ISSUE SER:
10/12/84 ACRS FULL COMMITTEE MEETING:
11/00/84 INPUTS TO SE SUPPLEMENT 18 01/01/85 ISSUE SE SUPPLEMENT 18 02/15/85 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
07/t5/85 ASLB INITIAL DECISION:
01/OC/86 COMMISSION EFFECTIVENESS DECISI0H: 01/00/85 TECH SPECS COMPLETED:
12/00/85 COMMISSION DECISION:
01/00/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/86 Amendment 82 submitted 10/31/83.
i HEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL..
01/14/86 06/30/82
- _ - - - - _ _ -=
~. -
r NRR 6 ICEHSIHG SYSTEM PAGE NO: 2-14 l
LASALLE 2 0L CURREH T STATUS REPORT REPORT AS OF: 11/30/83 i
PLANT CHARACTERISTICSt KEY P E R S 0 H H E L:
DOCKET NO OS000374 LIC, PM:
A.
BOURNIA ASLB CHAIR:
M. MILLER APPLICANT:
COMM0HWEALTH EDISOH LIC. DC:
A.
SCHWENCER PEMBER 1:
F. SHON LOCATION:
11 MI SE OF CTTAWA, ILL LIC. LA.:
E. HYLTON MEMBER 22
- 0. PARIS REGION:
3 AE S3L COUNSEL:
C. WOODHEAD CONST. INSP: H. WESCOTT REAC. TYPE: BWR NSSSt GE ANTITRUST:
B. V0GLER RESID. INSP: W. GULDEMOND DESIGH PWR: 3295 MWT/1078 MWE CONST: CWE RM ANALYST
- S. HE0LUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981 SSER-2 ws* issued in February 1982.
SSER-3 was issued on April 16, 1982.
ER DOCKETED:
01/17/77 OS/12/77C SSER-4 was issued on July 14, 1982.
SSER-S was i ssued ER SITE VISIT COMPLETE:
on August 17, 1983.
SSER 86 will be issued in November, INPUT TO DES TO PM:
02/17/78 02/17/78C ISSUE DES:
03/22/78 03/29/78C n
1983.
RESPONSE TO COMMENTS ON DES:
07/%/78 07/14/78C ISSUE FES:
09/22/78 11/03/78C 1
CURRENT ENV. STATUS:
Environmental Protection Plan has been issued with SAFETY / HEARING MILESTONES:
o Unit 1 license.
APPLICATION TENDERED:
09/01e76 09/01/76C SAR DOCKETED:
04/08/77 OS/12/77C SAR Q'S RECEIVED BY PM:
07/22/77 07/27/77C i
SAR APPL. RESPONSE TO Q'S RECEIVED: 12/1S/77 08/18/78C INPUT TO DRAFT SER TO PM:
10/06/78 11/08/78C CURRENT HRG. STATUS:
ISSUE DRAFT SER:
Ho hearing.
INPUT TO SER:
12/29/78 02/27/81C ISSUE SER:
09/05/8C 03/05/81C ACRS LETTER RECEIVED:
04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 6:
12/09/83 12/09/83C ISSUE SE SUPPLEMENT 6:
11/21/83 11/21/83C
[
FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
N/A Complete.
ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
12/00/83 COMMISSION DECISIDH:
12/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:
12/00/84 LATEST AMENDMENT:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Lasalle Unit I criticality was achieved on fune 21, 19?2.
CONSTRUCTIDH COMPLETION - APPL.:
12/00/83 10/11/83 Construction completion date for Unit 2 has been reastassed by applicant and has slipced to 11/83.
NRR L ICENSING SYSTEM PAGE NO: 2-15 LIMERICK 1 8 2 CL C U R P. E N T STATUS REP 0RT REPORT AS OF: 11/30/83 PLAN T CHARACT ER I ST I C St K EY P E R S O N N E L:
DOCKET NO:
035240353 LIC, PM:
R. MARTIN ASLB CHAIR:
L.
BRENNER i
APPLICANT:
PHILADELPHIA ELECTRIC LIC. BC:
A.
SCHWENCER MEMBER 1:
R.
COLE LOCATION:
35 MI NW OF PHILADELPHIA, PA LIC. LA.
E. HYLTON MEMBER 2:
P. MORRIS REGION:
1 AF:
BECH COUNSEL:
A.
HDDGDON CONST. INSP:
S.
CHAUDHARY REAC. TYPE: BWR HSSS: CE ANTITRUST:
B.
V0GLER RESID. INSP:
J. WIGGINS DESIGN PWR: 3440 MWT/1065 MWE C O?iS l i 3ECH RM ANALYST:
L.
LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981.
SAR w4s docketed on 07/21/81 ER DOCKETED:
07/27/81 07/27/81C HUREG/CR on PRA issued by Board Hotification en 0!/G4/83.
ER SITE VISIT COMPLETE:
08/20/82 08/20/82C SER issued on 08/31/83.
ACRS meeting held 14/13/83.
INPUT TO DES TO PM:
06/10/63 06/10/83C ISSUE DES:
06/24/83 06/24/83C RESPCNSE TO COMMENTS ON DES:
01/00/84 ISSUE FES:
03/00/84 CURRENT ENV. STATUS:
ER was docketed on 07/27/81 DES was issued m. June 24, 1983.
The second part will address impacts by sever.
SAFETY /HEARI.1G MILESTONES:
accidents and will be based on aprlicants nev9ro accidents ri sk assessment submi tted April 21, 1983.
APPLICATION TENDERED:
01/00/81 03/17/81C SAR DOCKETED:
07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:
07/08/82 02/01/83C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S Notice of Opportunity of Hearing was publishcd in the ISSUE DRAFT SER:
N/S Federal Register on August 21, 1981 A rpecial prehearing INPUT TO SER:
08/05/83 08/05/83C conference addressing conditionally admitted contentions ISSUE SER:
was held in October. Actions were spectfic9 by the Board 08/31/83 08/31/83C for all parties. Hearings on pipp'ine and cooling tower ACRS LETTER RECEIVED:
10/18/83 10/18/83C hazards will be held Dec. 12-16, 1983.
INPUTS TO SE SUPPLEMENT 1:
11/04/83 11/04/83C ISSUE SE SUPPLEMENT 1:
12/30/83 FEMA LETTER RECEIVED:
02/28/84 CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
12/12/83 12/12/83C ASLB INITIAL DECISION:
03/00/85 COMMISSION EFFECTI'/ENESS DECISION: 03/00/85 TECH SPECS COMPLETED:
03/00/85 COMMISSION DECISION:
03/00/85 ISSUE LIC. WITH POWER RESTRICTION: 03/00/85 LATEST AMENbMENT:
ISSUE FULL POWER LICENSE AMEND:
03/00/85 Rev. 15, August 31 1983 (ER OL), Rev. 25 Gctobsr 31, 1983 (FSAR): Rev. 6, September 30, 1973 (EP).
NEW SLIPS / NOTES:
SCHED. DATE RECEIPT DATE Applicant estimates construction complation by August 1,
CONSTRUCTION COMPLETION - APPL.:
08/01/84 10/25/83 1984 ASLB estimates that 17 months are neccesary for hearing.
~
~-
- - - ~
NRR L ICENSING SY$ TEM PAGE NO 2-16 MARBLE HILL 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/83 l
PLANT C N A R A C T E'R i S T I C St KEY PERS0NNEL DOCKET NO:
054680547 LIC. PM:
P. O CONNOR ASLB CHAIR I. SMITH APPLICANT:
PUBLIC SERVICE OF INDIANA LIC. BC:
J. YOUNGBLOOD MEMBER 1:
G.
LINENBERGER LOCATION:
-10 MI 5 0F MADISON, IN LIC. LA.:
M. RUSNBROOK MEMBER 23 0.
PARIS REGION:
3 AE:
S8L COUNSEL:
E. CHEN CONST. INSP P. PELKE REAC. TYPE: PWR NSSS: WEST ANTITRUST J. RUTBERG RESID. INSP: J. SCHAPKER DESIGN PWR: 3415 MWT/1130 MWE CONST PSI RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE
+
Application was docketed on 02/25/83.
ER DOCKETED:
03/01/83 02/25/83C ER SITE VISIT COMPLETE:
07/11/83 07/11/83C INPUT TO DES TO PM:
03/30/84 ISSUE DES:
05/30/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
11/30/84 l
CURRENT ENV. STATUS:
Application was docketed on 02/25/83. ER site visit SAFETY / HEARING MILESTONES:
completed on 07/11/83.
APPLICATI0H TENDERED:
12/01/82 11/23/82C SAR DOCKETED:
03/01/83 02/25/83C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 01/15/84 INPUT TO DRAFT SER TO PM:
03/02/84 CURRENT NRG. STATUS:
Three petitions were received. Board Memorandum 8 Order of ISSUE DRAFT SER:
04/06/84 provided two petitioners 30 days to file amended petitions.
INPUT TO SER:
10/05/84 j
The petitioners Valley Watch Inc. 8 Sassafres Audubon Soc.
ISSUE SER:
12/07/84 filed amended petitions on 7/26/83 4 7/21/83 respectively.
Board Memorandum 8 Order of 9/14/83 required petitioners to ACRS FULL COMNITTEE MEETING:
01/10/85 i
supplement petitions to include all contentions to be liti-INPUTS TO SE SUPPLEMENT 1:
03/01/85 qated by 10/21/83. Petitioners contentions received on ISSUE SE SUPPLEMENT 1:
04/15/85 4
FEMA LETTER RECEIVED:
10/24/83.
CURRENT AWTITRUST:
Motice of a receipt of antitrust information at OL HEARING STARTED:
09/t5/85 ASLB INITIAL DECISION:
05/15/86 stage published 4/6/83.
COMMISSION EFFECTIVENESS DECISION: 06/00/86 TECH SPECS COMPLETED:
06/00/86 COMMISSION DECISION:
06/00/86 ISSUE LIC. WITH POWER RESTRICTION:
ISSUE FULL POWER LICENSE AMEND:
LATEST AMENDMENT:
Amendment 29 (10-28-83), 30 ( 12/01/ A 3 )
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.
06/00/86 12/15/82
~ _ - _ - -. _ _.
l NRR LICENSING SYSTEM PAGE NO: 2-17 i
MIDLAND 1 8 2 0L CU2REN T ST A TUS REPOR T REPORT AS OF: 11/30/83 PLAH T CHARACTER I S T I C S:
K EY P E R S O N N E L:
DOCKET NO:
033080329 LIC. PM:
D. HOOD ASLB CHAIR:
C.
BECHHOEFER APPLICANT:
CO*tSUMERS POWER LIC. BC:
E.
ADENSAM MEMBER 1:
F.
COWAN LOCATION:
SW BOUNDARY OF MIDLAND, MICH.
LIC. LA.
M.
DUNCAN MEMBER 2:
J. HARBOUR REGIDH:
3 AE:
BECH COUNSEL:
W. PATON CONST. INSP: R.
LANDSMAN t
REAC. TYPE: PWR NSSS: B8W ANTITRUST:
B. V0GLER RESID. INSP R.
COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BrCH RM ANALYST:
B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE' t
Utilization of National Laboratories or other agencies to complete some review areas is currently in progress.
ACRS ER DOCKETED:
04/01/78 04/14/78C r
Full Committee Meeting was held 06/04/82.
SSER 81 ER SITE VISIT COMPLETE:
09/08/78 09/08/78C responding to ACRS letter was issued 6/30/32.
SSER #2 INPUT TO DES TO PM:
02/03/82 02/03/82C on soils settlement problems was issued 10/06/82.
ISSUE DES:
02/05/82 02/05/82C BOP safety construction was halted 12e82 because of QA RESPONSE TO COMMENTS ON DES:
07/08/82 07/08/82C problems and would have ended 10/06/83 with NRC's Order ISSUE FES:
07/30/82 07/30/82C approving a Construction Completion Plan; however, extensive safety construction, stopped 10/22/83 by applicant due to i
design documentation deficiencies, is in =ffect.
CURRENT ENV. STATUS:
1 The DES was issued 02/05/82.
The FES was issued on July 30, 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/31/77 08/31/77C SAR DOCKETFD:
09/30/77 11/18/77C SAR Q'S RELcIVED BY PM:
03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/73C i
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
11/01/78 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:
N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:
04/23/82 04/23/8IC settlement began July 7, 1981 and is continuing. C omb i r.ed ISSUE SER:
05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.
ACRS LETTER RECEIVED:
06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 3:
08/16/82 08/16/82C ISSUE SE SUPPLEMENT 3:
11/17/83 11/17/8 3C FEMA LETTER RECEIVED:
01/14/83 01/14/83C CURRENT ANTITRUST
- Proceeding completed. License was arended 10/20/80.
HEARING STARTED:
11/15/82 11/15/82C ASLB INITIAL DECISION:
10/00/85 COMMISSIDH EFFECTIVENESS DECISIDH:-
13/00/85 TECH SPECS COMPLETED:
10/00/85 COMMISSION DECISION:
10/00/85 ISSUE LIC. WITH FCWER RESTRICTIDH:
10/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
10/00/85 110 SCHED. DATE RECEIPT DATE NEW SLIPS /MOTESt i
CFP visit 4/19-21/83 finds appl. schedu'o opfinistic by more CONSTRUCTION COMPLETION - APPL.:
10/00/84 04/12/83 than 1 year.
On 7/14/83 Dow Chemical decided not to boy steam.
Impact on sched. under appl. aval. Asst Current Saf.
Status.)
Comm coeration of Unit 2 may be delazid to mid-86.
L
NRR LICEN5ING SYSTEM PAGE NO: 2-18 MILLSTONE 3 0L CURR ENT STA TUS REPORT REPORT AS OF 11/30/83 PLANT CHARACT ERIST I C St KEY PERS0NNELa DOCKET N3:
05000423 LIC. PM:
E. DOOLITTLE ASL3 CHAIR: N/A APPLICANT:
NORTHEAST NUCLEAR ENERGY LIC. BC:
B.
YOUNGBLOOD MEMBER 1:
N/A LOCATION:
3.2 MI WSW OF HEW LONDON CT.
LIC. LA.:
M.
RUSHBROOK MEMBER 22 N/A REGION:
1 AE:
S&W COUNSEL:
M. ROTHSCHILD CONST. INSP:
REAC. 1YPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP: T. REBELOWSKI DESIGN PWR: 3565 MWT/1156 MWE CONST: S8W RM ANALYSY:
L-.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safoty review questions sent to arpiicant on 05e03/83.
05/!1/83 and 06/29/83. and 12/5/83.
Resoonnes received ER DOCKETED:
02/01/83 02/03/83C on 7/22/83 and 08/01/83, and on 3&/29/83. 09/23/83 and ER SITE VISIT CONPLETE:
07/21/83 07/21/83C 10/03/83.
FSAR Amendment 4 was received on 10/04/83.
INPUT TO DES TO PM:
DSER inputs were due to LPM on 11/01/83. DSER scheduled ISSUE DES:
04/t7/84 to be issued on 12/16/83.
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
11/16/84 CURRENT ENV. STATUS:
Environmental site visit completed on 07/20 and 07/21/83.
Probabilistic safety study received on 03/01/83.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/01/82 10/29/82C SAR DOCKETED:
02/01/83 02/03/83C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE 10 Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S Notice of Opportunity fer Hearing was published in the ISSUE DRAFT SER:
12/16/83 Federal Register on March 4, 1983.
No requests for INPUT TO SER:
05/t5/84 hearing or petitions for leave to intervens were -eceived.
ISSUE SER:
07/16/84 ACRS FULL COMMITTEE MEETING:
08/15/84 l
INPUTS TO SE SUPPLEMENT 1 10/15/84 ISSUE SE SUPPLEMENT 1:
11/15/84 FEMA LET1ER RECEIVED:
CURRENT ANTITRUST HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
11/00/85 COMMISSIDH DECISION:
11/01/85 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
11/00/85 Amendment 4 to FSAR received 10/04/83 Amendment 4 to ER received 10/04/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.e 11/01/85 09/30/82 l
l l
NRR LICENSING SYSTEM PAGE NO: 2-19 HINE MILE POINT 2 0L CURRENT STATUS R EPORT REPORT AS OF: 11/30/83 PLAN 1 CHARACTERISTICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000410 LIC. PM:
M. HAUGHEY ASLB CHAIR APPLICANT:
NIAGARA MOHAWK POWER LIC. BC A.
SCHWENCER MEMBER 1 LOCATION:
8 MI NE OF OSWEGO, NY LIC. LA.:
E. HYLT04 MEMBER 2:
REGIDH2 1
AE:
S8W COUNSEL:
B. BORDENICK CONST. INSP L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST L.
DEWEY RESID. INSP: R. GRAMM DESIGN PWR 3489 MWT/1080 MWE CONST: S8W RM ANALYST B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR was tendered on 01-31-83 and docketed on 04/12/83.
ER DOCKETED:
03/31/83 04/12/83C ER SITE VISIT COMPLETE:
08/05/83 08/03/83C INPUT TO DES TO PM:
05/18/84 ISSUE DES:
07/20/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
12/14/84 CURRENT ENV. STATUS:
The ER was tendered on 01-31-83 and docketed on 04/12/83.
ER site visit was completed on 8/2-3/83.
Environmental SAFETY / HEARING MILEST3NES:
public meeting was held on 08/02/63.
APPLICATION TENDERED:
01/31/83 01/36/83C SAR DOCKETED:
03/31/33 04/12/83C SAR Q'S RECEIVED BY PM:
11/30/83 SAR APPL. RESPONSE 10 Q'S RECEIVED 10/27/83 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
01/19/84 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
02/16/84 Federal Register on 05/13/83. The ASLB ordered on August INPUT TO SER:
08/06/84 4,
1983, that no hearing be held in this operating ISSUE SER:
10/05/84 license application proceeding.
ACRS FULL COMMITTEE MEETING:
11/08/84 INPUTS TO SE SUPPLEMENT 1 12/01/84 ISSUE SE SUPPLEMENT 1:
01/00/85 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSION EFFECTIVENESS DECISION: 02/00/86 TECH SPECS COMPLETED 02/00/86 COMMISSION DECISION:
02/28/86 ISSUE LIC. WITH POWER RES1RICTIDM:
L ATEST AMENDMENTt ISSUE FULL POWER LICENSE AMEND:
02/00/86 CP Extension was issued on February 28, 1983.
SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETIDH - APPL.:
02/00/86 01/31/83
HRR LICEN$ING 3YSTEM PAGE HO 2-20 PALO VERDE 1,2,3 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/83 PLANT CHARACTERIST I C 3:
KEY P E R S 0 N N E La DOCKET NO:
0528-0530 LIC. PM:
E. LICITRA ASLB CHAIR R. LAZO APPLICANT:
ARIZONA PUBLIC SERVICE LIC. BC:
G. KNIGHTON MEMBER 1 R. COLE LOCATION:
36 MI W 0F PHOENIX, AZ LIC. LA.:
J.
LEE MEMBER 2:
D. CALLIHAN REGION:
5 AE BFCH COUNSEL:
L.
DEWEY CONST. INSP L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP G.
FIORELLI DESIGN PWR 3817 MWT/1304 MWE CCNST BCCH RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Several " Independent Design Review" naatings riave been completed.
The SER was i ssued on flovceber ti, 1981 Five ER DOCKETED:
07/01/80 06/20/80C supplements have been issued. Supplemant 05 was issued on ER SITE VISIT COMPLETE:
01/30/88 Ot/30/81C November 28, 1983.
Supplement No. 86 is targeted for 2/84.
INPUT TO DES TO PM:
10/05/81 10/05/8tC IS5UE DES:
10/26/81 10/26/81C RESPONSE TO COMMENTS ON DES:
02/25/82 02/25/82C ISSUE FES:
03/11/82 03/tt/82C CURRENT ENV. STATUS:
The ER (OL) review is complete. A site visit was completed on January 30, 1981 The DES was issued on SAFETY / HEARING MILESTONES:
October 26, 19?; and the FES was issued on March 11, 1
1982.
APPLICATION TENDERED:
10/05/79 10/05/79C SAR DOCKETED:
06/20/80 06/20/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:
on 6-22.
Hearing record was closed on 6-25-82.
A late INPUT 10 SER:
10/30/81 10/30/81C petition, dated 10-13-82 dealing with salt drift on ISSUE SER:
11/11,81 11/tt/81C l
farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:
12/18/81 12/18/81C but reopened the hearing on Units 2 and 3 to consider INPUTS TO SE SUPPLEMENT 68 09/21/83 09/21/83C late petition by W. Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 6:
02/00/84 full power license for Unit 1.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST Antitrust OL review for Units 1 a 2 has resulted in a HEARING STARTED:
04/27/82 04/27/82C finding of rao significant antitrust changes since the ASLB INITIAL DECISIDH 12/30/82 12/30/82C CP review.
A Federal Register of the finding was COMMISSION EFFECTIVENESS DECISION: 04/27/83 04/27/83C published 2-9-83.
TECH SPECS COMPLETED:
05/01/84 COMMISSION DECISION:
04/00/84 ISSUE LIC. WITH POWER RESTRICTION 05/01/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 FSAR Amendment No. 11 ER Supplement No. 4 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
l CONSTRUCTION COMPLETIDH - APPL.:
05/00/84 08/16/83
l i
NRR LICENSING
$YSTEM PAGE NO: 2-21 PERRY 1 8 2 0L CURRENT STA TUS REP 0RT REPORT AS OF: 11/30/83 i
PLANT CHARACT ER ISTICSt KEY PERS0NN EL DOCKET NO:
044080441 LIC. PM:
J.
STEFAND ASLB CHAIR:
P.
BLOCH APPLICANT CLEVELAND ELECTRIC ILLUMINATING LIC. BC:
J. YOUNGBlCOD MEMBER 13 J. KLINE LOCATION:
7 MI NE OF PAINESVILLE, OHIO Lic. LA.:
M.
RUSHBROOK MEMBER 2:
G.
BRIGHT REGION:
3 AE:
GIL COUNSEL:
C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR NSS$2 GE ANTITRUST:
C. WOODHEAD RESID. INSP: M.
GILDNER DESIGN PWR 3759 MWT/1205 MWE CONST: KAISER RM ANALYST:
S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The Safety Evaluation Report was issued in May 1982.
The ACRS Report was issued on July 13, 1982.
SSER No. 1 SR DOCKETED:
06/26/81 06/19/81C was issued in August 1982.
SSER No. 2 was issued in LR SITE VISIT C0ffPLETE:
i Jan. 1983.
SSER Ho. 3 was issued in 4/83.
SSER Ho. 4 is INPUT TO DES TO PM:
01/01/82 01/01/82C scheduled for January, 1984.
ISSUE DES:
02/26/82 02/26/82C i
RESPONSE TO COMMENTS ON DES:
06/30/82 06/30/82C ISSUE FES:
08/13/82 08/13/82C l
e CURRENT ENV. STATUS:
Environmental acceptance review was completed on June 9,
1981 The ER wa9 docketed June 19, 1981 FES SAFETY / NEARING MILESTONES:
r issued in August 19&2.
APPLICATION TENDERED:
06/26/80 06/26/80C SAR DOCKETED:
01/09/81 01/30/81C i
SAR O'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/24/82 02/24/82C Hearing on issue 3 (QA Const. Prog.) completed 4/29/83.
ISSUE DRAFT SER:
02/26/82 02/26/82C Favorable Board decision received on Issue 3.
Issues 1 INPUT TO SER:
04/10/82 05/10/82C (EP), 13 (Turbine Missiles), 14 (in core T/C's) and 15 ISSUE SER:
05/10/82 05/24/82C (Steam Erosion) N/S.
Issue 6 (ATWS-auto SLCS) ar.d 8 (H2 control for degraded core accident) deferred pending Comm.
ACRS LETTER RECEIVED:
07/13/82 07/13/82C rulings.
All other issues deleted by summary disposition.
INPUTS TO SE SUPPLEMENT 4:
N/S ISSUE SE SUPPLEMENT 48 01/31/84 FEMA LETTER RECEIVED:
12/00/83 CURRENT ANTITRUST:
CP antitrust review has been completed. OL antitrust HEARING STARTED:
05/23/83 05/23/83C status is under review.
ASLB INITIAL DECISIDH:
06/00/84 COMMISSION EFFECTIVENESS DECISIDH: 07/00/84 TECH SPECS COMPLETED:
10/00/84 COMMISSION DECISION:
11/00/84 ISSUE LIC. WITH POWER RESTRICTION: 12/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S Number 12 (7-9-83).
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
FEMA Letter of 4/28/83 schedules completion of offsite CONSTRUCTION COMPLETION - APPL.:
12/31/84 03/08/83 emergency plan review by 12/83.
l NRR L ICEN5 ING SYSTEM PAGE HO 2-22 RIVER BEHD 1 82 0L CURREHT STATUS REPORT REPORT AS OF 11/30/83 PLANT CHARACTERIST I C S:
K EY PERS0HH E L:
DOCKET NO:
045880459 LIC. PM:
E. WEINKAM ASLB CHAIR:
B. COTTER l
APPLICANT:
GULF STATES UTILITIES LIC. BC A.
SCHWENCER MEMBER 1:
G.
LINENBERGER l
LOCATION:
24 MI HHW OF BATON ROUGE. LA LIC. LA.:
E. HYLTON MEMBER 2:
R.
COLE REGIDH:
4 AEs
$8W COUNSEL:
D.
REPKA CONST. INSP:
R.
FERRELL i
REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP:
D. CHAMBERLAIN DESIGN PWR: 3015 MWT/0934 MWE CONST: 58W RM AHALYST:
L.
LANIER CURRENT SAF. STATUS:
EHVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Applicant tendered FSAR for docketing on 04/24/81 FSAR was docketed on 08/25/81.
Draft SER issued 06/01/83.
ER DOCKETED:
08/25/81 08/25/81C Construction permit extension requested and granted from ER STYE VISIT COMPLETE:
01/22/82 01/22/82C 03/83 to 12/85 for Unit 1.
INPUT TO DES TO PM:
12/09/83 ISSUE DES:
01/09/84 RESPONSE TO C0hMENTS ON DES:
ISSUE FES:
06/08/84 CURRENT ENV. STATUS:
Applicant tendered ER for docketing on 04/24/81 ER was docketed on 08/25/81.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
04/24/81 04/24/81C SAR DOCKETED:
08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:
12/07/88 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 12/01/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/04/83 03/30/83C Prehearir q conference held 06/14/83 in Baton Rouge, La.
ISSUE DRAFT SER:
04/30/83 06/01/83C Two contentions admitted. Asiatic Clams and Old River INPUT TO SER:
12/00/83 Control Structure. Intervenors admitted were State of ISSUE SER:
12/00/83 Louisiana and Joint Intervenors Louisiana Consumers League Inc., Louisianans for Safe Energy and Gretchen Reineke ACRS FULL COMMITTEE MEETING:
01/13/84 Rothschild.
INPUTS TO SE SUPPLEMENT 1 04/00/84 ISSUE SE SUPPLEMENT 1:
05/00/84 FEMA LETTER RECEIVED:
05/01/84 CURRENT ANTITRUST:
Updated responses from GSU and Cajun Electric Power HEARING STARTED:
10/00/84 Cooperative requested 8/16/83.
Response provided ASLB INITIAL DECISION:
03/00/85 10/26/83 currently under staff review.
COMMISSION EFFECTIVEHESS DECISI0Hz 04/00/Z5 TECH SPECS COMPLETED:
03/00/85 COMMISSIDH DECISION:
04/00/85 ISSUE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
04/00/85 Humber 10, FSAR Supplement 6, ER-OLS.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTIDH COMPLETION - APPL.:
04/E0/85 01/14/83
i 1
~
[.
i' t
J i
4 N RR L ICENSI NG SYST EM PAGE NO:
2-23 SEABROOK 1 8 2 0L CURR EN T STA TUS REPOR T REPORT AS OF: 11/30/83 PL AN T CHAR ACTER IST I C S:
K EY PERS0NN E L:
DOCKET NO:
044380444 LIC. PM:
V.
HERSES ASLB CHAIR:
H.
H0YT APPLICANT:
PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:
G.
KNIGHTON MEMBER 1:
E.
LUEBKE LOCATION:
13 MI $ OF PORTSMOUTH, NH LIC. LA.
J.
LEE MEMBER 2:
J.
HARBOUR REGIDH:
1 AE:
UEC COUNSEL:
R.
LESSY CONST. INSP:
A.
TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B.
V0GLER RESID. INSP:
A.
CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:
B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in Stptember 1981 The FSAR was docketed October 5, 1981 Applicant has ER DOCKETED:
10/05/81 10/05/81C responded to round 1 Q's.
SER was issued 03/07/83.
ACRS ER SITE VISIT COMPLETE:
12/02/81 12/02/81C subcommittee meetino was held April 1-2, 1983.
ACRS INPUT TO DES TO PM:
03/01/82 03/01/82C full committee meeting was held on April 15, 1983.
The ISSUE DES:
05/14/82 05/14/82C ACRS letter is contained in SSER 2 which was issued RESPONSE TO COMMENTS ON DES:
08/18/82 09/15/82C 06/30/83.
ISSUE FES:
12/08/82 12/08/82C e
CURRENT ENV. STATUS:
ER was tendered June 1981.
ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESIONES:
October 5, 1981.
DES was issued in May, 1982.
FES was issued in December 1982.
APPLICATION TENDERED:
06/29/81 06/29/81C SAR DOCKETED:
10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:
01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
05/07/82 10/08/82C Notice for Opportunity for Hearing was published in the Fed-ISSUE DRAFT SER:
07/30/82 08/13/82C eral Register on October 19, 1981.
Prehearing conferences INPUT TO SER:
11/30/82 12/29/82C were held May 6-7, 1982. July 15-16, 1982 and April 7-8, ISSUE SER:
01/12/83 03/07/83C 1983.
ASLB Order identifying parties, contentions and pr e-hearing schedule was issued September 13, 1982.
Hearings ACRS LETTER RECEIVED:
02/17/83 04/19/83C started August 17, 1983.
Applicant has requested December INPUTS TO SE SUPPLEMENT 3:
N/S 1983 hearings be changed to 3/84.
Prehearing conference ISSUE SE SUPPLEMENT 3:
N/S to discuss hearing date changes is scheduled for 01/84.
FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Status to be determined.
HEARING STARTED:
08/17/83 08/17/83C ASLB INITIAL DECISION:
09/00/84 COMMISSION EFFECTIVENESS DECISION: 09/00/84 TECH SPECS COMPLETED:
08/00/84 COMMISSION DECISION:
09/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
09/00/84 FSAR Amendment 50 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
Fuel load slipped to 9/84 per applicant letter of 12/02/82.
CONSTRUCTION COMPLETION - APPL.
09/30/84 12/02/82
NQR L ICENSING SYSTEN PAGE ND: 2-24 SHOREHAM 0L CURREN T STA T US REP 0RT REPORT AS OF 11/30/83 PLAN T CHARACT ERIST I C S:
K EY PER S 0 N N E L:
DOCKET NO:
05003322 LIC. PM:
R.
CARUS 0 ASLB CHAIR:
L.
BRENHER APPLICANT:
LONG ISLAND LIGHTING CD.
LIC. BC:
A.
SCHWENCER MEMBER 1:
P. MORRIS LOCATION:
BROOKHAVEN, NY (LI)
LIC.
LA.*
E. HYLTON MEMBER 2:
G.
FERGUSON REGION:
1 AE:
S8W COUHSEL:
B. BORDENICK C0HST. INSP:
L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:
J. RUTBERG RESID. INSP: C. PETROHE DESIGN PWR: 2436 MWT/0870 MWE CONST: 58W RM ANALYST:
L.
LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The ACRS meeting was held in October 1981.
SER Supplement 2 was issued in March 1982.
SSER #3 was ER DOCKETED:
01/26/76 01/26/76C issued 02/04/83. SSER #4 was issued 09/30/83.
ER SITE VISIT COMPLETE:
08/06/76 08/03/76C INPUT TO DES TO PM:
11/22/76 11/29/76C ISSUE DES:
03/11/77 03/24/77C RESPONSE TO COMhENTS ON DES:
07/22/77 07/22/77C ISSUE FES:
10/21/77 10/18/77C CURRENT ENV. STATUS The environmental review is complete.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
09/00/75 09/04/75C SAR DOCKETED:
12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:
06/04/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
p 07/15/77 08/01/77C The first emergency planning pre-hearing conference was ISSUE DRAFT SER:
held 7/13/83.
A new safety contention regarding emergency IHPUT TO SER:
03/10/81 03/10/81C diesel generators was admitted on 06/22/83.
Hearings on ISSUE SER:
04/10/81 04/10/81C diesel generator contentions have been postponed postponed indefinitely on 8/16/83, after a crankshaft ACRS LETTER RECEIVED:
09/18/81 10/19/81C on one of the EDGs failed during a load test.
Hearings on INPUTS TO SE SUPPLEMENT 4:
12/01/83 Emergency Planning scheduled to begin 12/06/83.
The first ISSUE SE SUPPLEMENT 4:
08/15/83 09/30/83C Partial Initial Decision was issued on 09/21/83.
FEMA LETTER RECEIVED:
06/23/83 06/23/83C CURRENT ANTITRUST:
Not required.
HEARING STARTED:
05/04/82 05/04/82C ASLB INITIAL DECISION:
N/S COMMISSION EFFECTIVEHESS DECISION: 05/00/84 TECH SPECS COMPLETED:
03/00/84 COMMISSION DECISIGHz 05/00/84 ISSUE LIC. WITH POWER RESTRICTION: 05/00/84 LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
07/00/84 FSAR Amendment 31.
diesel generator failures.
SCHED. DATE RECEIPT DtTE NEW SLIPS / NOTES:
Fuel load date has slipped to 05/84 because of the diesel CONSTRUCTION COMPLETION - APPL.*
05/00/84 11/10/83 generator failures.
~. -
~_- ___
-. _ ~ _.
1 NRR L ICENSING SYSTEM PAGE NO: 2-25 l
SOUTH TEXAS 1 8 2 0L CURRENT STATUS REPORT REPORT AS OF: 11/30/83 PLANT CHARACT ERIST ICS K EY P E R S O N N E L:
DUCKET NO:
049810499 LIC, PM:
A.
VIETTI ASLB CHAIR:
C. BECNHOEFER 3
APPLICANT:
HOUSTON LIGHTING B POWER COMPANY LIC. BC:
G. KNIGHTON MEMBER 1:
J. LAMB I
LOCATION:
12 MI SSW OF BAY CITY, TEX LIC. LA.:
J.
LEE MEMBER 2:
E. HILL REGION:
4 AE:
BECH COUNSEL:
R.
PERLIS CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B.
V0GLER RESID. INSP: W. NILL DESIGN PWR 3800 MWT/1250 MWE CONST: EBASCO R1 ANALYST:
L.
LANIER 4,
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE BRRT has been replaced by Bechtel as the A/E.
BRRT l
has been replaced by Eb;sco as the constructor.
ER DOCKETED:
07/17/78C Non-safety related construction restarted on June 15, 1982.
ER SITE VISIT COMPLETE:
09/26/78 09/26/78C
[
Safety related construction restarted on August 15, 1982.
INPUT TO DES TO PM:
08/00/85 Current FLD is 12/86.
Milestones now reflect a 12/86 FLD.
ISSUE DES:
09/00/85 Applicant plans a series of updates to the FSAR.
Review RESPONSE TO COMMENTS ON DES:
01/00/86 effort from updated FSAR docket thru applicant responses ISSUE FES:
02/00/86 t
to Q's.
I CURRENT ENV. STATUS:
Schedule revised to reflect new 12/86 FLD.
Applicar:t plans update to the ER.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
05/10/78 05/10/78C SAR DOCKETED:
07/17/78C SAR Q'S RECEIVED BY PM:
01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
02/01/85 As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:
02/01/85 expedited hearing on QA programs and management was INPUT TO SER:
11/01/85 held.
The record of this phase of the hearing ISSUE SER:
12/01/85 was closed on June 17, 1982.
Phase II of hearing 1
will consider all aspects of Quadrex Report.
ACRS FULL COMMITTEE MEETING:
01/00/86 Phase II is expected to begin in the Summer of '83.
INPUTS TO SE SUPPLEMENT 1:
01/00/86 ISSUE SE SUPPLEMENT 1:
01/00/86 FEMA LETTER RECEIVED:
N/S CURRENT ANTITRUST:
Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:
06/00/86 preposed license conditions and dismissing proceeding.
ASLB INITIAL DECISIDH:
11/00/86 COMMISSION EFFtte?VENESS DECISION:
12/00/86 TECH SPECS COMPLEICO:
12/00/86 COMMISSION DECISION:
12/00/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/86 FSAR amendment 833 was issued 09/27/83.
ER amendment 86 was issued 12/01/82.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
All schedules now reflect new official FLD of 12/86.
CONSTRUCTION COMPLETION - APPL.
12/00/86 03/00/82 i
NRR L ICEHS ING SYST EM PAGE NO: 2-26 SUSQUEHAHHA 2 0L CURREHT STATUS REP 0RT REPORT AS OF: 11/30/83 PLA H T CHARACTER IST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000388 LIC. PM:
R. PERCH ASLB CHAIR:
J. GLEASON APPLICANT:
PENHSYLVANIA POWER 8 LIGHT LIC. BC:
A.
SCHWENCER MEMBER 1:
LOCATIDH:
7 MI HE OF BERWICK, PA LIC. LA.
E. HYLTON MEMBER 2:
P. PURDOM REGION:
1 AE:
BECH COUNSEL:
M. WAGNER CONST. INSP:
L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:
A. HODGDON RESID. INSP:
G.
RHOADS DESIGN PWR: 3440 MWT/1052 MWE CONST: BECH RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
EHVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 04/06/81.
SSER #1 was issued 07/07/81 Post ACRS SSER J2 was issued 09/10/81.
SSER 83 was ER DOCKETED:
06/10/78C issued 07/17/82.
SSER 84 was issued 11/12/82.
SSER #S ER SITE VISIT COMPLETE:
10/20/78 10/20/78C was issued 3/29/83.
SSER 86 is scheduled for 01/84.
INPUT TO DES TO PM:
ISSUE DES:
03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:
05/21/81 0 5/21/ 81 C ISSUE FES:
06/1S/81 07/02/81C CURRENT ENV. STATUS:
DES was issued on 03-30-81.
FES was issued 07-02-81.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/05/78 04/10/78C SAR DOCKETED:
07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:
04-12-82.
INPUT TO SER:
03/23/81 03/23/81C ISSUE SER:
04/06/81 04/06/81C ACRS LETTER RECEIVED:
08/15/81C INPUTS TO SE SUPPLEMENT 6:
02/01/83 02/03/83C ISSUE SE SUPPLEMENT 6:
01/01/84 FEMA LETTER RECEIVED:
06/00/82 06/00/82C CURRENT ANTITRUST:
Complete.
HEARING STARTED:
10/06/81 10/06/81C ASLB INITIAL DECISION:
04/12/82 04/12/82C COMMISSIDH EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
12/00/83 COMMISSION DECISION:
02/00/84 i
I ISSUE LIC. WITH POWER RESTRICTION:
I LATEST AMENDMENT:
ISSUE FULL POWrR LICENSE AMEND:
02/00/84 FSAR:
No. 30; ER:
Ho. S SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETI0H - APPL.:
02/00/84 l
l
\\
NRR LICEN5ING SYSTEM PAGE ND: 2-27 V0GTLE 1 42 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/83 PLANT CHARACT ERIST ICS KEY P E R S 0 N N E L:
DCCKET NO:
0424-0425 LIC. PM:
M. MILLER ASLB CHAIR:
A. ROSENTHAL
?.PPLICANT:
GEORGIA POWER LIC. BC:
E. ADAMSAM MEMBER 1:
LOCATION:
25 MI SSE OF AUGUSTA, GA LIC. LA.:
M.
DUNCAN MEMBER 2:
REGIDH 2
AE SSC/BECH COUNSEL:
B. BORDENICK CONST. INSP: J. RAUSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST:
RESID. INSP W. SANDERS DESIGN PWR 3565 MWT/1210 MWE CONST: GPO RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE FSAR was docketed on 09/16/83.
ER DOCKETED:
11/30/83 11/30/83C ER SITE VISIT COMPLETE:
03/21/84 INPUT TO DES TO PM:
07/26/84 ISSUE DES:
09/26/84 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
03/26/85 CURRENT ENV. STATUS:
ER was docketed on November 30, 1983.
SAFETY / HEARING MILESTONES:
APPLICATI0H TENDERED:
06/30/83 06/30/83C SAR DOCKETED:
09/16/83 09/16/83C SAR Q'S RECEIVED BY PM:
04/15/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/15/84 CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/01/84 Notice of Opportunity for Hearing is to be published in the ISSUE DRAFT SER:
11/01/84 Federal Register.
INPUT TO SER:
04/01/85 ISSUE SER:
06/01/85 ACRS FULL COMMITTEE MEETING:
07/01/85 INPUTS TO SE SUPPLEMENT 12 08/01/85 ISSUE SE SUPPLEMENT 18 09/01/85 FEMA LETTER RECEIVED:
CURRENT ANTITRUST:
To be determined.
HEARING STARTED:
02/01/86 ASLB INITIAL DECISI0H 08/01/86 COMMISSION EFFECTIVENESS DECISION: 09/01/86 TECH SPECS COMPLETED:
COMMISSION DECISION:
09/00/86 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.:
09/00/86 12/31/81
HRR L ICEH$ING SYSTEM PAGE NO: 2-28 WASHINGTON NUCLEAR 1 0L CURREHT STATUS REP 0RT REPORT AS OF 11/30/83 PLANT CHARACTERISTICSt KEY PERS0HHELa DOCKET NO:
05000460 LIC. PM:
M.
THADANI ASLB CHAIR:
H. GROSSMAN APPLICANT:
WASHINGTOH PUBLIC POWER SUPPLY SYSTEM LIC. BC:
E. ADENSAM MEMBER 1:
G. BRIGHT LOCATION:
10 MI H OF RICHLAND, WA LIC. LA.:
M.
DUNCAN MEMBER 2 J. HARBOUR REGION:
5' AE UEC COUNSEL:
M.
YOUNG CONST. INSP J. OLIN REAC. TYPE: PWR HSSS: B8W ANTITRUST:
J. RUTBERG RESID. INSP:
A.
TOTH DESIGN PWR 3760 MWT/1266 MWE CONST: BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.
Application was docketed on July 16, 1952.
The staf f reviews will be ER DOCKETED:
07/00/82 07/16/82C perfccmed on " manpower available" basis.
The construction ER SITE VISIT COMPLETE:
permit was amended effective 06/16/83, extending the INPUT TO DES TO PM:
construction completion date from 01/01/82 to 06/01/91.
ISSUE DES:
N/S RESPONSE TO COMMENTS ON DES:
ISSUE FES:
N/S CURRENT ENV. STATUS:
The staff reviews will be performed on " manpower available" basis.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
11/25/81 11/25/81C SAR DOCKETED:
07/00/82 07/16/82C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE 10 0'S RECEIVED:
INPUT TO DRAFT SER TO PM:
CURRENT HRG. STATUS:.
ISSUE DRAFT SER:
Notice of Opportunity for Hearing was published in the Federal Register on August 16, 1982.
A petition to INPUT TO SER:
intervene has been received from the Coalition for ISSUE SER:
N/S Safe Power.
A prehearing conference was held in Richland, Wa., on January 26 and 27. 1983.
ASLB ACRS FULL COMMITTEE MEETING:
N/S denied CP amended hearing contention 81, and admitted INPUTS TO SE SUPPLEMENT 1:
CP contention 82.
The CP extension hearing is ISSUE SE SUPPLEMENT 1 N/S sr.heduled for Jaruary 10, 1984.
FEMA LETTER RECEIVEDt CURRENT ANTITRUST:
HEARING STARTED:
N/S ASLB INITIAL DECISION:
N/S COMMISSIDH EFFECTIVENESS DECISIDH N/S TECH SPECS COMPLETED:
COMMISSIDH DECISI0H:
ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S ER amend. 1 dated 02/11/83, received 03/04/83.
SCHED. DATE RECElPT DATE NEW SLIPS / NOTES:
Construction delay of from ? to 5 years was announced CONSTRUCT 10N COMPLETI0H - APPL.:
N/S 04/29/82 on 4/29/82.
l
NRR L ICENSING SYST EM PAGE NO: 2-29 WASHINGTON NUCLEAR 2 0L CURRENT STATUS REP 0RT RLPORT AS OF 11/30/83 1
PLAHT CHARACTERISTICSt KEY PERSONNELa l
l DOCKET NO:
05000397 LIC. PM:
R. AULUCK ASLB CHAIR:
E. BOWERS APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
A.
SCHWENCER MEMBER 1 R.
COLE l
LOCATION:
30 MI NW OF RICHLAND, WASH LIC. LA.:
E. HYLTON MEMBER 2:
E. HILL 1
REGION:
5 AE 88R COUNSEL:
W. PATON CONST. INSP A.
TOTH REAC. TYPE: BWR NSSS: GE ANTITRUST:
B. V0GLER RESID. INSP R.
FEIL DESIGN PWR 3323 MWT/1103 MWE CONST: BECH RM ANALYST L.
LAHIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology /Suismology reviews were included in SSER No. 1 issued August it, 1982.
ACRS ER DOCKETED:
02/28/77 04/20/77C meeting was held on October 7, 1982.
SSER No. 2 was ER SITE VISIT COMPLETE:
07/13/77 07/14<77C issued 12/21/82.
S5ER 83 issued on 05/20/83.
INPUT TO DES TO PM:
06/30/81 06/30/81C ISSUE DES:
07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:
09/28/81 09/28/8tC ISSUE FES:
12/31/81 12/31/81C j
CURRENT ENV. STATUS:
FES was issued 12-31-81 SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
12/30/76 12/30/76C SAR DOCKETED:
04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:
01/05/79 03/07/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/11/79 07/26/79C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/12/81 10/12/8tc A prehearing conference on CP extension order was held ISSUE DRAFT SER:
11/17/81 11/17/81C on January 26, 1983, in Richland, Wa.
On February 22.
INPUT TO SER:
05/30/82 05/30/82C 1983, the ASLB denied the request for hearing filed by ISSUE SER:
03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proceeding.
No OL hearings scheduled.
ACRS LETTER RECEIVED:
11/13/82 11/13/82C INPUTS TO SE SUPPLEMENT 3:
11/22/82 11/22/8iC ISSUE SE SUPPLEMENT 38 05/20/83 05/20/83C FEMA LETTER RECEIVED:
08/01/83C CURRENT ANTITRUST:
Not required HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMNISSION EFFECTIVEMESS DECISI0H TECH SPECS COMPLETED:
12/00/83 COMNISSION DECISIGHz 12/00/83 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
01/00/84 SCHED. DATE RECEIPT DATE NEW SLIPS / MOTES:
CONSTRUCTION COMPLETION - APPL.:
12/08/83
i.
NRR LICENSING SYSTEM PAGE NO: 2-30 l
WASHINGTON NUCLEAR 3 0L CURRENT STATUS REP 0RT REPORT AS OF 11/30/83 PLANT CHARACTER ISTICSt KEY P E R S 0 N N E La DOCKET NO:
05000508 LIC. PM:
A. VIETTI ASLB CHAIR:
M. MARQULIES APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:
G. KNIGHTON MEMBER 18 F. SHON LOCATION:
26 MI W OF OLYMPIA, WA LIC. LA.:
J. LEE MEMBER 2:
R.
FOSTER REGION:
5 AE EBASCO COUNSEL:
D. HASSELL CONST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B. V0GLER RESID. INSP W. ALBERT DESIGN PWR 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:
L.
LAHIER t
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Application was tendered on June 2, 1982, and was 4
docketed on 08/27/82. Review effort from FSAR docket ER DOCKETED:
08/27/82 08/27/82C thru applicant responses to Q's.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
09/08/83 09/27/83C ISSUE DES:
12/23/83 RESPONSE TO COMMENTS ON DES:
ISSUE FES:
04/06/84 CURRENT ENV STATUS:
Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from ER docket SAFETY / HEARING MILESTONES:
{
thru preparation and issuance of the DES.
APPLICATION TENDERED:
06/02/82 06/02/82C SAR DOCKETED:
08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
12/01/83 Federal Register on 09/15/82. On February 25, 1983, a INPUT TO SER:
06/05/84 request for a hearing and petition for leave to intervene ISSUE SER:
08/09/84 was received from coalition for Safe Power of Portland, Oregon. On April 21, 1983 the Licensing Board handed down ACRS FULL COMMITTEE MEETING:
09/00/84 an order to accept its late filed petition. Prehearing INPUTS TO SE SUPPLEMENT 1:
11/06/84 was held on August 17, 1983.
On 09/27/83 the ASLB ISSUE SE SUPPLEMENT 1:
12/13/84 admitted 9 contentions.
FEMA LETTER RECEIVED:
CURRENT ANTITRUST 4
Notice of receipt of Antitrust Information was published HEARING STARTED:
05/00/85 in the Federal Register on October 27, 1982.
ASLB INITIAL DECISI0H:
11/00/85 COMMISSION EFFECTIVENESS DECISION: 12/00/85 TECH SPECS COMPLETED:
12/00/85 COMMISSION DECISION:
06/00/87 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
N/S FSAR 03 01/04/83 ER Of 12/09/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
1 A letter was received on 11/18/83 informing the CONSTRUCTION COMPLETI0H - APPL.:
06/00/87 11/01/82 staff the projected fuel load date for WNP3 ranges anywhere between 06/87 and 12/89.
l 1
~_.
i i
NRR LICENSING SY$ TEM PAGE HO: 2-31 WATERFORD 3 0L CURR ENT STA TUS R EP0RT REPORT AS OF: 11/30/83 PL AN T CHA RA CTER I ST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05Daa o2 LIC. PM:
J. WILSON ASLB CHAIR:
S. WOLFE APPLICANT:
LOUISIANA POWER 4 LIGHT LIC. BC:
G.
KNIGHTON MEMBER 1:
W.
JORDAH LOCATION:
20 MI W OF HEW ORLEANS, LA LIC. LA.:
J.
LEE MEMBER 2:
H.
FOREMAN REGION:
4 AE:
EBASCO COUNSEL:
S. TURK CONST. INSP:
. UNASSIGNED REAC. TYPE: PWR NSSS: COMB ANTITRUST:
B.
V0GLER RESID. INSP:
L. CONSTABLE DESIGN PWR: 3560 MWT/1151 MWE CONST: EBASCO RM ANALYST:
L.
LANIER CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SSER No. 5 was issued 7/8/83.
Fuel load date was revised to '05/84 in September of 1983.
ER DOCKETED:
12/00/78 12/00/78C ER SITE VISIT COMPLETE:
12/05/80 12/05/80C IHPUT TO DES TO PM:
04/06/81 04/06/81C ISSUE DES:
05/01/81 05/01/81C RESPONSE TO COMME ~eTS ON DES:
07/24/81 08/19/81C ISSUE FES:
09/30/81 09/30/81C CURRENT ENV. STATUS:
The DES was completed in May 1981 FES was completed September 1981 SAFETY / HEARING NILESTONES:
L APPLICATICH TEHDERED:
09/28/78 09/28/78C SAR DOCKETED:
12/18/78C SAR Q'S RECEIVED BY PM:
N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
10/03/80 05/15/81C Constested hearing started 03/82. Partial initial Decision ISSUE DRAFT SER:
issued 11/03/82.
Hearing for remaining item (emergency IHPUT TO SER:
05/08/81 05/15/81C preparedness) was held Feb. 7-11, 1983.
Record closed ISSUE SER:
07/09/81 07/09/81C i
Feb. 11, 1983.
Appeal Board hearing was held April 19, 1983 to hear rebuttal of 11/03/82 PID.
Second partial initial ACRS LETTER RECEIVED:
09/15/83 09/15/83C decision issued 05/26/83 by ASLB.
ASLAB decision on 1st INPUTS TO SE SUPPLEMENT 63 05/18/83 05/18/83C PID 06/29/83.
Commission consent on 1st PID 9/07/83.
ISSUE SE SUPPLEMENT 6:
07/00/84 Awaiting ASLAB decision on 2nd PID.
FEMA LETTER RECEIVED:
03/01/84 CURRENT ANTITRUST:
Staff is reviewing OL antitrust information.
HEARING STARTED:
08e17/83 08/17/83C ASLB INITIAL DECISION:
05/26/83 05/26/83C COMMISSION EFFECTIVENESS DECISION: 04/00/84 TECH SPECS COMPLETED:
05/00/84 3
COMMISSION DECISION:
04/00/84 ISSUE LIC. WITH POWER RESTRICTION:
LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/84 ER 83 - 8/81 FSAR 833 - 10/83.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION - APPL.'
05/00/84 09/00/83 emergency plan.
l'
_ -.~.
t NRR LICEN5ING SYSTEM PAGE NO: 2-32 WATTS BAR 1 82 0L CURRENT STATUS REPORT REPORT AS OF: 11/30/83 PLANT C H A R A C T E R I S T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
039080391 LIC. PM:
T. KENYON ASLB CHAIR: N/A l
APPLICANT:
TENNESSEE VALLEY AUTHORITY LIC. BC:
E. ADENSAM MEMBER 1:
N/A LOCATION 10 MI S OF SPRING CITY, TENN LIC. LA.:
M.
DUNCAN MEMBER 2:
N/A REGION:
2 AE:
TVA COUNSEL:
M. YOUNG CONST. INSP: W. SWAN REAC. TYPE: PWR NSSS: WEST ANTITRUST:
J. RUTBERG RESID. INSP T. HEATHERLY DESIGN PWR: 3411 MWT/116S MWE CONST: TVA RM ANALYST:
L. LANIER l
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE l
CFP predicted earliest Unit 1 completion date at 06/84.
SER published 07/82.
ACRS subcommittee meetings hsid ER DOCKETED:
01/0S/77 11/23/76C 04/30/82 and 08/10/82.
ACRS full committee meeting ER SITE VISIT COMPLETE:
03/18/77 02/25/77C held 08/13/82.
ACRS letter received 08/16/82.
Supplement INPUT TO DES TO PM:
07/06/77 08/18/77C
RESPONSE TO COMMENTS ON DES:
N/A ISSUE FES:
11/24/78 12/29/78C i
CURRENT ENV. STATUS:
Complete except for environmental tech specs.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
06/30 6 06/30/76C SAR DOCKETED:
10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:
12/1S/76 OS/20/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C l
CURRENT HRG. STATUS:
' INPUT TO DRAFT SER TO PM:
06/18/80 12/18/81C No hearings are assumed.
ISS!IE DRAFT SER:
12/30/81 12/30/81C INPUT TO SER:
06/04/82 06/04/82C ISSUE SER:
07/01/82 07/01/82C ACRS LETTER RECEIVED:
09/00/82 08/16/82C I
INPUTS TO SE SUPPLEMENT 2:
08/27/82 09/03/82C ISSUE SE SUPPLEMENT 2:
12/00/83 c
i i
FEMA LETTER RECEIVED:
09/01/83 09/01/83C l
CURRENT ANTITRUST:
Complete HEARING STARTED:
N/A i
ASLB INITIAL DECISION:
N/A l
COMMISSION EFFECTIVENESS DECISION:
TECH SPECS COMPLETED:
03/00/84 COMMISSION DECISION:
03/00/84 ISSUE LIC. WITH POWER RESTRICTIPN: 04/00/84 i-LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
06/00/84 l
FSAR No. 46 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETION - APPL.'
04/20/84 10/11/83
NRR LICENSING SYSTEM PAGE NO:
2-33 WJLF CREEK 1 0L CURRENT STA TUS REPORT REPORT AS OF: 11/30/83 PLANT CHARACT ER IST ICS KEY P E R S 0 N N E La DOCKET NO:
05000482 LIC. PM:
J. HOLONICH ASLB CHAIR:
S. WOLF APPLICANT 1 KANSAS GAS 8 ELECTRIC LIC. BC:
B.
YOUNGBLOOD MEMBER 1:
G.
ANDERSON LOCATION:
3.5 MI NE OF BURLINGTON, KAN LIC. LA.
M. RUSHBROOK MEMBER 2:
H. PAXTON REGION:
4 AE:
BECH COUNSEL:
M. KARMAN CONST. INSP:
REAC. TYPE: PWR NSSS: WEST ANTITRUST:
B. V0GLER RESID. INSP:
S.
SCHUM DESIGN PWR: 3425 MWT/1150 MWE CONST: DANIEL RM ANALYST S. HEDLUND CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE The SER was issued in April 1982.
SSER-1 was issued in August 1982 and SSER-2 in June 1983.
SSER-3 was issued ER DOCKETED:
11/25/80 11/25/80C in August 1983.
SSER-4 tentatively scheduled for 12/17/83.
ER SITE VISIT COMPLETE:
07/28/81 04/21/81C INPUT TO DES TO PM:
10/01/81 10/ 01/81C ISSUE DES:
01/05/82 01/05/82C RESPONSE TO COMMENTS ON DES:
05/14/82 05/14/82C ISSUE FES:
06/11/82 06/11/82C CURRENT ENV. STATUS:
The DES was issued in January 1982.
The FES was issued in June 1982.
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
02/21/80 02/21/80C SAR DOCKETED:
08/07/80 08/07/80C SAR Q'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
03/12/82 03/12/82C Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:
Federal Register on 12/18/80.
Two petitions for INPUT TO SER:
03/19/82 03/19/82C leave to intervene were filed.
A special combined ISSUE SER:
04/07/82 04/07/82C prehearing conference was held on 4/15/81 A second prehearing conference was held on March 10, 1983.
ACRS LETTER RECEIVED:
05/11/82 05/11/82C Hearing is tentatively scheduled for Jan. 17-26, 1984 INPUTS TO SE SUPPLEMENT 4:
10/31/83 and Feb. 14-23, 1983.
ISSUE SE SUPPLEMENT 4:
12/17/83 FEMA LETTER RECEIVED:
12/15/83 CURRENT ANTITRUST:
OL antitrust review is in progress.
HEARING STARTED:
01/17/84 ASLB INITIAL DECISION:
06/00/84 COMMISSION EFFECTIVENESS DECISION: 07/00/84 TECH SPECS COMPLETED:
07/00/84 COMMISSION DECISION:
07/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
08/00/84 SNUPPS FSAR - No. 12; Wolf Creek Site Addendum - No. 11; ER - No. 4.
SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:
CONSTRUCTION COMPLETI0H - APPL.:
08/00/84 05/23/83
=-
t I
I HRR L ICENSING SYS T EM PAGE NO: 2-34 ZIMMER 1 0L CURRENT ST ATUS REP 0RT REPORT AS OF: 11/30/83 i
PLAN T CHARACT ER IST I C S:
KEY P E R S 0 N N E L:
DOCKET NO:
05000358 LIC, PM:
L. KINTHER ASLB CHAIR:
J.
FRYE APPLICANT:
CINCINNATI GAS 8 ELECTRIC LIC. BC B. YOUNGBLOOD MEMBER 1:
F. HOOPER LOCATION:
24 MI SE OF CINCINHATI, OH LIC. LA.
M.
RUSHBROOK MEMBER 2:
M.
LIVINGSTON j
REGION:
3 AE2 58L COUNSEL:
C.
BARTH CONST. INSP: D. HUNTER REAC. TYPE: BWR HSSS: GE ANTITRUST:
S.
LEWIS RESID. INSP F. CHRISTIANSON DESIGN PWR: 2436 NWT/0810 MWE CONST: KAISER RM ANALYST:
B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE j
The latest Supplement to the SER was issued on 08/23/82.
Resolution of open items in the safety review is continuing.
ER DOCKETED:
09/10/75 09/10/75C On 11/12/82 the Commission issued an order to Show Cause 8 ER SITE VISIT COMPLETE:
10/09/75 10/09/75C i
Order Immediately Suspending Construction because of QA INPUT TO DES TO PM:
08/20/76 08/19/76C concerns.
In sesponse to Commission's Order, on October 5.
ISSUE DES:
10/15/76 10/15/ 76 C 1983, applicant submitted its course of action to verify RESPONSE TO COMMENTS ON DES:
03/25/77 04/01/77C a
quality of construction and complete construction.
ISSUE FES:
06/10/77 06/10/77C i
5 CURRENT ENV. STATUS:
I Complete SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
08/15/75 05/09/75C SAR DOCKETED:
09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:
10/29/76 01/06/77C g
SAR APPL. RESPONSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:
INPUT TO DRAFT *SER TO PM:
01/28/77 08/11/77C i
Hearing completed 3/5/82.
Licensing Board decision which ISSUE DRAFT SER:
N/A i
became final on 7/13/83 authorizes fuel loading and low INPUT TO SER:
05/20/77 12/07/77C power testing up to 5% power but precludes the NRC staff ISSUE SER:
07/29/77 01/31/79C from issuing a full-power license and orders additional hearings on emergency plans.
Licensing Board denied MVPP ACRS LETTER RECEIVED:
09/16/77 03/13/79C motion to reopen the hearing on quality assurance issues; INPUTS TO SE SUPPLEMENT 3 06/17/82 08/02/82C j
MVPP petitioned Licensing Board to reconsider its denial ISSUE SE SUPPLEMENT 3:
08/23/82 08/23/82C based on new information.
FEMA LETTER RECEIVED:
04/15/82 04/15/82C l
CURRENT ANTITRUST:
i Antitrust review is now closed.
HEARING STARTED:
02/26/82 02/26/32C I
ASLB INITIAL DECISION:
N/S l
COMMISSION EFFECTIVENESS DECISION: 07/13/83 07/13/ 8 3C TECH SPECS COMPLETED:
11/00/84 COMMISSIDH DECISION:
11/00/84 l
ISSUE LIC. WITH POWER RESTRICTION:
l LATEST AMENDMENT:
ISSUE FULL POWER LICENSE AMEND:
12/00/84 i
Application amendment 152. FSAR Revision 98.
SCHED. DATE RECEIPT DATE I
NEW SLIPS / NOTES:
Applicant letter of 06/01/83 revised estimated construction CONSTRUCTION COMPLETION - APPL.
12/00/84 06/01/83 completion date to the fourth quarter of 1984.
Construction 1
l is still suspended by 11/12/82 Order.
i
NRR LICENSING SYSTEM PAGE NO: 2-35 CLINCH RIVER CP CURR ENT STATUS REPORT REPORT AS OF: 11/30/83 PL ANT CHA RACTER IST I C S:
KEY PERS0NNEL DOCKET NO:
05000537 LIC. PM:
R. STARK ASLB CHAIR:
M. MILLER APPLICANT:
PROJECT MANAGEMENT CORP.; DOE;TVA LIC. BC:
N.
GRACE MEMBER 1:
G.
LINENBERGER LOCATION:
25 MI W OF KNOXVILLE, TN LIC.
- l. A.
P.
SHUTTLEWORTH MEMBER 2:
C. HAND REGIDH 2
AE:
BAR COUNSEL:
S.
TREBY CONST. INSP:
REAC. TYPE: LMFBR HSSS: WEST ANTITRUST:
J.
RUTBERG RESID. INSP:
DESIGN PWR: 0975 MWT/0350 MWE CONST: S&W RM ANALYST:
B. ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981.
A revision to the Site Suitability Report was issued June 11, 1982.
ER DOCKETED:
04/11/75 04/11/75C On August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:
River's request to begin site preparation activities.
INPUT TO DES TO PM:
The Site Suitability Report hearing sessions were held ISSUE DES:
02/12/76C in Oak Ridge during the week of August 23, 1982.
SER was RESPONSE TO COMMENTS ON DES:
issued 3/11/83.
The ACRS meeting was held 4/14/83.
LWA-2 ISSUE FES:
02/07/77 02/07/77C will not be requested. Supplement No. 1 was issued on 05/02/83 and Supplement No. 2 was issued on 05/20/83.
CURRENT ENV. STATUS:
The FES was issued in February 1977.
A draft supplement to the FES was issued on July 19, 1982.
A final supplement SAFETY / HEARING MILESTONES:
was issued on October 29, 1982.
APPLICATION TENDERED:
10/15/74 10/15/74C SAR DOCKETED:
06/13/75 06/13/75C SAR Q'S RECEIVED BY PM:
04/09/82 04/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/82 05/15/82C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
07/16/82 07/16/82C Hearing sessions on the SSR took place on August 23-27, ISSUE DRAFT SER:
09/27/82 09/27/82C 1982.
The FES hearings were held November 15-19, 1982, INPUT TO SER:
01/14/83 02/04/83C December 13-17, 1982, and on January 4-5, 1983.
PID was ISSUE SER:
03/11/83 0 3/11/83C issued on 02/28/83 on the FES hearing.
Safety hearing was held August 8-11, 1983.
The Appeal Board oral arguments ACRS LETTER RECEIVED:
04/19/83 04/19/83C on Sept. 28, 1983 on the PID that was issued on 02/28/83.
INPUTS TO SE SUPPLEMENT 2 04/22/83 04/22/83C ISSUE SE SUPPLEMENT 28 05/20/83 05/20/83C CURRENT ANTITRUST:
HEARING STARTED:
08/23/82 08/23/82C ASLB INITIAL DECISION:
04/01/84 COMMISSION EFFECTIVENESS DECISION: 06/00/84 TECH SPECS COMPLETED:
COMMISSION DECISIDH 06/00/84 CP ISSUED:
06/00/84 LATEST AMENDMENT:
NEW SLIPS / NOTES:
HRR LICEN3ING SYSTEM PAGE NO: 2-36 (HS$)CESSAR SYSTEM 80 FDA CURRENT STATUS REP 0RT REPORT AS OF: 11/30/83 PLANT CHARACTERI5TICSt KEY P E R S 0 N N E L:
DOCKET NO:
05000470 LIC. PM:
G. MEYER ASLB CHAIR APPLICANT:
COMBUSTION ENGINEERING
'LIC. BC:
C.
THOMAS MEMBER 1:
LOCATION:
N/A LIC. LA.:
P. ANDERSON MEMBER 2:
REGION:
0 AE:
COUNSEL:
M. WAGNER CONST. INSP REAC. TYPE: PWR NSSS: COMB ANTITRUST:
RESID. INSP DESIGN PWR: 3800 MWT/1295 MWE CONST:
RM ANALYST:
S. HEDLUND 1
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE SER (NUREG-0852) issued 11/81.
SSER-1 was i ssued 03/30/83. SSER-2 issued on 09/21/83. All open issues ER DOCKETED:
have been resolved.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
i I
CURRENT ENV. STATUS:
N/A.
SAFETY / HEARING MILESTONES:
1 APPLICATION TENDERED:
10/27/78 10/27/78C SAR DOCKETED:
12/21/79 12/21/79C SAR Q'S RECEIVED BY PM:
09/01/80 09/01/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/15/81C CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
N/S N/A.
ISSUE DRAFT SER:
N/S I
INPUT TO SER:
11/01/81 11/13/81C ISSUE SER:
05/01/82 11/10/81C l
ACRS LETTER RECEIVED:
06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 2:
07/15/83 07/27/83C ISSUE SE SUPPLEMENT 2:
07/29/83 09/21/83C CURRENT ANTITRUST:
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A 4
COMMISSION DECISION:
12/00/83 SPECIAL PROJECT CCMPLETE:
11/31/83 LATEST AMENDMENT:
NEW SLIPS / MOTES:
f HRR LICE 1 SING SYSTEM PAGE NO: 2-37 (NSS)GESSAR SEVERE ACC FDA CURRENT STA TUS REPORT REPORT AS OF 11/30/83 i
PLANT CHARACTER IST I C S:
KEY P E R S O N N E L:
i DOCKET NO:
00007447 LIC. PM:
D.
SCALLETTI ASLB CHAIR: N/A APPLICANT:
GENERAL ELECTRIC COMPANY LIC. BC:
C.
THOMAS MEMBER 1:
N/A LOCATION:
N/A LIC. LA.
P.
ANDERSON MEMBER 2:
N/A REGION:
0 AE BRAUN COUNSEL:
B. BORDENICK CONST. INSP:
REAC. TYPE: BWR HSSS: GE ANTITRUST:
RESID. INSP:
DESIGN PWR: 3579 MWT/1220 MWE CONST:
RM ANALYST:
B.
ST MARY CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTULL DATF GESSAR II was docketed 02/82; review is in progress.
Dates shown reflect review for the severe accident ER DOCKETED:
design.
ER SITE VISIT COMPLETE:
INPUT TO DES TO PM:
ISSUE DES:
RESPONSE TO COMMENTS ON DES:
ISSUE FES:
r CURRENT ENV. STATUS:
)
SAFETY / HEARING MILESTONES:
APPLICATION TENDERED:
03/31/80 03/31/80C SAR DOCKETED:
02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:
09/08/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/01/83C CURRENT NRG. STATUS:
INPUT TO DRAFT SER TO PM:
ISSUE DRAFT SER:
INPUT TO SER:
06/1S/84 ISSUE SER:
07/15/84 ACRS FULL COMMITTEE MEETING:
09/00/84 INPUTS TO SE SUPPLEMENT 18 09/00/84 ISSUE SE SUPPLEMENT 1:
10/00/84 CURRENT ANTITRUST:
FDA antitrust review is in progress.
HEARING STARTED:
N/A ASLB INITIAL DECISION:
N/A COMMISSIDH DECISION:
N/A SPECIAL PROJECT COMPLETE:
10/00/84 LATEST AMENDMENT:
FSAR Amendment No. 19 was received in July, 1983.
NEW SLIPS / MOTES:
NRR LICENSING SYSTEM AS OF:11/30/83 NON-POWER REHEWALS INPUT ISSUE DOCKET EARLIEST ISSUEw TER ISSilE FES OR START ISSUE NON-POWER FACILITY NyMBER DOCKET Dil TO PM SER glA NEARING Q1 COMMENTS AFRRI 05000170 10/80C N/A 09/81C 01/82C N/A N/S N/S CONTESTED CASE 1000.0000KW TRIGA CORNELL UNIVERSITY 05000097 10/78C N/A 02/83C 09/83C 09/83C N/A 09/83C 1000KW CRITI GE TEST REACTOR 05000070 07/77C N/S N/S N/S N/S H/S H/S ORDER TO SHOW CAUSE.
ASLAB HEARINGS.
50.0000KW TANK GE, NTR 05000073 11/79C N/A 06/84 08/84 09/84 N/A 09/84 100.0000KW POOL IOWA STATE 05000116 09/79C N/A 08/83C 09/83C N/A N/A 10/83C 10.0000KW ARGHT MANHATTAN COLLEGE 05000199 08/83C N/A 08/84 10/84 N/A N/A 10/84
.0001KW CRITI MICHIGAN STATE 05000294 09/77C N/A 04/84 05/84 N/A N/A 06/84 250.0000KW TRIGA NBSR 05000184 12/80C 02/82C 09/82C 09/83C 09/82C N/A N/S POWER INCREASE TO 20 MW INCLUDED IN RENEWAL 10.0000KW TANK RENSSELAER 05000225 05/79C N/A 05/83C 10/83C 10/83C H/A 12/83C
.0000KW CRITI U. OF KANSAS 05000148 03/80C N/A 12/83 01/84 N/A N/A 04/84 250.0000KW POOL U. OF MD.
05000166 05/80C N/A 10/83C 01/84 H/A N/A C2/84 250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/7?C N/A 12/83 02/84 N/A N/A 03/84 200.0000KW POOL U. OF OKLA.
05000112 10/78C N/A 05/83C 09/83C 10/83C H/A 10/83C
.0150KW AGH U. OF UTAH 05000407 05/83C H/A 05/84 07/84 H/A N/A 07/84 100.0000KW TRIGA U. OF VA., CAVALIER 05000396 06/84 H/A 09/84 11/84 H/A N/A 12/84
.1000KW POOL UCLA, ARG0HAUT 05000142 02/80C N/A 10/82C 06/81C 06/81C 09/80C N/S CONTESTED CASE 100.0000KW ARGHT
...m m__
- ____m,
. ~.
._m.._._
.._.m,,
~
i I
l NRR LICENSING SYSTEM
' 83 NON-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEm TER ISSUE FES OR START ISSUE NON-POWER FACILITY NUMBER DOCKET Dil TO PM iga ELA HEARING Di COMMENTS UNION CARBIDE 05000054 05/80C N/ A '
10/82C 02/84 N/A N/A 03/84 5000.0000KW POOL t
VA. POLY. INSTITUTE 05000124 10/79C N/A 04/84 06/84 N/A N/A 06/84 100.0000KW ARGNT 4
WEST., TRAINING REACTOR 05000087 12/81C N/A 01/84 03/84 04/84 N/A 04/84 10.0000KW TANK N FOR TEST REACTORS ONLY I
f I
i i
4 y1.
.=
(
l
=
l l
M M
1 M
Z O
M U
kJ to 4
1
_- __ - ~_ _ - -
= _..
~
l NRR L ICEN5ING SYSTEM PAGE NO: 2-0L CURRENT STATUS REP 0R T REPORT AS OFe FLANT CHARACTERIST I C Sz KEY P E R S 0 N N E L:
DOCKET NO:
Docket No. or Project No.. if not dncheted LIC. PM:
Liunsmg Project Manager ASL B CH AIR: ASLB Chairman APPLICANT:
Utihty LIC. BC:
Licensing Branch Chief MEMBER 1:
on panet LOCATION:
Miles and dire.ction from nearest major town LIC.
LA..
Licensing Assistant MEMBER 2:
on panel REGION:
1 through 5 AE:
Architect / Engineer COUNSEL:
Attorney assigned to case CONS T. INSP : Construction inspector
]
REAC. TYPE: PWR, BWR. HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST:
Aatitrust Attorney RESID INSP: Resident inspector r
DESIGN PWR: Megawatts electric & thermal CONST Constructor MFA ANALYST: MPA analyst assigned to track proj,ect j
CURRENT SAF. STATUS:
ENVIRONMENTAL MILESTONES:
SCHED. DATE ACTUAL DATE i
Safety status for this reporting period only. It consists of accomphshments and schedule i
4 changes occurring since the last issue of Blue Book. Outstandmg issues and late input from ER DOCKETED:
Environmental Report i
review branches should be indicated, along with indication of the critical path.
P O
T Project Manager ISSUE DES Draft Environmental Statement RESPONSE TO COMMENTS ON DES:
ISSUE FES:
Final Environmental Statement j
1 CURRENT ENV. STATUS:
Environmental status for this reporting period only. It consists of accomplishments and schedula changes occurring since the last issue of Blue Book. Outstanding issues and late SAFELY / HEARING MILESTONES:
input from review branches should be indicated, APPLICATION TENDERED:
SAR DOCKETED:
Safety Analysis Report 1
SAR O'S RECEIVED BY PM:
SAR APPL. RESPONSE TO Q'S RECEIVED:
CURRENT HRG. STATUS:
INPUT TO DRAFT SER TO PM:
Changes m the hearing alates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:
contentions should be indicated.
INPUT T0 SER:
Safety Evaluation Report ISSUE SER:
ACRS LETTER RECEIVED:
Advisory Committee INPUTS TO SE SUPPLEMENT 3:
on Reactor Safeguards ISSUE SE SUPPLEMENT 3:
FEMA LETTER RECEIVED:
Safety Evaluation Supplement CURRENT ANTITRUST:
Changes in the antitrust status since the last issue of Blue Book.
HEARING STARTED:
ASLB INITIAL DECISION:
Atomic Safety & Licensing Board ASLB FINAL DECISION:
TECH SPECS COMPLETED:
j COMMISSION DECISION:
LATEST AMENDMENT:
ISSUE PARTIAL POWER LICENSE:
ISSUE FULL POWER LICENSE:
The latest amendment submitted by the applicant.
NEW SLIPS / NOTES:
Slips or potential problems that should be brought to management's attention.
CONSTRUCTION COMPLETION - APPL.a hfg,c i
te f not c o ange construction m construction completion completion
- t) c. ooVERNMENT PRINTING OFFICE: 1983-423*299:197 i
3
m 8e C,ORM 33lb u n %vtLE.H MtGv L.Taa v COMU+55 SON e AEPoR1 NuwstR #Amenes ey TsDC e, 40. <' eny8 BIBLIOGRAPHIC DATA SHEET NUREG-0580 Vol.-
, No.11
\\
y
> t
...<,...~,..u.,,.o7....
1., <..ss m <,
Regulator icensing Status Summary Report
- '"""f*,..a oo r.
g j
December (I 1983 6.U ? wCHiS8 7 o.TE HEPop ISSUEo MO8e T M vt.R Dec er 1983 W PH~
'I T.$EcWoRE UN.T NOMet M 81 Fi r45 0AW,NG OHG.*all.f to% %.W6. A t A.(;NG.QQHi g$ nag.,,gy fy, Coggyp Office of Resource Marftement Management Information anch fo..~ ~uw.ea U.S. Nuclear Regulatory
,ission J
Washington, D.C.
20555 j
ii 3,0ssoa.soo.a.sa.1,0,s
..~o...<,sa.0u s,,,,,.. z,ca.,
- u. rv,e o,
.,0a1 Office of Resource Management Management Information Branch U.S. Nuclear Regulatory Commission u
.a.oo cov e s o,,
e.,,,,
Washington, D.C. 20555 g
Nov.1,1983 - Nov. 30,1983 13 svPPLE YE NT.a v NOTES 47
....s1
.c 1,a -s, e, Provide a review of the status of the pro the licensing reviews for all construction permits, operating licenses? press o special rojects and non-power reactor renewals under review, as reported t ngress.
e?
/
/
.A b
4
?
/
T he W E w 40.a ps.No DOCvWt % T.N.L 1 *Jo DE SCR eP T CH $
t i 4
l'
...... <... t,1 31
- 1. m
> > s.,c,vg.,,c tass...ca r.o vo..a o,..c, s
Unclassified Unlimited j
5l,c,ugv ct.55a >ca m~
2a Pa'ce Unclassified s
i t
I
i l
l l
UNITED STATES
, '{"I'[g",55,",",'I, o NUCLEAR REGULATORY COMMISSION usmat i
i WASHINGTON, D C. 20555 AASM 3L i
,,,,,,g, ; g oFFIOAL BUSINESS PENAL,f y FOR PRIV ATE USt. SM i'
)
I I
l l
{
i 1
(n,l' l
~
r i.
Y s
i, i
T l
,' Jr
.f.,j a
4 el
' I
}'
in
'3 3;
l l
l l
l i
i i
i I
e 3
i n
4 4
l 3
i i
i l
4 4
3 i
l i
l